Upgrading of selected stations on the Warsaw — Dorohusk section of railway line No 7, with the railway station of Krasnik situated on the line 68 (Q86007)

From EU Knowledge Graph
Revision as of 21:06, 15 July 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Upgrading of selected stations on the Warsaw — Dorohusk section of railway line No 7, with the railway station of Krasnik situated on the line 68
Project in Poland financed by DG Regio

    Statements

    0 references
    67,083,422.44 zloty
    0 references
    16,100,021.385599999 Euro
    13 January 2020
    0 references
    78,921,673.47 zloty
    0 references
    18,941,201.63 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2017
    0 references
    31 December 2021
    0 references
    POLSKIE KOLEJE PAŃSTWOWE S.A.
    0 references
    0 references
    0 references

    50°58'34.3"N, 22°47'56.8"E
    0 references

    52°32'46.3"N, 21°12'26.3"E
    0 references
    Zakres prac obejmuje: - budowę lub przebudowę i modernizację istniejących obiektów 17 dworców wchodzących w zakres projektu, - wykonanie prac wykończeniowych wnętrz i na zewnątrz budynków zgodnie ze specyfikacją szczegółową opracowaną dla każdego z dworców, - dostosowanie obiektów do potrzeb osób niepełnosprawnych zgodnie z wytycznymi TSI-PRM, - zagospodarowanie terenów wokół dworców w tym m.in. wymianę nawierzchni, nasadzenia zieleni, elementy małej architektury, budowa infrastruktury rowerowej, - budowę dróg dojazdowych i parkingów przed dworcami, - przywrócenie historycznego wyglądu obiektów w zakresie podlegającym ochronie konserwatorskiej, - prace rozbiórkowe infrastruktury towarzyszącej, - zintegrowanie dworców z innymi środkami transportu. Zakres prac w zakresie poszczególnych dworców znajduje się w rozdziale 7 Studium Wykonalności. (Polish)
    0 references
    This work comprises:— construction or upgrading and upgrading of existing stations of 17 stations falling within the scope of the project — completion of interior and outdoor completion of buildings in accordance with the detailed specifications drawn up for each of the stations, — adaptation of facilities to the needs of persons with disabilities, in accordance with the TSI-PRM guidelines, — development of areas around the railway station including inter alia replacement of pavements, planting of green spaces, small architectural features, construction of cycling infrastructure, construction of service roads and parking facilities in front of stations, — restoration of historical appearance of facilities in the area covered by maintenance, — demolition works of transport infrastructure, — integration of stations with other modes of transport.The scope of work in the field of individual stations is provided in Chapter 7 of the Feasibility Study. (English)
    0 references

    Identifiers

    POIS.05.01.00-00-0036/18
    0 references