(10360.14072017.115000131) EFF. ENER. SC.PRIMARI ‘MARTI’ (Q2057034)

From EU Knowledge Graph
Revision as of 03:27, 17 July 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Italy financed by DG Regio
Language Label Description Also known as
English
(10360.14072017.115000131) EFF. ENER. SC.PRIMARI ‘MARTI’
Project in Italy financed by DG Regio

    Statements

    0 references
    93,995.51 Euro
    0 references
    208,878.9 Euro
    0 references
    45.0 percent
    0 references
    30 March 2018
    0 references
    30 March 2020
    0 references
    16 November 2020
    0 references
    COMUNE DI MONTOPOLI IN VAL D'ARNO
    0 references
    0 references

    43°46'11.53"N, 11°15'20.09"E
    0 references
    L?EDIFICIO IN OGGETTO ? UBICATO IN LOCALIT? MARTI, NEL COMUNE DI MONTOPOLI IN VAL D?ARNO,PIAZZA MARTIRI DELL?INTIFADA, ED ? ATTUALMENTE DESTINATO A PI? ATTIVIT? TRA LE QUALI LA PRINCIPALE ? SEDEDEL PLESSO SCOLASTICO DENOMINATO SCUOLA PRIMARIA DI MARTI.GLI INTERVENTI PROPOSTI SONO:? SOSTITUZIONE DEI VECCHI INFISSI CON NUOVI PI? PERFORMANTI;? INSTALLAZIONE DI SOLARE TERMICO;? SOSTITUZIONE DI CALDAIA A BASAMENTO CON CALDAIA A CONDENSAZIONE.? MESSA IN OPERA VALVOLE TERMOSTATICHE E DETENTORI;? SOSTITUZIONE POMPE DI SPINTA CON ELETTROPOMPE AD INVERTER.CON L?ATTUAZIONE DI TALI INTERVENTI SI HA UN ABBATTIMENTO DEL FABBISOGNO DI ENERGIA PRIMARIAGLOBALE NON RINNOVABILE DI 78,812 KWH/M2ANNO. (Italian)
    0 references
    L?? LOCATED IN ITS PREMISES? MARTI, IN THE MUNICIPALITY OF MONTOPOLI IN VAL D? ARNO, PIAZZA MARTYRS OF THE INTIFADA, AND? CURRENTLY USED FOR PI? ACTIVIT? AMONG WHICH ARE THE MAIN ONES? DO YOU PROPOSE A SCHOOL SCHEME KNOWN AS THE PRIMARY SCHOOL ON MARTIS.THE PROPOSED ACTIONS ARE: REPLACEMENT OF OLD FRAMES BY NEW ONES? GOOD PERFORMERS; SOLAR THERMAL INSTALLATION; REPLACEMENT OF A BOILER BOX WITH A CONDENSING BOILER? INSTALLATION OF THERMOSTATIC CONTROL VALVES AND KEEPERS; REPLACEMENT PUMPS WITH ELECTRICAL PUMPS USING ELECTRIC PUMPS TO INVERTER.CON L ARE REPLACED BY THE ABATEMENT OF THE NON-RENEWABLE PRIMARAGLONS ENERGY REQUIREMENT OF 78.812 KWH/M2YEAR. (English)
    0 references

    Identifiers