(10360.14072017.115000060) LOC. CARRAIA (Q2056984)

From EU Knowledge Graph
Revision as of 03:26, 17 July 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Italy financed by DG Regio
Language Label Description Also known as
English
(10360.14072017.115000060) LOC. CARRAIA
Project in Italy financed by DG Regio

    Statements

    0 references
    221,440.91 Euro
    0 references
    738,136.34 Euro
    0 references
    30.0 percent
    0 references
    30 March 2018
    0 references
    30 March 2020
    0 references
    16 November 2020
    0 references
    COMUNE DI CALENZANO
    0 references
    0 references
    0 references

    43°46'11.53"N, 11°15'20.09"E
    0 references
    GLI INTERVENTI PREVISTI, FINALIZZATI AL RISPARMIO ENERGETICO, OLTRE A QUELLI EDILI COMPLEMENTARI ED ALTRI DEL COMPLESSO SCOLASTICO SONO I SEGUENTI:- INSTALLAZIONE NUOVA POMPA DI CALORE PER FUNZIONAMENTO IBRIDO CON CALDAIA A METANO ESISTENTE, MODIFICHE SUGLI IMPIANTI DI DISTRIBUZIONE ED EMISSIONE DELL'IMPIANTO DI RISCALDAMENTO ED ALLACCIAMENTI ELETTRICI;- NUOVO SISTEMA DI TELECONTROLLO/TELEGESTIONE, MONITORAGGIO ENERGETICO E DIMMERIZZAZIONE CORPI ILLUMINANTI;- SOSTITUZIONE INFISSI ESISTENTI, CON DEI NUOVI CON DOPPIO VETRO E TELAIO IN ALLUMINIO A TAGLIO TERMICO PER TUTTO IL FABBRICATO;- REALIZZAZIONE DI CAPPOTTO TERMICO ESTERNO PER TUTTO IL FABBRICATO;- INSTALLAZIONE DI FRANGISOLE SU ALCUNE FINESTRE DEL COMPLESSO PER RIDUZIONE SOLEGGIAMENTO INTERNO;- REALIZZAZIONE DI TETTO VENTILATO PER RIDUZIONE SURRISCALDAMENTO ESTIVO NELLA PORZIONE CHE OSPITA LA SCUOLA MATERNA (Italian)
    0 references
    THE MEASURES ENVISAGED, WITH THE AIM OF SAVING ENERGY, IN ADDITION TO THE ADDITIONAL CONSTRUCTION AND OTHER COMPONENTS OF THE SCHOOL COMPLEX, ARE AS FOLLOWS: — NEW HEAT PUMP INSTALLATION FOR HYBRID OPERATION WITH EXISTING METHANE BOILER, CHANGES TO THE HEATING SYSTEM AND THE INSTALLATION OF THE HEATING SYSTEM AND ELECTRICAL CONNECTIONS; — NEW REMOTE MANAGEMENT, ENERGY MONITORING AND DIME SYSTEM; — REPLACEMENT OF EXISTING FIXTURES, WITH NEW, WITH TWO NEW ONES WITH DOUBLE GLASS AND THERMAL CUT ALUMINIUM FRAME FOR THE ENTIRE BUILDING; — INSTALLATION OF EXTERNAL THERMAL COAT OVER THE ENTIRE BUILDING; — ERECTION OF FRANGISOLE ON SOME WINDOWS OF THE COMPLEX FOR INDOOR REDUCTION; — IMPLEMENTATION OF VENTILATED HEATING CEILING FOR SUMMER HEATING IN THE KINDERGARTEN SECTION (English)
    0 references

    Identifiers