Installation of solar collectors and biomass boilers within the municipality of Radaznica (Q104651)

From EU Knowledge Graph
Revision as of 17:52, 22 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Installation of solar collectors and biomass boilers within the municipality of Radaznica
Project in Poland financed by DG Regio

    Statements

    0 references
    4,824,405.67 zloty
    0 references
    1,157,857.3608 Euro
    13 January 2020
    0 references
    5,675,771.38 zloty
    0 references
    1,362,185.13 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    19 February 2016
    0 references
    30 November 2019
    0 references
    GMINA RADECZNICA
    0 references
    Projekt (P.) zlokaliz. będzie na ter. woj. lubel., w pow. zamojskim., w gm. Radecznica(GW).Teren P. obejmuje 19 miejsc. w GR. Zakres P. zakłada instalację 558 szt. zestaw. kol. słon. [~1,7088 MW] w obiekt. prywat. do podgrz. CWU oraz 75 szt. pieców CO na biomasę [~1,6550 MW] o łącznej sum. mocy 3,3636 MW. P. przewid. również zaprojekt. i wykon. portalu internet., który będzie pełnił funkcje eduk., promoc. oraz oferował usługi on-line. Łączna liczba mieszk. GR korzyst. (GR. DOCEL.) z efektów realiz. P. wyniesie ok.2500 w 633 obiekt. Instalacje, będące przez cały okres trwałości (5lat) własn. GR, zost. usytuow. na budyn. stanow. własn. osób prywat., z którymi GR. podpisała um. użycz. GŁÓWNYM CELEM P. jest zwiększ. stosow. OZE na terenie GR. Cele szczegół.: CEL 1: Upowszechn. [ ] - [3,3636MW w 2018r.].; CEL 2: Zmniejsz. obciążeń [ ] - [2 161,98 Mwht/rok od 2019r.]; CEL 3: Reduk. [ ] - [1 114,95 t. ekwiwal. CO2 / rok od 2019r.]. P. przycz. się do realiz. zarówno celu prioryt. 4 (zakład. wsparcie wytwarz. i wykorz.. ener. pochodz. z OZE), jak i celu główn. RPO WL, tj. podn. konkurencyj. regionu w oparciu o wewn. potencj., sprzyjaj. zwiększ. spójn. społ. i terytor. P., obok korz. społ. i gosp. będzie wpływ. na skuteczniejsze przeciwdzi. zmianom klimatu. Na podst PROGR. OCHR. POWIETRZA DLA STREFY LUBELSK. w GR. nie stwierdzono przekr. choćby jednego poziomu dopuszcz. lub docel. w odniesieniu do subst. podleg. ocenie jakości powietrza. P. wpis. się w cele operac. (2.5- Wyposaż. Obsz. Wiej. w infrastr. transp., komun., energet.; 3.6 - Rozw. społ. Informac. [uruch. Serw. www] w stand. WCAG 2.0]; 4.5 - Racjonal. i efektyw. wykorzysta. zasob. przyr. dla potrzeb gosp. i rekreac., przy zachow. i ochron. walorów środ. przyrodn.) wskaz. w SRWL 2014-2020. GW. Usytuow. jest w (OSI): Nowoczes. wieś. P. w części realizow. będzie na obsz. Nat.2000. (Polish)
    0 references
    The project (P) will be located in the ter. region of the lubel province. [~ 1.7088 MW] on the promised privacy. CWU and 75 biomass biomass furnaces [~ 1.6550 MW] with a cumulative total capacity of 3.3636 MW. It will also be designed and implemented on the Internet, which will serve as a function of education and training, as well as online services. Total number of bellows. GR. Objective.) with implementation effects. The envelope will amount to 2500 in 633. Installations which have been owned for 5 years throughout their life (s). Gr. I am going to the building, with which GR. has signed a um. loan. The main objectives of the CEM are increased. RES in GR. OBJECTIVE 1: Widespread. — [3.3636 MW in 2018]; OBJECTIVE 2: Measure — [2 161,98 MWHT/year since 2019]; OBJECTIVE 3: Reduce. — [1 114.95 t. CO2/rok since 2019]. It is part of both the priorite objective. 4 (installation of energy from RES) as well as the head. The ROP ROP, i.e. the region’s competitiveness on the basis of a major major player, who is conducive to increased social and territorial cohesion. P., together with the social and economic roots, will be influential in tackling climate change in a more effective way. On the reserve of PROGR. OCHR. Air DLA STREFY LUBELSKH GR. has not seen at least one level of pass or target in the air quality assessment. They are part of the operational objectives. (2.5- equip. You cut. Consumer Infrastructure, Switch-over, Energy.; 3.6 — Social matters Information. [Uruguayan. WWW, in the stand. WCAG 2.0]; 4.5 — Racijon. and a resource efficient. for business and recreation, and with respect to conservation and security purposes, see SRWL 2014-2020. GW. It is a location in (OSI): Romania’s village. You will be part of the game. Nat.2000. (English)
    0 references

    Identifiers

    RPLU.04.01.00-06-0026/16
    0 references