Construction of a photovoltaic installation with an installed capacity of 39,9 kWp on administrative and technical buildings PGK sp. z o.o. in Koszalin (Q137709)

From EU Knowledge Graph
Revision as of 00:16, 23 June 2020 by DG Regio (talk | contribs) (‎Removed claims)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of a photovoltaic installation with an installed capacity of 39,9 kWp on administrative and technical buildings PGK sp. z o.o. in Koszalin
Project in Poland financed by DG Regio

    Statements

    0 references
    76,664.49 zloty
    0 references
    18,399.477600000002 Euro
    13 January 2020
    0 references
    45.0 percent
    0 references
    3 April 2017
    0 references
    7 July 2017
    0 references
    PRZEDSIĘBIORSTWO GOSPODARKI KOMUNALNEJ SP. Z O.O.
    0 references
    0 references
    Projekt przewiduje budowę dachowej mikroinstalacji fotowoltaicznej pracującej w układzie otwartym na sieć tzn. on-grid o mocy wytwórczej 39,9 kW. Głównymi elementami instalacji są panele polikrystaliczne mocowane na stalowo-aluminiowej konstrukcji wsporczej oraz infrastruktura towarzyszącą, obwody DC, obwody AC oraz inwerter fotowoltaiczny, obwody wizualizacji pracy, instalacja odgromowa. Inwestycja realizowana będzie na terenie siedziby PGK sp. z o.o. na dachach budynku administracyjnego oraz budynków warsztatowych. Zaprojektowano mikroinstalację fotowoltaiczną umieszczoną na dachach trzech obiektów stanowiących dwa budynki tj. A i D zlokalizowane przy ul. Komunalnej 5 w Koszalinie. Moc wytwórcza przedmiotowej mikroinstalacji wynosić będzie 39,9kW. Przewidziano przyłączenie jej do wewnętrznej instalacji elektrycznej obiektu za układem pomiarowo-rozliczeniowym (netto) zlokalizowanym w narożniku budynku A. Optymalizacji projektowanej mikroinstalacji dokonano pod kątem maksymalnej konsumpcji energii wyprodukowanej na własne potrzeby obiektów komunalnych, redukując możliwość powstawania nadwyżek generacyjnych do minimum. Obiekty budowlane na dachach których zaprojektowano mikroinstalację fotowoltaiczną przyłączone są do sieci dystrybucyjnej lokalnego operatora tj. ENERGA Operator S.A. ze wspólnym punktem PPE: 480037530116743456. Granica eksploatacji znajduje się na zaciskach prądowych w złączu kablowo-pomiarowym zabudowanym w narożniku budynku A od strony ul. Komunalnej – w ramach niniejszego projektu nie przewiduje się zmiany istniejącej granicy eksploatacji a produkowana energia zużywana będzie na potrzeby własne obiektu. (Polish)
    0 references
    The project envisages the construction of a rooftop micro-photovoltaic equipment operating in an open circuit, i.e. an on-grid with a generation capacity of 39.9 kW. The main components of the installation are polycrystalline panels fixed to the aluminium, the aluminium support structure and the associated infrastructure, the DC circuits, the AC circuits and the solar inverter, visualisation of the job, the lightning system. The investment will be carried out at the premises of PGK sp. z o.o. on the roof of the administrative building and of workshop buildings. The solar micro-installation is designed on the roof of three buildings constituting two buildings, i.e. A and D located at ul. Municipal authority 5 in Koszalin. The capacity of the micro-installation concerned will be 39.9 kW. It is envisaged that it will be connected to the internal electrical installation of a facility with a (net) metering system (net) located in the corner of Building A. Optimising the planned micro-installation has been made in the light of the maximum consumption of energy produced for the own use of the municipal facilities, reducing the possibility of generating surpluses to a minimum. The construction works on the roofs of which the photovoltaic micro-installation is designed are connected to the distribution network of the local operator, i.e. ENGA Operator S.A. with a common EPP point: 480037530116743456. The operating limit is located at the current terminals of the junction of the cable and the corner of the Building A on the side of the Building. In the context of this project, no change in the existing operating boundary is foreseen, and the energy produced will be consumed for the facility’s own needs. (English)
    0 references

    Identifiers

    RPZP.02.10.00-32-A095/16
    0 references