METAPONTO — SIBARI — PAOLA (CROSSROADS ANTONELLO): PRIORITY PHASE (Q2017429)
Jump to navigation
Jump to search
Project Q2017429 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | METAPONTO — SIBARI — PAOLA (CROSSROADS ANTONELLO): PRIORITY PHASE |
Project Q2017429 in Italy |
Statements
71,377,520.0 Euro
0 references
103,208,168.0 Euro
0 references
69.16 percent
0 references
16 January 2006
0 references
31 December 2019
0 references
RETE FERROVIARIA ITALIANA SOCIETA' PER AZIONI - RFI S.P.A.
0 references
L'INTERVENTO Ê LA FASE 2 DEL GRANDE PROGETTO ¿POTENZIAMENTO METAPONTO-SIBARI¿PAOLA (BIVIO S. ANTONELLO): FASE PRIORITARIA¿. E' ARTICOLATO IN 4 LOTTI FUNZIONALI. IL GRANDE PROGETTO DETERMINERà : 1)IL POTENZIAMENTO DELLA LINEA DI CONTATTO (TREBISACCE ¿ SIBARI ¿ CASTIGLIONE COSENTINO) PER UN TOTALE DI 59,8 KM. RISPETTO AI 74,1 KM TOTALI DELL'INTERVENTO DI POTENZIAMENTO, 14,3 KM FANNO RIFERIMENTO A VARIANTI DI TRACCIATO NEI CUI APPALTI SI EFFETTUA ANCHE IL POTENZIAMENTO DELLA TE(SI VEDA PUNTO SEGUENTE); 2) VARIANTI DI TRACCIATO (CASSANO, TARSIA, TORANO E ACRI) PER UN TOTALE DI 14,3 KM; 3) ALLUNGAMENTO A MODULO 740 M DI 2 IMPIANTI (TORANO E AMENDOLARA). (Italian)
0 references
THE INTERVENTION WAS CARRIED OUT IN PHASE 2 OF THE TH STRAND OF THE LARGE-SCALE PROJECT Â TO BOOST METAVAILA-SIZANA — PAOLA (CROSSROADS ANTONELLO): PREPARATORY PHASE Â. IT IS DIVIDED INTO 4 FUNCTIONAL BATCHES. THE MAJOR PROJECT DETERTERMINATION: (1) THE REINFORCEMENT OF THE CONTACT LINE (TREBISACISCE Â BECOMES Â TOWARDS THE CASTIGLIONE — COSENTINO) FOR A TOTAL OF 59.8 KM. IN RELATION TO THE TOTAL 74.1 KM OF THE UPGRADING MEASURE, 14.3 KM REFER TO ROUTE VARIANTS IN WHICH YOU ARE ALSO UPGRADED (SEE NEXT POINT); (2) ALIGNMENT VARIANTS (CASSANO, TARSIA, TORANO AND ACRES) FOR A TOTAL OF 14.3 KM; 3) ELONGATION AT 740 M OF 2 PLANTS (TORANO AND AMENDOLAR). (English)
0.2258516451005414
0 references
L’INTERVENTION EST LA PHASE 2 DU GRAND PROJET DE PUISSANCE METAPONTO-SIBARI’PAOLA (BIVIO S. ANTONELLO): LA PHASE PRIORITAIRE. IL EST DIVISÉ EN 4 LOTS FONCTIONNELS. LE GRAND PROJET DÉTERMINERA: 1)LE RENFORCEMENT DE LA LIGNE DE CONTACT (TREBISACCE’SIBARI’CASTIGLIONE COSENTINO) POUR UN TOTAL DE 59,8 KM. PAR RAPPORT AU TOTAL DE 74,1 KM DE L’OPÉRATION DE MISE À NIVEAU, 14,3 KM CORRESPONDENT À DES VARIANTES DE L’ITINÉRAIRE SUR LEQUEL DES CONTRATS SONT ÉGALEMENT CONCLUS POUR LA MISE À NIVEAU DU PROJET (VOIR POINT CI-DESSOUS); 2) VARIANTES D’ITINÉRAIRES (CASSANO, TARSIA, TORANO ET ACRES) POUR UN TOTAL DE 14,3 KM; 3) ÉLONGATION DU MODULE DE 740 M DE 2 PLANTES (TORANO ET AMENDOLARA). (French)
14 December 2021
0 references
DE INTERVENTIE IS FASE 2 VAN HET GROTE PROJECT DAT METAPONTO-SIBARIÂ’PAOLA (BIVIO S. ANTONELLO) AANDRIJFT: DE PRIORITAIRE FASE. HET IS VERDEELD IN 4 FUNCTIONELE PERCELEN. HET GROTE PROJECT BEPAALT: 1)DE VERSTERKING VAN DE CONTACTLIJN (TREBISACCE Â’SIBARI Â’CASTIGLIONE COSENTINO) VOOR EEN TOTAAL VAN 59,8 KM. IN VERGELIJKING MET HET TOTAAL VAN 74,1 KM VAN DE MODERNISERINGSOPERATIE, HEEFT 14,3 KM BETREKKING OP VARIANTEN VAN DE ROUTE WAARIN OOK CONTRACTEN WORDEN UITGEVOERD OM HET PROJECT TE MODERNISEREN (ZIE PUNT HIERONDER); 2) ROUTEVARIANTEN (CASSANO, TARSIA, TORANO EN ACRES) VOOR EEN TOTAAL VAN 14,3 KM; 3) 740 M MODULE VERLENGING VAN 2 PLANTEN (TORANO EN AMENDOLARA). (Dutch)
22 December 2021
0 references
DIE INTERVENTION IST DIE PHASE 2 DES GROSSEN PROJEKTS "POWERING METAPONTO-SIBARI¿PAOLA (BIVIO S. ANTONELLO): DIE PRIORITÄRPHASE. ES IST IN 4 FUNKTIONELLE LOSE UNTERTEILT. DAS GROSSPROJEKT BESTIMMT: 1)DIE VERSTÄRKUNG DER KONTAKTLINIE (TREBISACCE ¿SIBARI ¿CASTIGLIONE COSENTINO) FÜR INSGESAMT 59,8 KM. IM VERGLEICH ZU DEN INSGESAMT 74,1 KM DES AUSBAUBETRIEBS BEZIEHEN SICH 14,3 KM AUF VARIANTEN DER STRECKE, AUF DER AUCH VERTRÄGE ZUR MODERNISIERUNG DES PROJEKTS DURCHGEFÜHRT WERDEN (SIEHE UNTEN). 2) ROUTENVARIANTEN (CASSANO, TARSIA, TORANO UND ACRES) FÜR INSGESAMT 14,3 KM; 3) 740 M MODUL DEHNUNG VON 2 PFLANZEN (TORANO UND AMENDOLARA). (German)
24 December 2021
0 references
LA INTERVENCIÓN ES LA FASE 2 DEL GRAN PROYECTO QUE IMPULSA METAPONTO-SIBARI?PAOLA (BIVIO S. ANTONELLO): LA FASE PRIORITARIA. SE DIVIDE EN 4 LOTES FUNCIONALES. EL GRAN PROYECTO DETERMINARÁ: 1) EL REFUERZO DE LA LÍNEA DE CONTACTO (TREBISACCE?¿SIBARI?CASTIGLIONE COSENTINO) POR UN TOTAL DE 59,8 KM. EN COMPARACIÓN CON EL TOTAL DE 74,1 KM DE LA OPERACIÓN DE MEJORA, 14,3 KM SE REFIEREN A VARIANTES DE LA RUTA EN LA QUE TAMBIÉN SE LLEVAN A CABO CONTRATOS PARA MEJORAR EL PROYECTO (VÉASE EL PUNTO SIGUIENTE); 2) VARIANTES DE RUTAS (CASSANO, TARSIA, TORANO Y ACRES) PARA UN TOTAL DE 14,3 KM; 3) ELONGACIÓN DEL MÓDULO DE 740 M DE 2 PLANTAS (TORANO Y AMENDOLARA). (Spanish)
24 January 2022
0 references
INTERVENTIONEN BLEV GENNEMFØRT I FASE 2 AF DET STORE PROJEKTS DEL FOR AT STYRKE METAVAILA-SIZANA — PAOLA (KRYDSVEJEN ANTONELLO): FORBEREDENDE FASE. DEN ER OPDELT I 4 FUNKTIONELLE PARTIER. DET STORE PROJEKT DETERTERMINATION: (1) FORSTÆRKNING AF KONTAKTLINJEN (TREBISACISCE BLIVER TIL CASTIGLIONE — COSENTINO) FOR I ALT 59,8 KM. I FORHOLD TIL OPGRADERINGSFORANSTALTNINGENS SAMLEDE 74,1 KM HENVISER 14,3 KM TIL RUTEVARIANTER, HVOR DU OGSÅ OPGRADERES (SE NÆSTE PUNKT). 2) JUSTERINGSVARIANTER (CASSANO, TARSIA, TORANO OG ACRES) FOR I ALT 14,3 KM; 3) FORLÆNGELSE VED 740 M AF 2 PLANTER (TORANO OG AMENDOLAR). (Danish)
4 July 2022
0 references
Η ΠΑΡΈΜΒΑΣΗ ΠΡΑΓΜΑΤΟΠΟΙΉΘΗΚΕ ΣΤΗ ΔΕΎΤΕΡΗ ΦΆΣΗ ΤΟΥ ΈΡΓΟΥ ΜΕΓΆΛΗΣ ΚΛΊΜΑΚΑΣ ΓΙΑ ΤΗΝ ΕΝΊΣΧΥΣΗ ΤΗΣ METAVAILA-SIZANA — PAOLA (ΣΤΑΥΡΟΔΡΌΜΙ ANTONELLO): ΠΡΟΠΑΡΑΣΚΕΥΑΣΤΙΚΉ ΦΆΣΗ. ΧΩΡΊΖΕΤΑΙ ΣΕ 4 ΛΕΙΤΟΥΡΓΙΚΈΣ ΠΑΡΤΊΔΕΣ. ΤΟ ΜΕΓΆΛΟ ΈΡΓΟ DETERTERMINATION: (1) Η ΕΝΊΣΧΥΣΗ ΤΗΣ ΓΡΑΜΜΉΣ ΕΠΑΦΉΣ (TREBISACISCE ΓΊΝΕΤΑΙ ΠΡΟΣ ΤΟ CASTIGLIONE — COSENTINO) ΓΙΑ ΣΎΝΟΛΟ 59,8 ΧΛΜ. ΣΕ ΣΧΈΣΗ ΜΕ ΤΟ ΣΎΝΟΛΟ ΤΩΝ 74,1 KM ΤΟΥ ΜΈΤΡΟΥ ΑΝΑΒΆΘΜΙΣΗΣ, ΤΑ 14,3 KM ΑΝΑΦΈΡΟΝΤΑΙ ΣΕ ΠΑΡΑΛΛΑΓΈΣ ΔΙΑΔΡΟΜΉΣ ΣΤΙΣ ΟΠΟΊΕΣ ΑΝΑΒΑΘΜΊΖΕΣΤΕ ΕΠΊΣΗΣ (ΒΛ. ΕΠΌΜΕΝΟ ΣΗΜΕΊΟ)· (2) ΠΑΡΑΛΛΑΓΈΣ ΕΥΘΥΓΡΆΜΜΙΣΗΣ (CASSANO, TARSIA, TORANO ΚΑΙ ΣΤΡΈΜΜΑΤΑ) ΓΙΑ ΣΥΝΟΛΙΚΆ 14,3 KM· 3) ΕΠΙΜΉΚΥΝΣΗ ΣΕ 740 M ΑΠΌ 2 ΦΥΤΆ (TORANO ΚΑΙ AMENDOLAR). (Greek)
4 July 2022
0 references
INTERVENCIJA JE PROVEDENA U 2. FAZI POTPROGRAMA VELIKOG PROJEKTA ZA POTICANJE METAVAILA-SIZANA – PAOLA (RASKRIŽJE ANTONELLO): PRIPREMNA FAZA. PODIJELJEN JE U 4 FUNKCIONALNE SERIJE. GLAVNI PROJEKT DETERTERMINATION: (1) POJAČANJE KONTAKTNE MREŽE (TREBISACISCE POSTAJE PREMA CASTIGLIONE – COSENTINO) ZA UKUPNO 59,8 KM. U ODNOSU NA UKUPNO 74,1 KM MJERE NADOGRADNJE, 14,3 KM ODNOSI SE NA VARIJANTE RUTE U KOJIMA STE TAKOĐER NADOGRAĐENI (VIDJETI SLJEDEĆU TOČKU); (2) VARIJANTE PORAVNANJA (CASSANO, TARSIA, TORANO I JUTAR) UKUPNO 14,3 KM; 3) IZDUŽENJE NA 740 M 2 BILJKE (TORANO I AMENDOLAR). (Croatian)
4 July 2022
0 references
INTERVENȚIA S-A DESFĂȘURAT ÎN FAZA A 2-A A CELEI DE-A DOUA COMPONENTE A PROIECTULUI LA SCARĂ LARGĂ PENTRU A STIMULA METAVAILA-SIZANA – PAOLA (LA RĂSCRUCE ANTONELLO): FAZA PREGĂTITOARE. ESTE ÎMPĂRȚIT ÎN 4 LOTURI FUNCȚIONALE. PROIECTUL MAJOR DETERTERMINARE: (1) CONSOLIDAREA LINIEI DE CONTACT (TREBISACISCE DEVINE SPRE CASTIGLIONE – COSENTINO) PENTRU UN TOTAL DE 59,8 KM. ÎN CEEA CE PRIVEȘTE TOTALUL DE 74,1 KM DIN MĂSURA DE MODERNIZARE, 14,3 KM SE REFERĂ LA VARIANTELE DE RUTĂ ÎN CARE SUNTEȚI, DE ASEMENEA, MODERNIZAT (A SE VEDEA PUNCTUL URMĂTOR); (2) VARIANTE DE ALINIERE (CASSANO, TARSIA, TORANO ȘI ACRI) PENTRU UN TOTAL DE 14,3 KM; 3) ALUNGIREA LA 740 M A 2 PLANTE (TORANO ȘI AMENDOLAR). (Romanian)
4 July 2022
0 references
INTERVENCIA SA USKUTOČNILA VO FÁZE 2 OBLASTI ROZSIAHLEHO PROJEKTU NA PODPORU METAVAILA-SIZANA – PAOLA (KRIŽOVATKA ANTONELLO): PRÍPRAVNÁ FÁZA. JE ROZDELENÁ NA 4 FUNKČNÉ ŠARŽE. HLAVNÝ PROJEKT DETERMINATION: (1) POSILNENIE TROLEJOVÉHO VEDENIA (TREBISACISCE SA STÁVA SMEROM K CASTIGLIONE – COSENTINO) NA CELKOM 59,8 KM. POKIAĽ IDE O CELKOVÝ POČET 74,1 KM MODERNIZAČNÉHO OPATRENIA, 14,3 KM SA VZŤAHUJE NA VARIANTY TRASY, V KTORÝCH STE TIEŽ MODERNIZOVANÍ (POZRI ĎALŠÍ BOD); (2) VARIANTY NASTAVENIA (CASSANO, TARSIA, TORANO A AKROV) NA CELKOM 14,3 KM; 3) PREDĹŽENIE NA 740 M 2 RASTLINY (TORANO A AMENDOLAR). (Slovak)
4 July 2022
0 references
L-INTERVENT TWETTAQ FIL-FAŻI 2 TAT-TH STRAND TAL-PROĠETT FUQ SKALA KBIRA BIEX TINGĦATA SPINTA LIL METAVAILA-SIZANA — PAOLA (SALIB IT-TOROQ ANTONELLO): FAŻI PREPARATORJA. HUWA MAQSUM F’4 LOTTIJIET FUNZJONALI. ID-DETERTERMINAZZJONI TAL-PROĠETT MAĠĠURI: (1) IT-TISĦIĦ TAL-LINJA TA ‘KUNTATT (TREBISACISCE ISIR LEJN IL CASTIGLIONE — COSENTINO) GĦAL TOTAL TA’ 59.8 KM. FIR-RIGWARD TAT-TOTAL TA’ 74.1 KM TAL-MIŻURA TA’ TITJIB, 14.3 KM JIRREFERU GĦALL-VARJANTI TAR-ROTTA LI FIHOM TKUN UKOLL AĠĠORNAT (ARA L-PUNT LI JMISS); (2) VARJANTI TA’ ALLINJAMENT (CASSANO, TARSIA, TORANO U ACRES) GĦAL TOTAL TA’ 14.3 KM; 3) TITWIL F’740 M TA’ 2 PJANTI (TORANO U AMENDOLAR). (Maltese)
4 July 2022
0 references
A INTERVENÇÃO FOI REALIZADA NA FASE 2 DA TRÂNSITO DO PROJECTO DE GRANDES ESCALAS PARA REFORÇAR A METAVAILA-SIZANA — PAOLA (CROSSROADS ANTONELLO): FASE PREPARATÓRIA Divide-se em 4 sacos funcionais. DETERMINAÇÃO DO GRANDE PROJECTO: (1) O REFORÇO DA LINHA DE CONTACTO (TREBISACISCE) DIZ RESPEITO À CASTIGLIONE — COSENTINO) POR UM TOTAL DE 59,8 KM. EM RELAÇÃO AO TOTAL 74,1 KM DA MEDIDA DE UPGRADING, 14,3 KM REFEREM-SE A VARIANTES DE VIA EM QUE VOCÊ ESTÁ TAMBÉM APLICADO (VER PONTO SEGUINTE); (2) VARIANTES DE ALIMENTAÇÃO (CASSANO, TARSIA, TORANO E ACRES) POR UM TOTAL DE 14,3 KM; 3) ELONGAÇÃO A 740 M DE 2 PLANTAS (TORANO E AMENDOLAR). (Portuguese)
4 July 2022
0 references
TOIMENPIDE TOTEUTETTIIN METAVAILA-SIZANA – PAOLA (CROSSROADS ANTONELLO) -HANKKEEN KOLMANNEN OSA-ALUEEN TOISESSA VAIHEESSA: VALMISTELUVAIHE. SE ON JAETTU NELJÄÄN FUNKTIONAALISEEN ERIIN. SUURHANKE DETERTERMINATION: (1) AJOJOHDON VAHVISTAMINEN (TREBISACISCE TULEE KOHTI CASTIGLIONE – COSENTINO) YHTEENSÄ 59,8 KM. PARANNUSTOIMENPITEEN 74,1 KILOMETRIN KOKONAISMÄÄRÄN OSALTA 14,3 KM VIITTAA REITTIVERSIOIHIN, JOILLA SINUA MYÖS PARANNETAAN (KS. SEURAAVA KOHTA). (2) LINJAUSMUUNNOKSET (CASSANO, TARSIA, TORANO JA EEKKERI) YHTEENSÄ 14,3 KM; 3) KAHDEN LAITOKSEN (TORANO JA AMENDOLAR) VENYMÄ 740 M:SSÄ. (Finnish)
4 July 2022
0 references
INTERWENCJA ZOSTAŁA PRZEPROWADZONA W FAZIE 2 W RAMACH SZEROKO ZAKROJONEGO PROJEKTU MAJĄCEGO NA CELU POBUDZENIE METAVAILA-SIZANA – PAOLA (CROSSROADS ANTONELLO): FAZA PRZYGOTOWAWCZA. JEST PODZIELONY NA 4 PARTIE FUNKCJONALNE. DUŻY PROJEKT DETERTERMINATION: (1) WZMOCNIENIE LINII JEZDNEJ (TREBISACISCE STAJE SIĘ W KIERUNKU CASTIGLIONE – COSENTINO) NA ŁĄCZNIE 59,8 KM. W ODNIESIENIU DO ŁĄCZNIE 74,1 KM ŚRODKA MODERNIZACYJNEGO 14,3 KM ODNOSI SIĘ DO WARIANTÓW TRASY, W KTÓRYCH PAŃSTWO RÓWNIEŻ ZOSTALI ZMODERNIZOWANI (ZOB. NASTĘPNY PUNKT); (2) WARIANTY WYRÓWNANIA (CASSANO, TARSIA, TORANO I AKRÓW) NA ŁĄCZNĄ DŁUGOŚĆ 14,3 KM; 3) WYDŁUŻENIE NA 740 M Z 2 ROŚLIN (TORANO I AMENDOLAR). (Polish)
4 July 2022
0 references
POSEG JE BIL IZVEDEN V 2. FAZI OBSEŽNEGA PROJEKTA ZA POVEČANJE METAVAILA-SIZANA – PAOLA (KRIŽIŠČE ANTONELLO): PRIPRAVLJALNA FAZA. RAZDELJEN JE NA 4 FUNKCIONALNE SERIJE. VELIKI PROJEKT DETERMINATION: (1) OKREPITEV KONTAKTNEGA VODA (TREBISACISCE POSTANE PROTI CASTIGLIONE – COSENTINO) ZA SKUPNO 59,8 KM. V ZVEZI S SKUPNO 74,1 KM NADGRADENJ SE 14,3 KM NANAŠA NA RAZLIČICE POTI, V KATERIH STE PRAV TAKO NADGRAJENI (GLEJ NASLEDNJO TOČKO); (2) RAZLIČICE PORAVNAVE (CASSANO, TARSIA, TORANO IN HEKTARJI) ZA SKUPNO 14,3 KM; 3) RAZTEZEK NA 740 M 2 RASTLIN (TORANO IN AMENDOLAR). (Slovenian)
4 July 2022
0 references
ZÁSAH BYL PROVEDEN VE FÁZI 2 ČÁSTI ROZSÁHLÉHO PROJEKTU NA PODPORU METAVAILA-SIZANA – PAOLA (KŘÍŽNICE ANTONELLO): PŘÍPRAVNÁ FÁZE. JE ROZDĚLENA DO 4 FUNKČNÍCH ŠARŽÍ. VELKÝ PROJEKT DETERTERMINATION: (1) POSÍLENÍ TROLEJOVÉHO VEDENÍ (TREBISACISCE SE STÁVÁ SMĚREM K CASTIGLIONE – COSENTINO) CELKEM 59,8 KM. VE VZTAHU K CELKEM 74,1 KM OPATŘENÍ MODERNIZACE ODKAZUJE 14,3 KM NA VARIANTY TRASY, VE KTERÝCH JSTE TAKÉ MODERNIZOVÁNI (VIZ DALŠÍ BOD); (2) ZAROVNÁNÍ VARIANTY (CASSANO, TARSIA, TORANO A AKRY) CELKEM 14,3 KM; 3) PRODLOUŽENÍ NA 740 M ZE 2 ROSTLIN (TORANO A AMENDOLAR). (Czech)
4 July 2022
0 references
INTERVENCIJA BUVO ATLIKTA 2-AJAME DIDELĖS APIMTIES PROJEKTO ETAPE METAVAILA-SIZANA – PAOLA (CROSSROADS ANTONELLO): PARENGIAMASIS ETAPAS. JIS SUSKIRSTYTAS Į 4 FUNKCINES PARTIJAS. DIDELĖS APIMTIES PROJEKTAS DETERTERMINATION: (1) KONTAKTINĖS LINIJOS SUSTIPRINIMAS (TREBISACISCE TAMPA LINK CASTIGLIONE – COSENTINO) IŠ VISO 59,8 KM. KALBANT APIE BENDRĄ 74,1 KM MODERNIZAVIMO PRIEMONĖS DYDĮ, 14,3 KM REIŠKIA MARŠRUTO, KURIAME TAIP PAT ESATE MODERNIZUOTAS, VARIANTUS (ŽR. KITĄ PUNKTĄ); (2) DERINIMO VARIANTAI (CASSANO, TARSIA, TORANO IR AKRAI) IŠ VISO 14,3 KM; 3) PAILGĖJIMAS 740 M IŠ 2 AUGALŲ (TORANO IR AMENDOLAR). (Lithuanian)
4 July 2022
0 references
INTERVENCE TIKA VEIKTA LIELA MĒROGA PROJEKTA METAVAILA-SIZANA-SIZANA — PAOLA (TRANSROADS ANTONELLO) 2. POSMĀ: SAGATAVOŠANAS POSMS. TAS IR SADALĪTS 4 FUNKCIONĀLAJĀS PARTIJĀS. LIELAIS PROJEKTS DETERTERMINATION: (1) KONTAKTLĪNIJAS PASTIPRINĀŠANA (TREBISACISCE KĻŪST PAR CASTIGLIONE — COSENTINO) KOPĀ 59,8 KM. ATTIECĪBĀ UZ MODERNIZĀCIJAS PASĀKUMA KOPĒJO 74,1 KM ATTĀLUMU 14,3 KM ATTIECAS UZ MARŠRUTA VARIANTIEM, KUROS JŪS ARĪ MODERNIZĒJAT (SK. NĀKAMO PUNKTU); (2) PIELĪDZINĀŠANAS VARIANTI (CASSANO, TARSIA, TORANO UN AKRI) KOPĀ 14,3 KM; 3) PAGARINĀJUMS PIE 740 M 2 AUGIEM (TORANO UN AMENDOLAR). (Latvian)
4 July 2022
0 references
ИНТЕРВЕНЦИЯТА Е ОСЪЩЕСТВЕНА ВЪВ ФАЗА 2 ОТ НАПРАВЛЕНИЕТО НА МАЩАБНИЯ ПРОЕКТ ЗА НАСЪРЧАВАНЕ НА METAVAILA-SIZANA — PAOLA (КРЪСТОПЪТИЩА ANTONELLO): ПОДГОТВИТЕЛНА ФАЗА. ТЯ Е РАЗДЕЛЕНА НА 4 ФУНКЦИОНАЛНИ ПАРТИДИ. ГОЛЕМИЯТ ПРОЕКТ DETERTERMINATION: (1) ПОДСИЛВАНЕТО НА КОНТАКТНАТА ЛИНИЯ (TREBISACISCE СТАВА КЪМ КАСТИГЛИОНЕ — КОЗЕНТИНО) ЗА ОБЩО 59,8 КМ. ПО ОТНОШЕНИЕ НА ОБЩО 74,1 KM ОТ МЯРКАТА ЗА МОДЕРНИЗИРАНЕ 14,3 KM СЕ ОТНАСЯТ ДО ВАРИАНТИ НА МАРШРУТИ, В КОИТО СЪЩО СТЕ МОДЕРНИЗИРАНИ (ВЖ. СЛЕДВАЩАТА ТОЧКА); (2) ВАРИАНТИ НА ПОДРАВНЯВАНЕ (КАСАНО, ТАРСИЯ, ТОРАНО И АКРА) ЗА ОБЩО 14.3 КМ; 3) УДЪЛЖЕНИЕ НА 740 М ОТ 2 РАСТЕНИЯ (TORANO И AMENDOLAR). (Bulgarian)
4 July 2022
0 references
A BEAVATKOZÁST A METAVAILA-SIZANA – PAOLA (AZ ANTONELLO KERESZTÚT) FELLENDÍTÉSÉRE IRÁNYULÓ NAGYSZABÁSÚ PROJEKT MÁSODIK SZAKASZÁNAK 2. SZAKASZÁBAN HAJTOTTÁK VÉGRE: ELŐKÉSZÍTŐ SZAKASZ. EZ 4 FUNKCIONÁLIS TÉTELRE OSZLIK. A DETERTERMINATION NAGYPROJEKT: (1) A VEZETÉK MEGERŐSÍTÉSE (TREBISACISCE) A CASTIGLIONE – COSENTINO FELÉ VÁLIK, ÖSSZESEN 59,8 KM-RE. A KORSZERŰSÍTÉSI INTÉZKEDÉS TELJES 74,1 KM-E TEKINTETÉBEN A 14,3 KM OLYAN ÚTVONALVÁLTOZATOKRA VONATKOZIK, AMELYEKBEN ÖN IS KORSZERŰSÍTÉSRE KERÜL (LÁSD A KÖVETKEZŐ PONTOT); (2) AZ ÖSSZEHANGOLÁSI VÁLTOZATOK (CASSANO, TARSIA, TORANO ÉS A HOLD) ÖSSZESEN 14,3 KM-RE; 3) NYÚLÁS 740 M 2 NÖVÉNY (TORANO ÉS AMENDOLAR). (Hungarian)
4 July 2022
0 references
RINNEADH AN IDIRGHABHÁIL I GCÉIM 2 DEN TSNÁITHE DEN TIONSCADAL MÓRSCÁLA CHUN METAVAILA-SIZANA — PAOLA (TRASBHÓTHAR ANTONELLO) A THREISIÚ: AN CHÉIM ULLMHÚCHÁIN. TÁ SÉ ROINNTE INA 4 BHAISC FEIDHME. AN MÓRTHIONSCADAL DETERMINATION: (1) TREISIÚ NA LÍNE TEAGMHÁLA (TREBISACISCE THIOCFAIDH CHUN BHEITH I DTREO AN CASTIGLIONE — COSENTINO) AR FEADH IOMLÁN 59.8 KM. MAIDIR LEIS AN MÉID IOMLÁN 74.1 KM DEN BHEART UASGHRÁDAITHE, TAGRAÍONN 14.3 KM D’ATHRAITHEACHA BEALAÍ INA NDÉANTAR UASGHRÁDÚ ORT FREISIN (FÉACH AN CHÉAD PHOINTE EILE); (2) MALAIRTÍ AILÍNITHE (CASSANO, TARSIA, TORANO AGUS ACRA) LE HAGHAIDH IOMLÁN 14.3 KM; 3) FADÚ AG 740 M DE PHLANDAÍ 2 (TORANO AGUS AMENDOLAR). (Irish)
4 July 2022
0 references
INSATSEN GENOMFÖRDES I FAS 2 AV DET STORSKALIGA PROJEKTET FÖR ATT STÄRKA METAVAILA-SIZANA – PAOLA (VÄGKORSNING ANTONELLO): FÖRBEREDANDE FAS. DEN ÄR UPPDELAD I 4 FUNKTIONELLA SATSER. DET STÖRRE PROJEKTET DETERTERMINATION: (1) FÖRSTÄRKNINGEN AV KONTAKTLEDNINGEN (TREBISACISCE BLIR MOT CASTIGLIONE – COSENTINO) FÖR TOTALT 59,8 KM. I FÖRHÅLLANDE TILL DET TOTALA ANTALET 74,1 KM FÖR UPPGRADERINGSÅTGÄRDEN AVSER 14,3 KM RUTTVARIANTER DÄR DU OCKSÅ UPPGRADERAS (SE NÄSTA PUNKT). (2) ANPASSNINGSVARIANTER (CASSANO, TARSIA, TORANO OCH TUNNLAND) FÖR TOTALT 14,3 KM. 3) TÖJNING VID 740 M AV 2 PLANTOR (TORANO OCH AMENDOLAR). (Swedish)
4 July 2022
0 references
SEKKUMINE VIIDI LÄBI METAVAILA-SIZANA – PAOLA (RISTTEED ANTONELLO) ULATUSLIKU PROJEKTI 2. ETAPIS: ETTEVALMISTUSETAPP. SEE ON JAGATUD NELJAKS FUNKTSIONAALSEKS PARTIIKS. SUURPROJEKT DETERTERMINATION: (1) KONTAKTLIINI TUGEVDAMINE (TREBISACISCE MUUTUB CASTIGLIONE – COSENTINO SUUNAS) KOKKU 59,8 KM. ÜMBEREHITAMISMEETME 74,1 KM KOGUARVU PUHUL VIITAB 14,3 KM MARSRUUDIVARIANTIDELE, KUS TEID SAMUTI TÄIUSTATAKSE (VT JÄRGMINE PUNKT); (2) JOONDAMISVARIANDID (CASSANO, TARSIA, TORANO JA AAKRID) KOKKU 14,3 KM; 3) PIKENEMINE 740 M 2 TEHAST (TORANO JA AMENDOLAR). (Estonian)
4 July 2022
0 references
ACRI
0 references
AMENDOLARA
0 references
CASSANO ALL'IONIO
0 references
CASTIGLIONE COSENTINO
0 references
MONGRASSANO
0 references
MONTALTO UFFUGO
0 references
ROCCA IMPERIALE
0 references
ROSE
0 references
SAN MARCO ARGENTANO
0 references
SPEZZANO ALBANESE
0 references
TARSIA
0 references
TORANO CASTELLO
0 references
TREBISACCE
0 references
8 April 2023
0 references
Identifiers
J84F05000030001
0 references
4288
0 references
2017IT16RFMP002
0 references