Reconstruction — Modernisation with the retrofitting of the Local Self-Government Service in Tuplice (Q100990)
Jump to navigation
Jump to search
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Reconstruction — Modernisation with the retrofitting of the Local Self-Government Service in Tuplice |
Project in Poland financed by DG Regio |
Statements
775,126.06 zloty
0 references
82.46 percent
0 references
15 September 2016
0 references
30 September 2018
0 references
GMINA TUPLICE
0 references
Projekt polega na poprawie standardu edukacji przedszkolnej w gminie Tuplice poprzez przebudowę wraz generalnym remontem sal dydaktycznych, łazienek, gabinetu dyrekcji, pokoju nauczycielskiego, sali rytmiki (gimnastycznej), remontem i adaptacją pomieszczenia gospodarczego na gabinet logopedyczny, przebudowa pomieszczenia gospodarczego na magazyn wyposażenia przy sali rytmiki, remont korytarzy i schodów. Dostawa odpowiadającego najnowszym trendom wyposażenia dydaktycznego. Wykonanie nowego pokrycia dachu wraz z instalacją odgromową i rynnami. Wykonanie nowych instalacji: elektrycznej, wodnej i kanalizacyjnej. Zagospodarowanie terenu działki pod plac zabaw. Wymienione działania planowane są do realizacji w systemie „Zaprojektuj i Wybuduj”. Problemem głównym projektu jest niewystarczająca jakość infrastruktury oświatowej w Gminie Tuplice, co ogranicza rozwój dzieci w wieku przedszkolnym. Grupy docelowe: •Wychowankowie Samorządowego Przedszkola w Tuplicach •Osoby niepełnosprawne •Władze Gminy Tuplice •Kadra nauczycielska •Mieszkańcy Gminy Tuplice Głównym celem projektu jest poprawa jakości infrastruktury oświatowej w Gminie Tuplice umożliwiającej rozwój dzieci w wieku przedszkolnym. Zakres rzeczowy obejmuje: •Roboty przygotowawcze •Roboty budowlane •Roboty instalacyjne – elektryczne •Roboty instalacyjne – sanitarne •Wyposażenie •Zagospodarowanie terenu na plac zabaw Projekt będzie wdrażany poprzez działania: •Promocja projektu •Nadzór inwestorski W efekcie realizacji projektu zostaną osiągnięte następujące rezultaty: •Wzrost zatrudnienia we wspieranych podmiotach (innych niż przedsiębiorstwa): 1 EPC (1 kobieta) •Liczba użytkowników infrastruktury przedszkolnej wspartej w programie: 125 osób Najważniejsze etapy proj.: •wybór wykonawcy robót budowlanych i dostawcy wyposażenia, •wykonanie robót i odbiór techniczny prac budowlanych, •dostawa wyposażenia, •rozliczenie. Okres realizacji projektu obejmuje 09.2016-06.2018.[...] (Polish)
0 references
The project consists of improving the standard of pre-school education in the municipality of Tuplice by converting, with a general view, the renovation of the teaching rooms, bathrooms, the directorate’s private office, the teaching room, the rhythmic (gymnastics), renovation and adaptation of the economic room of the speech therapy, the refurbishment of the economic room into a magazine of equipment in the room, the renovation of the corridors and stairs. Delivery of the latest training of the teaching equipment. Construction of a new roof covering with a lightning and gutter installation. Installation of new installations: electricity, water and sanitation. The development of a plot of land under a playground. These actions are planned to be implemented in the “Design and demolition” system. The main problem of the project is the insufficient quality of the school infrastructure in the municipality of Tuplice, which limits the development of pre-school children. The target groups: • Education in Tuplice• People with disabilities• People with disabilities• Municipal authorities of Tuplice• Kadda teacher• Residents of the Municipality of Tuplice, The main aim of the project is to improve the quality of the education infrastructure in the municipality of Tuplice for the development of pre-school children. The material scope consists of: • Preparatory work• Construction works• Installation work — Electrical• Installation work — Sanitary equipment• Equipment• Site management in a playground site, the project will be implemented through: • Project promotion• Investor’s supervision The effect of the project will be to achieve the following results: • Increase in employment in supported entities (other than enterprises): 1 FTE (1 female)• Number of users of the pre-school infrastructure supported by the programme: 125 persons who are the most important steps in the proj.: • Selection of contractors and suppliers of equipment,• execution of works and collection of technical works,• supply of equipment,• settlement. The project implementation period shall include 09.2016-06.2018. [...] (English)
0 references
Identifiers
RPLB.09.03.01-08-0011/17
0 references