Thermomodernisation of public utilities, buildings: Regional Roads Division in Inowrocław, Provincial Roads Authority in Żolęczów (Q98155)

From EU Knowledge Graph
Revision as of 16:36, 22 June 2020 by DG Regio (talk | contribs) (‎Removed claims)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Thermomodernisation of public utilities, buildings: Regional Roads Division in Inowrocław, Provincial Roads Authority in Żolęczów
Project in Poland financed by DG Regio

    Statements

    0 references
    246,333.38 zloty
    0 references
    59,120.0112 Euro
    13 January 2020
    0 references
    73.28 percent
    0 references
    1 February 2017
    0 references
    30 November 2018
    0 references
    WOJEWÓDZTWO KUJAWSKO-POMORSKIE
    0 references
    W ramach projektu przewidziano realizację działań termomodernizacyjnych w 2 obiektach użyteczności publicznej, tj. Rejonie Dróg Wojewódzkich w Inowrocławiu i Rejonie Dróg Wojewódzkich w Żołędowie. W w/w budynkach ściany, okna oraz drzwi charakteryzują się zbyt dużymi współczynnikami przenikania ciepła, wskutek czego znacząca część energii cieplnej jest tracona, a co za tym idzie zwiększeniu ulegają koszty eksploatacyjne. Celem bezpośrednim projektu jest ograniczenie strat ciepła, ekonomiczne wykorzystanie energii cieplnej oraz zwiększenie funkcjonalności 2 obiektów użyteczności publicznej, tj. poprawa efektywności energetycznej budynku Rejonu Dróg Wojewódzkich w Inowrocławiu o 46,6% (redukcja CO2 -43,7%) oraz budynku Rejonu Dróg Wojewódzkich w Żołędowie o 52,7% (redukcja CO2 - 52,7%), zrealizowana do 30.11.2018 roku. Cel bezpośredni projektu przełoży się natomiast na celepośrednie, tj. uzyskanie oszczędności zużycia kosztów energii cieplnej oraz poprawa jakości środowiska naturalnego, w tym pozytywny wpływ w zakresie łagodzenia zmian klimatu poprzez ograniczenie emisji gazów cieplarnianych do atmosfery. Zakres działań obejmie w RDW Inowrocław: wykonanie ocieplenia ścian od zewnątrz, wykonanie ocieplenia stropodachu niewentylowanego, wymianę drewnianej stolarki drzwiowej oraz w RDW Żołędowo wykonanie ocieplenia ścian od zewnątrz, wykonanie ocieplenia stropodachu niewentylowanego, wymianę drewnianej stolarki okiennej, wymianę stalowej stolarki drzwiowej, montaż zaworów termostatycznych przy grzejnikach.Podstawowe produkty i rezultaty projektu to:-Liczba zmodernizowanych energetycznie budynków: 2 [szt.],-Zmniejszenie rocznego zużycia energii pierwotnej w budynkach publicznych: 139816,5 [kWh/rok],-Szacowany roczny spadek emisji gazów cieplarnianych: 19,17 [tony równoważnika CO2],Projekt realizowany będzie w okresie luty 2017 r. – listopad 2018 r. Wartość całkowita projektu wynosi 397216,01 zł, w tym wydatki kwalifikowalne 336163,04 zł. (Polish)
    0 references
    The project foresees the implementation of thermomodernisation measures in 2 public utility sites, i.e. Voivodship Roads Division in Inowrocław and the Regional Road Poland in Żelęczów. In/on the wall, the windows and the doors are characterised by too large heat transfer coefficients, as a result of which a significant part of the thermal energy is lost and thus the operating costs are increased. The direct objective of the project is to reduce heat losses, the economic use of heat and the increase of the functionality of 2 public utilities, i.e. the improvement of the energy efficiency of the Regional Roads Government Building in Inowrocław by 46.6 % (CO2-43.7 % reduction) and a 52.7 % reduction of CO2-52.7 % CO30.11.2018-reduction in Inowrocław. By contrast, the direct objective of the project will be translated into intermediate values, i.e. savings in the consumption of thermal energy costs and the improvement of the quality of the environment, including positive effects on climate change mitigation by reducing greenhouse gas emissions into the atmosphere. The scope of the activities will be in the WFD Inowrocław: the insulation of the walls of the outdoor wall, the implementation of the warming of the non-ventilated fabric, the replacement of the wooden door joinery and the water wall of the walls of the external wall, the implementation of the warming of the non-ventilated wood joinery, the replacement of the wooden window frames, the replacement of the door frames, the installation of thermostatic valves for radiators, the main products and deliverables of the project are: -Number of energy modernised buildings: 2 [units] — Reduction of annual primary energy consumption in public buildings: 139816,5 [kWh/year], -Szazane annual decrease in greenhouse gas emissions: 19,17 [tonnes of CO2 equivalent] The project will run from February 2017 to November 2018. the total value of the project is PLN 397216,01 including eligible expenditure of PLN 336163,04. (English)
    0 references

    Identifiers

    RPKP.03.03.00-04-0011/17
    0 references