Thermal renovation of the community building in Jabłoń at ul. Licript 4 (Q105515)

From EU Knowledge Graph
Revision as of 18:18, 22 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Thermal renovation of the community building in Jabłoń at ul. Licript 4
Project in Poland financed by DG Regio

    Statements

    0 references
    863,390.61 zloty
    0 references
    207,213.74639999997 Euro
    13 January 2020
    0 references
    1,015,753.67 zloty
    0 references
    243,780.88 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    10 January 2019
    0 references
    31 December 2020
    0 references
    WSPÓLNOTA MIESZKANIOWA W JABŁONIU PRZY UL. LIPOWEJ 4
    0 references
    0 references
    Przedmiotem projektu jest głęboka modernizacja energetyczna budynku mieszkalnego wielorodzinnego, zlokalizowanego w miejscowości Jabłoń przy ul. Lipowej 4. W ramach kosztów kwalifikowalnych planuje się docieplenie ścian zewnętrznych wraz z wykonaniem wyprawy elewacyjnej z tynku silikatowego, docieplenie ścian zewnętrznych piwnic wraz z wykonaniem wyprawy elewacyjnej z tynku silikatowego na cokole, docieplenie stropu nad ostatnią kondygnacją, docieplenie płyt żelbetowych nad wejściami głównymi, płyt balkonowych, attyk i gzymsów wraz z wykonaniem wyprawy elewacyjnej z tynku silikatowego, wymiana istniejących okien i okien balkonowych, wymiana istniejących drzwi wejściowych, wykonanie izolacji przeciwwilgociowej ścian fundamentowych, wykonanie nowej instalacji c.w.u. wraz ze zmianą źródła ciepła na pompy ciepła, wymiana instalacji c.o. zasilanej pompami ciepła wraz z wymianą pionów i grzejników, wymiana źródła ciepła do ogrzewania i c.w.u. na 2 pompy ciepła woda-glikol w układzie kaskadowym, wykonanie 10 odwiertów w ramach sond gruntowych, każdy o głębokości 100 m, wykonanie instalacji fotowoltaicznej zasilającej pompy, w postaci 40 paneli umiejscowionych na dachu. Roczne zwiększenie efektywności energetycznej modernizowanego budynku wynikające z audytu energetycznego wynosi 93,78%. Pozostały zakres rzeczowy projektu obejmuje: studium wykonalności, dokumentację techniczną, wdrożenie systemu zarządzania energią, nadzór inwestorski, promocję projektu, zarządzanie projektem. (Polish)
    0 references
    The object of the project is the deep energy renovation of a multi-apartment residential building, located in Jabłoń, ul. Lip 4. The eligible costs are linked to the insulation of external walls, along with the completion of façade of silica, the insulation of the outdoor walls of the basement, the insulation of the external walls of the basement, the insulation of the roof wall over the last floor, the insulation of the overhead plate over the top floors, the replacement of existing windows and balcony windows, the replacement of the existing input doors, the insulation of the roof wall, the replacement of the heat pump for heating and the replacement of the heat pump, the replacement of the heating plant with heat pumps and radiators, replacement of the heating plant with heat pumps and radiators, replacement of the heating heat pump and radiators, replacement of the heating plant with heating pumps and radiators, replacement of the heating plant with heating pumps and radiators, replacement of the heating plant with heating pumps and radiators, replacement of the heating plant with heating pumps and radiators, replacement of the heating plant with heating pumps and radiators, replacement of the heating plant with heating pumps and radiators, replacement of the heating plant with heating pumps and radiators, replacement of the heating plant with heating pumps and radiators, replacement of the heating plant with heating pumps and radiators, replacement of the heating plant with heating pumps and radiators, replacement of the heating plant with heating pumps and radiators, replacement of the heating plant with heating pumps and radiators, replacement of heating plants for heating and heating. at 2 water pumps, each with a depth of 100 m, the execution of a photovoltaic installation for the pump, in the form of 40 panels on the roof. The annual increase in the energy efficiency of the modernised building resulting from the energy audit is 93.78 %. The remaining scope of the project includes: feasibility study, technical documentation, implementation of the energy management system, investor supervision, project management. (English)
    0 references

    Identifiers

    RPLU.05.03.00-06-0031/19
    0 references