Improvement of the energy efficiency of the building of the Primary School in Poland, using renewable energy installations and conversion of the heating system. (Q100293)

From EU Knowledge Graph
Revision as of 16:54, 22 June 2020 by DG Regio (talk | contribs) (‎Removed claims)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Improvement of the energy efficiency of the building of the Primary School in Poland, using renewable energy installations and conversion of the heating system.
Project in Poland financed by DG Regio

    Statements

    0 references
    692,571.4 zloty
    0 references
    166,217.136 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    19 February 2016
    0 references
    30 April 2018
    0 references
    GMINA DREZDENKO
    0 references

    52°50'22.2"N, 15°49'50.5"E
    0 references
    Przedmiotem projektu jest przeprowadzenie prac termomodernizacyjnych, polegających na ociepleniu ścian zewnętrznych i stropodachu, modernizacji instalacji c.o. i c.w.u. oraz montaż instalacji fotowoltaicznej na budynku Szkoły Podstawowej w Niegosławiu. Działania te przyczynią się do realizacji celu głównego projektu, jakim jest poprawa efektywności energetycznej budynku Szkoły. Cel ten zostanie zrealizowany poprzez realizację celów bezpośrednich jakie wynikają z analizy problemów i potrzeb Beneficjenta. Są to mianowicie: Ograniczenie strat energii podczas ogrzewania budynku oraz obniżenie kosztów ogrzewania; Redukcja emisji zanieczyszczeń do powietrza atmosferycznego, a tym samym poprawa czystości powietrza na terenie Gminy Drezdenko; Poprawa warunków użytkowania obiektu oraz zwiększenie komfortu nauki i pracy. Cel nadrzędny projektu zostanie zrealizowany przez osiągnięcie celów szczegółowych produktu i rezultatu. Cele na poziomie rezultatu to: Szacowany roczny spadek emisji gazów cieplarnianych 131,05 tony równoważnika CO2/rok Zmniejszenie rocznego zużycia energii pierwotnej w budynkach publicznych 147 000 kWh/rok Produkcja energii elektrycznej z nowo wybudowanych/nowych mocy wytwórczych instalacji wykorzystujących OZE 4,693 MWhe/rok Ilość zaoszczędzonej energii cieplnej 380 GJ/rok Zmniejszenie zużycia energii końcowej w wyniku realizacji projektów 380 GJ/rok Cele projektu na poziomie produktu to: Liczba zmodernizowanych energetyczne budynków 1 szt. Dodatkowa zdolność wytwarzania energii elektrycznej ze źródeł odnawialnych 0,00099 MWe Liczba wybudowanych jednostek wytwarzania energii elektrycznej z OZE 1 szt. Powierzchnia użytkowa budynków poddanych termomodernizacji 1 199 m2 Liczba zmodernizowanych źródeł ciepła 1 szt. Wnioskodawca zamierza zrealizować inwestycję w ramach 4 zadań: 1 Prace przygotowawcze 2 Prace termomodernizacyjne z wykorzystaniem OZE w trybie zaprojektuj i wybuduj 3 Nadzór inwestorski 4 Promocja projektu Korzyśc (Polish)
    0 references
    The subject of the project is the thermal modernisation of external walls and walls, the modernisation of the heating and cooling installations and the installation of a photovoltaic installation on the building of the Primary School in Poland. These activities will contribute to the main project’s objective of improving the energy efficiency of the school building. This objective will be achieved through the achievement of the direct objectives resulting from the analysis of the problems and the needs of the beneficiary. These are notably: Reducing energy losses while heating the building and lowering heating costs; Reduction of pollutant emissions to ambient air, thereby improving the cleanliness of the air in the area of Dresden; Improving the conditions for use of the facility and improving the quality of science and work. The objective of the project will be achieved through the achievement of the specific objectives of the output and result. The objectives at the result level are: An estimated annual decrease in greenhouse gas emissions of 131,05 tons of GHG equivalent CO2/rok reduction of annual primary energy consumption in public buildings 147 000 kWh/year of electricity from newly built/new generation capacity of installations using RES 4,693 MWhe/year The quantity of thermal energy saved 380 GJ/year reduction of final energy consumption as a result of the implementation of the projects 380 GJ/year The project objectives at product level are: Number of modernised energy buildings 1 Additional renewable electricity capacity 0,00099 MWe Number of units of production of electricity from RES 1 built Useful floor area of buildings renovated 1 199 m² Number of upgraded heat sources 1. The applicant intends to implement the investment under 4 tasks: 1 Preparatory work 2 Fusion for energy renovation works using a design and demolition 3 Investment Surveillance 4 Investment promotion Promotion of the benefit of the project (English)
    0 references

    Identifiers

    RPLB.03.02.01-08-0006/16
    0 references