2020 — ERDF — SAS METHA 2 G: CREATION OF A METHANISATION UNIT FOR BIOMETHANE INJECTION INTO THE GRDF NETWORK AT LARGE CAMP 27270 (Q3681800)

From EU Knowledge Graph
Revision as of 02:08, 9 October 2024 by DG Regio (talk | contribs) (‎Set a claim value: summary (P836): Construção da unidade de metanização da SAS METHA 2G no município de GRAND-CAMP para a injeção de biometano na rede de distribuição GRDF. O caudal previsto é de 95 Nm3/h para a produção de energia primária PCS da ordem dos 8 622 MWh.)
Jump to navigation Jump to search
Project Q3681800 in France
Language Label Description Also known as
English
2020 — ERDF — SAS METHA 2 G: CREATION OF A METHANISATION UNIT FOR BIOMETHANE INJECTION INTO THE GRDF NETWORK AT LARGE CAMP 27270
Project Q3681800 in France

    Statements

    0 references
    858,885.30 Euro
    0 references
    3,435,541.21 Euro
    0 references
    25.0 percent
    0 references
    31 January 2020
    0 references
    30 December 2022
    0 references
    SAS METHA 2 G
    0 references
    0 references

    49°0'23.26"N, 0°31'25.68"E
    0 references
    27270
    0 references
    Construction de l'unité de méthanisation de la SAS METHA 2G sur la commune de GRAND-CAMP pour l'injection du bio méthane dans le réseau de distribution GRDF. Le débit prévu est de 95 Nm3/h pour la production d'une énergie primaire PCS de l'ordre de 8 622 MWh (French)
    0 references
    Construction of the methanisation unit of SAS METHA 2G in the commune of GRAND-CAMP for the injection of biomethane into the GRDF distribution network. The planned flow rate is 95 Nm3/h for the production of primary PCS energy of the order of 8 622 MWh (English)
    18 November 2021
    0.0554622794720454
    0 references
    Bau der Methananlage der SAS METHA 2G in der Gemeinde GRAND-CAMP für die Einspeisung von Biomethan in das Verteilernetz GRDF. Für die Erzeugung von Primärenergie PCS im Bereich von 8 622 MWh wird ein Durchsatz von 95 Nm3/h erwartet. (German)
    1 December 2021
    0 references
    Bouw van de methanisatie-eenheid van SAS METHA 2G in de gemeente GRAND-CAMP voor de injectie van biomethaan in het distributienet van GRDF. Het geplande debiet bedraagt 95 Nm3/h voor de productie van primaire PCS-energie in de orde van grootte van 8 622 MWh (Dutch)
    6 December 2021
    0 references
    Costruzione dell'unità di metanizzazione di SAS METHA 2G nel comune di GRAND-CAMP per l'iniezione di biometano nella rete di distribuzione GRDF. La portata prevista è di 95 Nm3/h per la produzione di energia primaria PCS dell'ordine di 8 622 MWh (Italian)
    13 January 2022
    0 references
    Construcción de la unidad de metanización de SAS METHA 2G en el municipio de GRAND-CAMP para la inyección de biometano en la red de distribución GRDF. El caudal previsto es de 95 Nm3/h para la producción de energía primaria PCS del orden de 8 622 MWh (Spanish)
    14 January 2022
    0 references
    SAS METHA 2G metaanistamisüksuse ehitamine GRAND-CAMP kommuunis biometaani sisestamiseks GRDFi jaotusvõrku. Kavandatud vooluhulk on 95 Nm3/h PCS primaarenergia tootmiseks suurusjärgus 8 622 MWh. (Estonian)
    11 August 2022
    0 references
    SAS METHA 2G metanizacijos bloko statyba GRAND-CAMP komunoje biometanui įleisti į GRDF paskirstymo tinklą. Planuojamas srautas yra 95 Nm3/h pirminės PCS energijos gamybai 8 622 MWh. (Lithuanian)
    11 August 2022
    0 references
    Izgradnja jedinice za metanizaciju SAS METHA 2G u općini GRAND-CAMP za ubrizgavanje biometana u distribucijsku mrežu GRDF-a. Planirana brzina protoka iznosi 95 Nm3/h za proizvodnju primarne energije PCS-a reda 8 622 MWh (Croatian)
    11 August 2022
    0 references
    Κατασκευή της μονάδας μεθανιοποίησης του SAS METHA 2G στην κοινότητα GRAND-CAMP για την έγχυση βιομεθανίου στο δίκτυο διανομής GRDF. Ο προβλεπόμενος ρυθμός ροής είναι 95 Nm3/h για την παραγωγή πρωτογενούς ενέργειας PCS της τάξης των 8 622 MWh (Greek)
    11 August 2022
    0 references
    Výstavba metánovej jednotky SAS METHA 2G v obci GRAND-CAMP na vstrekovanie biometánu do distribučnej siete GRDF. Plánovaný prietok je 95 Nm3/h pre výrobu primárnej energie PCS rádovo 8 622 MWh (Slovak)
    11 August 2022
    0 references
    SAS METHA 2G:n metanointiyksikön rakentaminen GRAND-CAMP:n kunnassa biometaanin syöttämiseksi GRDF:n jakeluverkkoon. Suunniteltu virtausnopeus on 95 Nm3/h primäärisen PCS-energian tuotannossa 8 622 MWh. (Finnish)
    11 August 2022
    0 references
    Budowa jednostki metanowej SAS METHA 2G w gminie GRAND-CAMP do wtrysku biometanu do sieci dystrybucyjnej GRDF. Planowane natężenie przepływu wynosi 95 Nm3/h dla produkcji pierwotnej energii PCS rzędu 8 622 MWh (Polish)
    11 August 2022
    0 references
    A SAS METHA 2G metanizáló egységének építése a GRAND-CAMP településen biometánnak a GRDF elosztóhálózatba történő befecskendezésére. A tervezett áramlási sebesség 95 Nm3/h a primer PCS-energia előállítására 8 622 MWh nagyságrendű (Hungarian)
    11 August 2022
    0 references
    Výstavba methanizační jednotky SAS METHA 2G v obci GRAND-CAMP pro vstřikování biomethanu do distribuční sítě GRDF. Plánovaný průtok je 95 Nm3/h pro výrobu primární energie PCS řádově 8 622 MWh (Czech)
    11 August 2022
    0 references
    SAS METHA 2G metanizācijas vienības izbūve GRAND-CAMP komūnā biometāna ievadīšanai GRDF sadales tīklā. Plānotais plūsmas ātrums ir 95 Nm3/h primārās PCS enerģijas ražošanai aptuveni 8 622 MWh (Latvian)
    11 August 2022
    0 references
    Tógáil an aonaid methanization de SAS Metha 2G i gcumann GRAND-CAMP chun bithmheatán a instealladh isteach sa ghréasán dáileacháin GRDF. Is é 95 Nm3/h an ráta sreafa atá beartaithe chun príomhfhuinneamh PCS in ord 8 622 MWh a tháirgeadh (Irish)
    11 August 2022
    0 references
    Izgradnja metanizacijske enote družbe SAS METHA 2G v občini GRAND-CAMP za vbrizgavanje biometana v distribucijsko omrežje GRDF. Načrtovana stopnja pretoka je 95 Nm3/h za proizvodnjo primarne energije PCS reda 8 622 MWh. (Slovenian)
    11 August 2022
    0 references
    Изграждане на метанизационната единица на SAS METHA 2G в община GRAND-CAMP за инжектиране на биометан в разпределителната мрежа на GRDF. Планираният дебит е 95 Nm3/h за производството на първична енергия от ППН от порядъка на 8 622 MWh (Bulgarian)
    11 August 2022
    0 references
    Kostruzzjoni tal-unità ta’ metanizzazzjoni ta’ SAS METHA 2G fil-komun ta’ GRAND-CAMP għall-injezzjoni tal-bijometan fin-netwerk ta’ distribuzzjoni tal-GRDF. Ir-rata tal-fluss ippjanata hija ta’ 95 Nm3/h għall-produzzjoni tal-enerġija primarja tal-PCS tal-ordni ta’ 8 622 MWh (Maltese)
    11 August 2022
    0 references
    Construção da unidade de metanização da SAS METHA 2G no município de GRAND-CAMP para a injeção de biometano na rede de distribuição GRDF. O caudal previsto é de 95 Nm3/h para a produção de energia primária PCS da ordem dos 8 622 MWh. (Portuguese)
    11 August 2022
    0 references
    Opførelse af metaniseringsenheden SAS METHA 2G i kommunen GRAND-CAMP til injektion af biomethan i GRDF's distributionsnet. Den planlagte strømningshastighed er 95 Nm3/h for produktion af primær PCS-energi i størrelsesordenen 8 622 MWh (Danish)
    11 August 2022
    0 references
    Construirea unității de metanizare a SAS METHA 2G în comuna GRAND-CAMP pentru injectarea de biometan în rețeaua de distribuție GRDF. Debitul planificat este de 95 Nm3/h pentru producția de energie primară PCS de ordinul 8 622 MWh (Romanian)
    11 August 2022
    0 references
    Konstruktion av enheten för metanisering av SAS METHA 2G i kommunen GRAND-CAMP för injektion av biometan i GRDF:s distributionsnät. Det planerade flödet är 95 Nm3/h för produktion av primär PCS-energi i storleksordningen 8 622 MWh. (Swedish)
    11 August 2022
    0 references
    7 December 2023
    0 references

    Identifiers

    20E02971
    0 references