Development of pre-school infrastructure in the municipality of Dzierzkowice by building a kindergarten in m. turpentine (Q107582)

From EU Knowledge Graph
Revision as of 18:32, 22 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Development of pre-school infrastructure in the municipality of Dzierzkowice by building a kindergarten in m. turpentine
Project in Poland financed by DG Regio

    Statements

    0 references
    850,000.0 zloty
    0 references
    204,000.0 Euro
    13 January 2020
    0 references
    1,000,000.0 zloty
    0 references
    240,000.0 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    30 October 2015
    0 references
    30 September 2018
    0 references
    GMINA DZIERZKOWICE
    0 references

    50°57'30.2"N, 22°3'16.6"E
    0 references
    Głównym celem projektu jest wyrównanie szans dzieci z obszarów wiejskich poprzez zwiększenie dostępności do edukacji przedszkolnej na terenie Gminy Dzierzkowice. Realizacja celów głównego i szczegółowych zapewni poprawę jakości życia oraz wpłynie pozytywnie na poziom edukacji mieszkańców Gminy. Dodatkowo realizacja tak sformułowanego celu pozwoli na rozwiązanie problemów płynących z niedogodności związanych z istniejącą na terenie Gminy luką w infrastrukturze edukacyjnej. Wszystkie cele są pożądane i oczekiwane do spełnienia. Odbiorcy: mieszkańcy Gminy, rodzice dzieci w wieku przedszkolnym, pracownicy istniejącego Samorządowego Przedszkola w Terpentynie, samorząd lokalny, pracownicy UG, lokalni przedsiębiorcy, Projekt zakłada budowę nowego przedszkola o powierzchni użytkowej ok. 570 m2 parteru, w tym powierzchnię komunikacyjną oraz pomieszczeń sanitarno-higienicznych i technicznych, związanych obsługą obiektu. Liczba dzieci to 4 oddziały po 15, 18, 20 i 25 dzieci, co daje łączną liczbę 78. Budynek ma powstać na działce nr 207 i 208 w Terpentynie. Budynek o1 kondygnacji naziemnej, o wysokości min. 3,30 m. Wysokość kondygnacji max. 4,14 m z ociepleniem i warstwą wykańczającą. Obiekt dostępny dla osób niepełnosprawnych. W odniesieniu do wykorzystania nowoczesnych, energooszczędnych rozwiązań technicznych i technologicznych będzie zastosowane oświetlenie LED oraz solary na części dachu do uzyskiwania ciepłej wody, budynek będzie ogrzewany przy wykorzystaniu pieca gazowego . W ramach projektu zrealizowane zostaną następujące zadania Program funkcjonalno-użytkowy, Studium wykonalności, Dokumentacja techniczna, Nadzór inwestorski, Roboty budowlane, Promocja projektu oraz w ramach kosztów niekwalifikowanych Wyposażenie i Roboty budowlane. Realizacja projektu pozwoli na osiągnięcie wskaźników rezultatu zapisanych w Szczegółowym Opisie Osi Priorytetowych RPO WL Potencjał objętej wsparciem infrastruktury w zakresie opieki nad dziećmi lub infrastruktury edukacyjnej 78 os. (Polish)
    0 references
    The main objective of the project is to align the chances of rural children by increasing the availability of pre-school education in the municipality of Dzierzkowice. The achievement of the main and specific objectives will ensure an improvement in the quality of life and will have a positive impact on the level of education of the local population. In addition, the achievement of this objective will make it possible to address the problems caused by the disadvantages associated with the existing education infrastructure in the municipality. All objectives are desirable and expected to be met. Recipients: inhabitants of the municipality, parents of preschool children, employees of the existing Municipal Government in turpentine, local government, UG staff, local entrepreneurs, the project will build a new kindergarten with useful floor area. 570 m² of ground floor, including the area of communication and sanitary and hygienic facilities, associated with the facility. The number of children comprises 4 units of 15, 18, 20 and 25 children, giving a total of 78. The building is to be built on plot No 207 and 208 in turpentine. A building with 1 ground floor height, with a height of at least 3.30 m. height of floor height: 4.14 m with warming and finishing. Facilities accessible to disabled persons. With regard to the use of modern, energy-efficient technical and technological solutions, LED lighting and solar panels will be used for hot water, the building will be heated by using a gas furnace. The project will carry out the following tasks: the functional utility programme, the feasibility study, the technical documentation, the investor’s supervision, the construction works, the promotion of the project and the costs of non-eligible construction equipment and works. Implementation of the project will result in the achievement of result indicators in the Detailed Description of Priority Axes of the ROP WL Potential supported infrastructure for childcare or education infrastructure 78. (English)
    0 references

    Identifiers

    RPLU.13.05.00-06-0017/15
    0 references