(A19_075_2015_0750045_1050) EFFFICENTICTORY (Q2065907)

From EU Knowledge Graph
Revision as of 19:08, 9 October 2024 by DG Regio (talk | contribs) (‎Set a claim value: summary (P836): O OBJETIVO DO PROGRAMA DE INVESTIMENTO É AUMENTAR A EFICIÊNCIA ENERGÉTICA DO PROCESSO DE PRODUÇÃO ATRAVÉS DA AQUISIÇÃO DE DOIS NOVOS SISTEMAS ESPRINKLER: PLANTA AUTOMÁTICA DE PIGMENTAÇÃO COM DOIS BOOTES MOD. TU ROT (em inglês). 3000/12 + 12 PISTÓIS (1,21), QUE VÃO SUBSTITUIR AS INSTALAÇÕES FITOFARMACÊUTICAS QUE ATUALMENTE OPERAM NO HALL DA TANNERY VICTORIA S.R.L., QUE DATARAM AO FINAL DOS Anos 80? INÍCIO DE 90 E DO PONTO DE VISTA MECÂNICO (MANUTENÇÃ...)
Jump to navigation Jump to search
Project Q2065907 in Italy
Language Label Description Also known as
English
(A19_075_2015_0750045_1050) EFFFICENTICTORY
Project Q2065907 in Italy

    Statements

    0 references
    94,215.0 Euro
    0 references
    188,429.99 Euro
    0 references
    50.0 percent
    0 references
    15 September 2015
    0 references
    29 December 2017
    0 references
    13 March 2017
    0 references
    VICTORIA - S.R.L.
    0 references
    0 references
    0 references

    43°27'31.14"N, 11°8'20.11"E
    0 references
    IL PROGRAMMA DI INVESTIMENTO HA COME OBBIETTIVO L'EFFICIENTAMENTO ENERGETICO DEL PROCESSO PRODUTTIVO ATTRAVERSO L'ACQUISTO DI DUE NUOVI IMPIANTI DI RIFINIZIONE A SPRUZZO: IMPIANTI DI PIGMENTAZIONE AUTOMATICO ROTATIVO A DUE CABINE MOD. TU ROT. 3000/12 + 12 PISTOLE (1,21), CHE ANDRANNO A SOSTITUIRE LE INSTALLAZIONI IMPIANTISTICHE ATTUALMENTE OPERANTI NEL REPARTO DI RIFINIZIONE DELLA CONCERIA VICTORIA S.R.L. CHE RISALGONO ALLA FINE DEGLI ANNI 80 ? INIZIO ANNO 90 E DA UN PUNTO DI VISTA MECCANICO (CONSERVAZIONE DELLA STRUTTURA PORTANTE), ENERGETICO (RELATIVAMENTE AL TIPO DI COIBENTAZIONE) ED ELETTRICO ? ELETTRONICO DI POTENZA E DI CONTROLLO, RISULTANO MACCHINARI ESTREMAMENTE OBSOLETI. COSTO DELL'INVESTIMENTO:433.200 EURO + IVA. GRAZIE ALL'INTERVENTO ? PREVISTO UN RISPARMIO ENERGETICO DEL 31%. AI NUOVI IMPIANTI VERRANNO APPLICATI UNA SERIE DI ACCORGIMENTI, RIASSUMIBILI IN: - INTERVENTI SUGLI ASSORBIMENTI DI ENERGIA ELETTRICA ATTRAVERSO L'IMPIEGO DI MOTORI ELETTRICI IN CLASSE ENERGETICA IE3 E (Italian)
    0 references
    THE OBJECTIVE OF THE INVESTMENT PROGRAMME IS TO INCREASE THE ENERGY EFFICIENCY OF THE PRODUCTION PROCESS THROUGH THE PURCHASE OF TWO NEW SPRINKLER SYSTEMS: AUTOMATIC PIGMENTATION PLANT WITH TWO BOOTHS MOD. TU ROT. 3000/12 + 12 PISTOLS (1,21), WHICH WILL REPLACE THE PLANT INSTALLATIONS CURRENTLY OPERATING IN THE HALL OF THE TANNERY VICTORIA S.R.L., WHICH DATE BACK TO THE END OF THE 80S? START OF 90 AND FROM A MECHANICAL POINT OF VIEW (MAINTENANCE OF THE CARRIER STRUCTURE), ENERGY (WITH REGARD TO THE TYPE OF INSULATION) AND ELECTRIC? ELECTRONIC POWER AND CONTROL ARE HIGHLY OBSOLETE MACHINERY. INVESTMENT COST: EUR 433.200 + VAT. THANKS TO THE INTERVENTION? PROJECTED ENERGY SAVINGS OF 31 %. A SERIES OF MEASURES WILL BE APPLIED TO THE NEW PLANTS, WHICH CAN BE SUMMARISED AS FOLLOWS: — INTERVENTIONS IN ELECTRICITY ABSORPTIONS THROUGH THE USE OF ELECTRIC MOTORS IN ENERGY CLASS IE3 AND (English)
    0.4068375037964075
    0 references
    LE PROGRAMME D’INVESTISSEMENT VISE À L’EFFICACITÉ ÉNERGÉTIQUE DU PROCESSUS DE PRODUCTION PAR L’ACHAT DE DEUX NOUVELLES USINES DE FINITION PAR PULVÉRISATION: SYSTÈMES DE PIGMENTATION ROTATIVE AUTOMATIQUES AVEC DEUX CABINES MOD. TU POURRITS. 3000/12 + 12 PISTOLETS (1,21), QUI REMPLACERONT LES INSTALLATIONS DE L’USINE ACTUELLEMENT EN ACTIVITÉ DANS LE DÉPARTEMENT DE FINITION DE LA TANNERIE VICTORIA S.R.L. DATANT DE LA FIN DES ANNÉES 1980? DÉBUT DE L’ANNÉE 90 ET D’UN POINT DE VUE MÉCANIQUE (PRÉSERVATION DE LA STRUCTURE PORTEUSE), ÉNERGIE (PAR RAPPORT AU TYPE D’ISOLATION) ET ÉLECTRIQUE? PUISSANCE ET CONTRÔLE ÉLECTRONIQUES, SONT DES MACHINES EXTRÊMEMENT OBSOLÈTES. COÛT DU INVESTIMENTO:EUR 433.200 + TVA. GRÂCE À L’OPÉRATION? LES ÉCONOMIES D’ÉNERGIE ATTENDUES SONT DE 31 %. UNE SÉRIE DE MESURES SERONT APPLIQUÉES AUX NOUVELLES INSTALLATIONS, RÉSUMÉES DANS: — INTERVENTIONS SUR L’ABSORPTION DE L’ÉLECTRICITÉ PAR L’UTILISATION DE MOTEURS ÉLECTRIQUES DANS LA CLASSE D’ÉNERGIE IE3 ET (French)
    16 December 2021
    0 references
    HET INVESTERINGSPROGRAMMA IS GERICHT OP DE ENERGIE-EFFICIËNTIE VAN HET PRODUCTIEPROCES DOOR DE AANKOOP VAN TWEE NIEUWE SPUITAFWERKINGSINSTALLATIES: AUTOMATISCHE ROTERENDE PIGMENTATIESYSTEMEN MET TWEE CABINES MOD. ROT JIJ MAAR OP. 3000/12 + 12 PISTOLEN (1,21), DIE DE FABRIEKSINSTALLATIES ZULLEN VERVANGEN DIE MOMENTEEL ACTIEF ZIJN IN DE AFWERKINGSAFDELING VAN DE LEERLOOIERIJ VICTORIA S.R.L. UIT DE LATE JAREN 1980? BEGIN VAN HET JAAR 90 EN VANUIT MECHANISCH OOGPUNT (BEHOUD VAN DE DRAGENDE STRUCTUUR), ENERGIE (TEN OPZICHTE VAN HET TYPE ISOLATIE) EN ELEKTRISCH? ELEKTRONISCHE MACHT EN CONTROLE, ZIJN UITERST VEROUDERDE MACHINES. KOSTEN VAN INVESTIMENTO:EUR 433.200 + BTW. DANKZIJ DE OPERATIE? VERWACHTE ENERGIEBESPARING VAN 31 %. OP DE NIEUWE INSTALLATIES ZAL EEN REEKS MAATREGELEN WORDEN TOEGEPAST, DIE WORDEN SAMENGEVAT IN: — INTERVENTIES OP HET GEBIED VAN DE ABSORPTIE VAN ELEKTRICITEIT DOOR HET GEBRUIK VAN ELEKTROMOTOREN IN ENERGIEKLASSE IE3 EN (Dutch)
    23 December 2021
    0 references
    DAS INVESTITIONSPROGRAMM ZIELT AUF DIE ENERGIEEFFIZIENZ DES PRODUKTIONSPROZESSES DURCH DEN KAUF VON ZWEI NEUEN SPRITZVEREDELUNGSANLAGEN AB: AUTOMATISCHE DREHPIGMENTIERUNGSSYSTEME MIT ZWEI KABINEN MOD. DU VERROTTEST. 3000/12 + 12 PISTOLEN (1,21), DIE DIE ANLAGEN ERSETZEN, DIE DERZEIT IN DER ENDABTEILUNG DER GERBEREI VICTORIA S.R.L. AUS DEN SPÄTEN 1980ER JAHREN BETRIEBEN WERDEN? ANFANG DES JAHRES 90 UND AUS MECHANISCHER SICHT (ERHALTUNG DER TRAGENDEN STRUKTUR), ENERGIE (BEZOGEN AUF DIE ART DER ISOLIERUNG) UND ELEKTRISCH? ELEKTRONISCHE LEISTUNG UND STEUERUNG, SIND EXTREM VERALTETE MASCHINEN. KOSTEN DER INVESTIMENTO:EUR 433.200 + MWST. DANK DER OPERATION? ERWARTETE ENERGIEEINSPARUNGEN VON 31 %. AUF DIE NEUEN ANLAGEN WIRD EINE REIHE VON MASSNAHMEN ANGEWANDT, ZUSAMMENGEFASST IN: — INTERVENTIONEN ZUR ABSORPTION VON STROM DURCH DEN EINSATZ VON ELEKTROMOTOREN IN DER ENERGIEKLASSE IE3 UND (German)
    24 December 2021
    0 references
    EL PROGRAMA DE INVERSIÓN TIENE COMO OBJETIVO LA EFICIENCIA ENERGÉTICA DEL PROCESO DE PRODUCCIÓN A TRAVÉS DE LA COMPRA DE DOS NUEVAS PLANTAS DE ACABADO DE PULVERIZACIÓN: SISTEMAS AUTOMÁTICOS DE PIGMENTACIÓN ROTATIVA CON DOS CABINAS MOD. TE PUDRES. 3000/12 + 12 PISTOLAS (1,21), QUE SUSTITUIRÁN A LAS INSTALACIONES DE LA PLANTA ACTUALMENTE EN FUNCIONAMIENTO EN EL DEPARTAMENTO DE ACABADO DE LA CURTIEMBRE VICTORIA S.R.L. QUE DATA DE FINALES DE LA DÉCADA DE 1980? PRINCIPIOS DEL AÑO 90 Y DESDE UN PUNTO DE VISTA MECÁNICO (CONSERVACIÓN DE LA ESTRUCTURA DE CARGA), ENERGÍA (RELATIVA AL TIPO DE AISLAMIENTO) Y ELÉCTRICA? LA POTENCIA Y EL CONTROL ELECTRÓNICOS, SON MÁQUINAS EXTREMADAMENTE OBSOLETAS. COSTE DEL INVESTIMENTO:EUR 433.200 + IVA. ¿GRACIAS A LA CIRUGÍA? AHORRO ENERGÉTICO ESPERADO DEL 31 %. SE APLICARÁ UNA SERIE DE MEDIDAS A LAS NUEVAS PLANTAS, RESUMIDAS EN: — INTERVENCIONES SOBRE LA ABSORCIÓN DE ELECTRICIDAD MEDIANTE EL USO DE MOTORES ELÉCTRICOS EN LA CLASE ENERGÉTICA IE3 Y (Spanish)
    25 January 2022
    0 references
    FORMÅLET MED INVESTERINGSPROGRAMMET ER AT ØGE ENERGIEFFEKTIVITETEN I PRODUKTIONSPROCESSEN GENNEM INDKØB AF TO NYE SPRINKLERSYSTEMER: AUTOMATISK PIGMENTERINGSANLÆG MED TO KABINER MOD. TU RÅDNER. 3000/12 + 12 PISTOLER (1,21), SOM SKAL ERSTATTE DE ANLÆG, DER I ØJEBLIKKET ER I DRIFT I HALLEN PÅ GARVERI VICTORIA S.R.L., SOM GÅR TILBAGE TIL SLUTNINGEN AF 80S? START AF 90 OG FRA ET MEKANISK SYNSPUNKT (VEDLIGEHOLDELSE AF BÆRESTRUKTUREN), ENERGI (MED HENSYN TIL TYPEN AF ISOLERING) OG ELEKTRISK? ELEKTRONISK KRAFT OG KONTROL ER MEGET FORÆLDEDE MASKINER. INVESTERINGSOMKOSTNINGER: 433,200 EUR + MOMS. TAKKET VÆRE INTERVENTIONEN? FORVENTEDE ENERGIBESPARELSER PÅ 31 %. DER VIL BLIVE ANVENDT EN RÆKKE FORANSTALTNINGER PÅ DE NYE ANLÆG, SOM KAN SAMMENFATTES SÅLEDES: — INDGREB I ELABSORPTIONER GENNEM ANVENDELSE AF ELMOTORER I ENERGIKLASSE IE3 OG (Danish)
    5 July 2022
    0 references
    ΣΤΌΧΟΣ ΤΟΥ ΕΠΕΝΔΥΤΙΚΟΎ ΠΡΟΓΡΆΜΜΑΤΟΣ ΕΊΝΑΙ Η ΑΎΞΗΣΗ ΤΗΣ ΕΝΕΡΓΕΙΑΚΉΣ ΑΠΌΔΟΣΗΣ ΤΗΣ ΠΑΡΑΓΩΓΙΚΉΣ ΔΙΑΔΙΚΑΣΊΑΣ ΜΈΣΩ ΤΗΣ ΑΓΟΡΆΣ ΔΎΟ ΝΈΩΝ ΣΥΣΤΗΜΆΤΩΝ ΚΑΤΑΙΩΝΙΣΤΉΡΩΝ: ΑΥΤΌΜΑΤΗ ΜΟΝΆΔΑ ΧΡΏΣΗΣ ΜΕ ΔΎΟ ΘΑΛΆΜΟΥΣ MOD. TU ΣΑΠΊΖΕΙ. 3000/12 + 12 ΠΙΣΤΌΛΙΑ (1,21), ΤΑ ΟΠΟΊΑ ΘΑ ΑΝΤΙΚΑΤΑΣΤΉΣΟΥΝ ΤΙΣ ΕΓΚΑΤΑΣΤΆΣΕΙΣ ΠΟΥ ΛΕΙΤΟΥΡΓΟΎΝ ΣΉΜΕΡΑ ΣΤΗΝ ΑΊΘΟΥΣΑ ΤΟΥ ΒΥΡΣΟΔΕΨΕΊΟΥ VICTORIA S.R.L., Η ΟΠΟΊΑ ΧΡΟΝΟΛΟΓΕΊΤΑΙ ΑΠΌ ΤΟ ΤΈΛΟΣ ΤΗΣ ΔΕΚΑΕΤΊΑΣ ΤΟΥ 80; ΈΝΑΡΞΗ 90 ΚΑΙ ΑΠΌ ΜΗΧΑΝΙΚΉ ΆΠΟΨΗ (ΣΥΝΤΉΡΗΣΗ ΤΗΣ ΦΈΡΟΥΣΑΣ ΔΟΜΉΣ), ΕΝΈΡΓΕΙΑ (ΣΕ ΣΧΈΣΗ ΜΕ ΤΟΝ ΤΎΠΟ ΤΗΣ ΜΌΝΩΣΗΣ) ΚΑΙ ΗΛΕΚΤΡΙΚΉ; Η ΗΛΕΚΤΡΟΝΙΚΉ ΙΣΧΎΣ ΚΑΙ Ο ΈΛΕΓΧΟΣ ΕΊΝΑΙ ΕΞΑΙΡΕΤΙΚΆ ΑΠΑΡΧΑΙΩΜΈΝΑ ΜΗΧΑΝΉΜΑΤΑ. ΕΠΕΝΔΥΤΙΚΌ ΚΌΣΤΟΣ: 433,200 EUR + ΦΠΑ. ΧΆΡΗ ΣΤΗΝ ΠΑΡΈΜΒΑΣΗ; ΠΡΟΒΛΕΠΌΜΕΝΗ ΕΞΟΙΚΟΝΌΜΗΣΗ ΕΝΈΡΓΕΙΑΣ 31 %. ΣΤΙΣ ΝΈΕΣ ΕΓΚΑΤΑΣΤΆΣΕΙΣ ΘΑ ΕΦΑΡΜΟΣΤΕΊ ΜΙΑ ΣΕΙΡΆ ΜΈΤΡΩΝ, ΤΑ ΟΠΟΊΑ ΜΠΟΡΟΎΝ ΝΑ ΣΥΝΟΨΙΣΤΟΎΝ ΩΣ ΕΞΉΣ: — ΠΑΡΕΜΒΆΣΕΙΣ ΣΤΙΣ ΑΠΟΡΡΟΦΉΣΕΙΣ ΗΛΕΚΤΡΙΚΉΣ ΕΝΈΡΓΕΙΑΣ ΜΈΣΩ ΤΗΣ ΧΡΉΣΗΣ ΗΛΕΚΤΡΙΚΏΝ ΚΙΝΗΤΉΡΩΝ ΣΤΗΝ ΕΝΕΡΓΕΙΑΚΉ ΚΛΆΣΗ IE3 ΚΑΙ (Greek)
    5 July 2022
    0 references
    CILJ JE INVESTICIJSKOG PROGRAMA POVEĆATI ENERGETSKU UČINKOVITOST PROIZVODNOG PROCESA KUPNJOM DVAJU NOVIH SUSTAVA RASPRŠIVANJA: AUTOMATSKA PIGMENTACIJA BILJKA S DVIJE KABINE MOD. TU TRULEŽI. 3000/12 + 12 PIŠTOLJA (1,21), KOJI ĆE ZAMIJENITI POSTROJENJA TRENUTNO DJELUJU U DVORANI TANNERY VICTORIA S.R.L., KOJI DATIRA DO KRAJA 80S? POČETAK 90 I S MEHANIČKOG GLEDIŠTA (ODRŽAVANJE KONSTRUKCIJE NOSAČA), ENERGIJA (S OBZIROM NA VRSTU IZOLACIJE) I ELEKTRIČNA? ELEKTRONIČKA SNAGA I KONTROLA SU VRLO ZASTARJELI STROJEVI. TROŠKOVI ULAGANJA: 433,200 EUR + PDV. ZAHVALJUJUĆI INTERVENCIJI? PREDVIĐENA UŠTEDA ENERGIJE OD 31 %. NA NOVA POSTROJENJA PRIMJENJIVAT ĆE SE NIZ MJERA, KOJE SE MOGU SAŽETI KAKO SLIJEDI: — INTERVENCIJE U APSORPCIJU ELEKTRIČNE ENERGIJE UPOTREBOM ELEKTRIČNIH MOTORA U ENERGETSKOM RAZREDU IE3 I (Croatian)
    5 July 2022
    0 references
    OBIECTIVUL PROGRAMULUI DE INVESTIȚII ESTE DE A CREȘTE EFICIENȚA ENERGETICĂ A PROCESULUI DE PRODUCȚIE PRIN ACHIZIȚIONAREA A DOUĂ NOI SISTEME DE ASPERSOARE: INSTALAȚIE DE PIGMENTARE AUTOMATĂ CU DOUĂ CABINE MOD. TU PUTREZESC. 3000/12 + 12 PISTOALE (1,21), CARE VOR ÎNLOCUI INSTALAȚIILE CENTRALE CARE FUNCȚIONEAZĂ ÎN PREZENT ÎN SALA TĂBĂCĂRIEI VICTORIA S.R.L., CARE DATEAZĂ DE LA SFÂRȘITUL ANILOR 80S? PORNIREA DE LA 90 ȘI DIN PUNCT DE VEDERE MECANIC (ÎNTREȚINEREA STRUCTURII SUPORTULUI), ENERGIA (ÎN CEEA CE PRIVEȘTE TIPUL DE IZOLAȚIE) ȘI ENERGIA ELECTRICĂ? PUTEREA ȘI CONTROLUL ELECTRONIC SUNT MAȘINI FOARTE ÎNVECHITE. COSTUL INVESTIȚIEI: 433,200 EUR + TVA. MULȚUMITĂ INTERVENȚIEI? ECONOMII DE ENERGIE ESTIMATE LA 31 %. O SERIE DE MĂSURI VOR FI APLICATE NOILOR INSTALAȚII, CARE POT FI REZUMATE DUPĂ CUM URMEAZĂ: INTERVENȚII ÎN ABSORBȚIILE DE ENERGIE ELECTRICĂ PRIN UTILIZAREA MOTOARELOR ELECTRICE ÎN CLASA ENERGETICĂ IE3 ȘI (Romanian)
    5 July 2022
    0 references
    CIEĽOM INVESTIČNÉHO PROGRAMU JE ZVÝŠIŤ ENERGETICKÚ ÚČINNOSŤ VÝROBNÉHO PROCESU PROSTREDNÍCTVOM NÁKUPU DVOCH NOVÝCH SAMOČINNÝCH HASIACICH SYSTÉMOV: AUTOMATICKÁ PIGMENTAČNÁ RASTLINA S DVOMA KABÍNAMI MOD. TU HNILOBY. 3000/12 + 12 PIŠTOLÍ (1,21), KTORÉ NAHRADIA ZARIADENIA V SÚČASNOSTI PREVÁDZKOVANÉ V HALE GARBIARSTVA VICTORIA S.R.L., KTORÉ SA DATUJÚ DO KONCA 80S? ZAČIATOK 90 A Z MECHANICKÉHO HĽADISKA (ÚDRŽBA NOSNEJ KONŠTRUKCIE), ENERGIE (Z HĽADISKA TYPU IZOLÁCIE) A ELEKTRICKEJ? ELEKTRONICKÝ VÝKON A RIADENIE SÚ VEĽMI ZASTARANÉ STROJE. INVESTIČNÉ NÁKLADY: 433,200 EUR + DPH. VĎAKA ZÁSAHU? PREDPOKLADANÉ ÚSPORY ENERGIE VO VÝŠKE 31 %. NA NOVÉ ZARIADENIA SA BUDE UPLATŇOVAŤ RAD OPATRENÍ, KTORÉ MOŽNO ZHRNÚŤ TAKTO: — ZÁSAHY DO ABSORPCIE ELEKTRICKEJ ENERGIE PROSTREDNÍCTVOM POUŽÍVANIA ELEKTROMOTOROV V ENERGETICKEJ TRIEDE IE3 A (Slovak)
    5 July 2022
    0 references
    L-GĦAN TAL-PROGRAMM TA’ INVESTIMENT HUWA LI TIŻDIED L-EFFIĊJENZA ENERĠETIKA TAL-PROĊESS TA’ PRODUZZJONI PERMEZZ TAX-XIRI TA’ ŻEWĠ SISTEMI ĠODDA TA’ BEXXIEXA: IMPJANT TA ‘PIGMENTAZZJONI AWTOMATIKA B’ŻEWĠ MOD TA’ KABINI. TAĦSIR. 3000/12 + 12 PISTOLI (1,21), LI SE JISSOSTITWIXXU L-INSTALLAZZJONIJIET TAL-IMPJANT LI BĦALISSA QED JOPERAW FIS-SALA TAL-KONZERIJA VICTORIA S.R.L., LI TMUR LURA SA TMIEM IT-80S? BIDU TA '90 U MINN PERSPETTIVA MEKKANIKA (MANUTENZJONI TAL-ISTRUTTURA TRASPORTATUR), ENERĠIJA (FIR-RIGWARD TAT-TIP TA’ INSULAZZJONI) U ELETTRIKU? L-ENERĠIJA U L-KONTROLL ELETTRONIKU HUMA MAKKINARJU ANTIKWAT ĦAFNA. SPIŻA TA’ INVESTIMENT: EUR 433.200 + VAT. GRAZZI GĦALL-INTERVENT? IFFRANKAR TAL-ENERĠIJA PPROĠETTAT TA’ 31 %. SERJE TA’ MIŻURI SE JIĠU APPLIKATI GĦALL-IMPJANTI L-ĠODDA, LI JISTGĦU JINĠABRU FIL-QOSOR KIF ĠEJ: — INTERVENTI FL-ASSORBIMENTI TAL-ELETTRIKU PERMEZZ TAL-UŻU TA’ MUTURI ELETTRIĊI FIL-KLASSI TAL-ENERĠIJA IE3 U (Maltese)
    5 July 2022
    0 references
    O OBJETIVO DO PROGRAMA DE INVESTIMENTO É AUMENTAR A EFICIÊNCIA ENERGÉTICA DO PROCESSO DE PRODUÇÃO ATRAVÉS DA AQUISIÇÃO DE DOIS NOVOS SISTEMAS ESPRINKLER: PLANTA AUTOMÁTICA DE PIGMENTAÇÃO COM DOIS BOOTES MOD. TU ROT (em inglês). 3000/12 + 12 PISTÓIS (1,21), QUE VÃO SUBSTITUIR AS INSTALAÇÕES FITOFARMACÊUTICAS QUE ATUALMENTE OPERAM NO HALL DA TANNERY VICTORIA S.R.L., QUE DATARAM AO FINAL DOS Anos 80? INÍCIO DE 90 E DO PONTO DE VISTA MECÂNICO (MANUTENÇÃO DA ESTRUTURA DO TRANSPORTADOR), ENERGIA (QUANTO AO TIPO DE INSULAÇÃO) E ELÉCTRICA? A POTÊNCIA E O CONTROLO ELECTRÓNICOS SÃO MÁQUINAS ELEVADAMENTE OBSOLETAS. CUSTO DE INVESTIMENTO: 433,200 EUR + IVA. AGRADECIMENTOS À INTERVENÇÃO? Poupanças energéticas previstas de 31 %. SERÁ APLICADA UMA SÉRIE DE MEDIDAS ÀS NOVAS INSTALAÇÕES, QUE PODEM SUMMARIAR-SE DO SEGUINTE MODO: — INTERVENÇÕES EM ABSORÇÕES ELÉCTRICAS ATRAVÉS DA UTILIZAÇÃO DE MOTORES ELÉCTRICOS NA CLASSE ENERGÉTICA IE3 E (Portuguese)
    5 July 2022
    0 references
    INVESTOINTIOHJELMAN TAVOITTEENA ON PARANTAA TUOTANTOPROSESSIN ENERGIATEHOKKUUTTA OSTAMALLA KAKSI UUTTA SPRINKLERIJÄRJESTELMÄÄ: AUTOMAATTINEN PIGMENTTI KASVI, JOSSA ON KAKSI KOPPIA MOD. TU MÄTÄ. 3000/12 + 12 PISTOOLIA (1,21), JOTKA KORVAAVAT LAITOKSET, JOTKA TOIMIVAT TÄLLÄ HETKELLÄ PARKITUSLAITOKSEN VICTORIA S.R.L. SALISSA, JOTKA OVAT PERÄISIN 80S: N LOPUSTA? 90-LUVUN ALKU JA MEKAANISESTA NÄKÖKULMASTA (KANTAJARAKENTEEN YLLÄPITO), ENERGIA (ERISTYKSEN TYYPIN OSALTA) JA SÄHKÖKÄYTTÖINEN? ELEKTRONINEN TEHO JA OHJAUS OVAT ERITTÄIN VANHENTUNEITA KONEITA. INVESTOINTIKUSTANNUKSET: 433 200 EUROA + ALV. KIITOS VÄLIINTULON? ENNUSTETUT 31 PROSENTIN ENERGIANSÄÄSTÖT. UUSIIN LAITOKSIIN SOVELLETAAN USEITA TOIMENPITEITÄ, JOTKA VOIDAAN TIIVISTÄÄ SEURAAVASTI: — ENERGIALUOKAN IE3 SÄHKÖMOOTTOREIDEN KÄYTÖN AVULLA TAPAHTUVAT SÄHKÖN ABSORPTIOTOIMENPITEET JA (Finnish)
    5 July 2022
    0 references
    CELEM PROGRAMU INWESTYCYJNEGO JEST ZWIĘKSZENIE EFEKTYWNOŚCI ENERGETYCZNEJ PROCESU PRODUKCYJNEGO POPRZEZ ZAKUP DWÓCH NOWYCH INSTALACJI TRYSKACZOWYCH: AUTOMAT DO PIGMENTACJI Z DWOMA KABINAMI MOD. ZGNIJESZ TU. 3000/12 + 12 PISTOLETÓW (1,21), KTÓRE ZASTĄPIĄ INSTALACJE ZAKŁADU DZIAŁAJĄCE OBECNIE W HALI GARBARNI VICTORIA S.R.L., KTÓRA SIĘGA KOŃCA 80S? POCZĄTEK 90 I Z MECHANICZNEGO PUNKTU WIDZENIA (KONSERWACJA KONSTRUKCJI NOŚNEJ), ENERGIA (W ODNIESIENIU DO RODZAJU IZOLACJI) I ELEKTRYCZNY? ELEKTRONICZNA MOC I STEROWANIE TO BARDZO PRZESTARZAŁE MASZYNY. KOSZT INWESTYCJI: 433 200 EUR + VAT. DZIĘKI INTERWENCJI? PRZEWIDYWANE OSZCZĘDNOŚCI ENERGII NA POZIOMIE 31 %. DO NOWYCH ZAKŁADÓW ZOSTANIE ZASTOSOWANY SZEREG ŚRODKÓW, KTÓRE MOŻNA PODSUMOWAĆ W NASTĘPUJĄCY SPOSÓB: — INTERWENCJE W ZAKRESIE POCHŁANIANIA ENERGII ELEKTRYCZNEJ POPRZEZ WYKORZYSTANIE SILNIKÓW ELEKTRYCZNYCH W KLASIE ENERGETYCZNEJ IE3 ORAZ (Polish)
    5 July 2022
    0 references
    CILJ NALOŽBENEGA PROGRAMA JE POVEČATI ENERGETSKO UČINKOVITOST PROIZVODNEGA PROCESA Z NAKUPOM DVEH NOVIH SISTEMOV BRIZGALK: AVTOMATSKI PIGMENTACIJSKI OBRAT Z DVEMA KABINAMA MOD. TU GNILOBE. 3000/12 +12 PIŠTOL (1,21), KI BODO NADOMESTILE OBRATE, KI TRENUTNO OBRATUJEJO V DVORANI STROJARNE VICTORIA S.R.L., KI SEGAJO DO KONCA 80S? ZAČETEK 90 IN Z MEHANSKEGA VIDIKA (VZDRŽEVANJE NOSILNE KONSTRUKCIJE), ENERGIJE (GLEDE NA VRSTO IZOLACIJE) IN ELEKTRIČNEGA? ELEKTRONSKA MOČ IN NADZOR STA ZELO ZASTARELA STROJA. STROŠKI NALOŽBE: 433,200 EUR + DDV. PO ZASLUGI INTERVENCIJE? PREDVIDENI PRIHRANKI ENERGIJE V VIŠINI 31 %. ZA NOVE OBRATE BO UPORABLJENA VRSTA UKREPOV, KI JIH JE MOGOČE POVZETI NA NASLEDNJI NAČIN: — POSEGI V ABSORPCIJO ELEKTRIČNE ENERGIJE Z UPORABO ELEKTROMOTORJEV V ENERGIJSKEM RAZREDU IE3 IN (Slovenian)
    5 July 2022
    0 references
    CÍLEM INVESTIČNÍHO PROGRAMU JE ZVÝŠIT ENERGETICKOU ÚČINNOST VÝROBNÍHO PROCESU NÁKUPEM DVOU NOVÝCH ZAVLAŽOVACÍCH SYSTÉMŮ: AUTOMATICKÁ PIGMENTACE ROSTLINA SE DVĚMA KABINAMI MOD. TU HNILOBU. 3000/12 + 12 PISTOLÍ (1,21), KTERÉ NAHRADÍ ZAŘÍZENÍ PROVOZOVANÁ V SOUČASNÉ DOBĚ V HALE KOŽELUŽNY VICTORIA S.R.L., KTERÁ SE DATUJE DO KONCE 80S? ZAČÁTEK 90 A Z MECHANICKÉHO HLEDISKA (ÚDRŽBA NOSNÉ KONSTRUKCE), ENERGIE (S OHLEDEM NA TYP IZOLACE) A ELEKTRICKÁ? ELEKTRONICKÉ NAPÁJENÍ A ŘÍZENÍ JSOU VELMI ZASTARALÉ STROJE. INVESTIČNÍ NÁKLADY: 433,200 EUR + DPH. DÍKY TÉ INTERVENCI? PŘEDPOKLÁDANÉ ÚSPORY ENERGIE VE VÝŠI 31 %. NA NOVÉ ZÁVODY BUDE POUŽITA ŘADA OPATŘENÍ, KTERÁ LZE SHRNOUT TAKTO: — ZÁSAHY DO ABSORPCE ELEKTRICKÉ ENERGIE PROSTŘEDNICTVÍM POUŽITÍ ELEKTROMOTORŮ V ENERGETICKÉ TŘÍDĚ IE3 A (Czech)
    5 July 2022
    0 references
    INVESTICIJŲ PROGRAMOS TIKSLAS – PADIDINTI GAMYBOS PROCESO ENERGIJOS VARTOJIMO EFEKTYVUMĄ PERKANT DVI NAUJAS PURKŠTUVŲ SISTEMAS: AUTOMATINIS PIGMENTACIJOS ĮRENGINYS SU DVIEM KABINOMIS MOD. TU PUVINIO. 3000/12 + 12 PISTOLETŲ (1,21), KURIE PAKEIS GAMYKLOS ĮRENGINIUS, ŠIUO METU VEIKIANČIUS ĮDEGIO VICTORIA S.R.L. SALĖJE, KURI DATUOTA IKI 80S PABAIGOS? 90 PRADŽIA IR MECHANINIU POŽIŪRIU (NEŠIKLIO KONSTRUKCIJOS PRIEŽIŪRA), ENERGIJA (ATSIŽVELGIANT Į IZOLIACIJOS TIPĄ) IR ELEKTRINIS? ELEKTRONINĖ GALIA IR VALDYMAS YRA LABAI PASENUSIOS MAŠINOS. INVESTICINĖS SĄNAUDOS: 433 200 EUR + PVM. DĖL INTERVENCIJOS? PROGNOZUOJAMAS 31 % SUTAUPYTOS ENERGIJOS KIEKIS. NAUJOMS ĮMONĖMS BUS TAIKOMOS KELIOS PRIEMONĖS, KURIAS GALIMA APIBENDRINTI TAIP: – INTERVENCIJŲ, SUSIJUSIŲ SU ELEKTROS ENERGIJOS SUGĖRIMU NAUDOJANT IE3 ENERGIJOS KLASĖS ELEKTROS VARIKLIUS, IR (Lithuanian)
    5 July 2022
    0 references
    IEGULDĪJUMU PROGRAMMAS MĒRĶIS IR PALIELINĀT RAŽOŠANAS PROCESA ENERGOEFEKTIVITĀTI, IEGĀDĀJOTIES DIVAS JAUNAS SPRINKLERU SISTĒMAS: AUTOMĀTISKA PIGMENTĀCIJAS IEKĀRTA AR DIVĀM KABĪNĒM MOD. TU PUVE. 3000/12 + 12 PISTOLES (1,21), KAS AIZSTĀS IEKĀRTAS, KURAS PAŠLAIK DARBOJAS TANRĪNAS VIKTORIJAS S.R.L. ZĀLĒ, KAS DATĒTA AR 80S BEIGĀM? SĀKUMS 90 UN NO MEHĀNISKĀ VIEDOKĻA (UZTURĒŠANA NESĒJBŪVES), ENERĢIJA (ATTIECĪBĀ UZ IZOLĀCIJAS VEIDU) UN ELEKTRISKĀ? ELEKTRONISKĀ JAUDA UN KONTROLE IR ĻOTI NOVECOJUŠAS MAŠĪNAS. IEGULDĪJUMU IZMAKSAS: 433,200 EUR + PVN. PATEICOTIES INTERVENCEI? PROGNOZĒTAIS ENERĢIJAS IETAUPĪJUMS 31 % APMĒRĀ. JAUNAJĀM IEKĀRTĀM PIEMĒROS VIRKNI PASĀKUMU, KURUS VAR APKOPOT ŠĀDI: — IEJAUKŠANĀS ELEKTROENERĢIJAS ABSORBCIJĀ, IZMANTOJOT ELEKTROMOTORUS IE3 ENERĢIJAS KLASĒ, UN (Latvian)
    5 July 2022
    0 references
    ЦЕЛТА НА ИНВЕСТИЦИОННАТА ПРОГРАМА Е ДА СЕ ПОВИШИ ЕНЕРГИЙНАТА ЕФЕКТИВНОСТ НА ПРОИЗВОДСТВЕНИЯ ПРОЦЕС ЧРЕЗ ЗАКУПУВАНЕ НА ДВЕ НОВИ СПРИНКЛЕРНИ СИСТЕМИ: АВТОМАТИЧНА ИНСТАЛАЦИЯ ЗА ПИГМЕНТАЦИЯ С ДВЕ КАБИНИ МОД. ТОВА Е ГНИЕНЕ. 3000/12 + 12 ПИСТОЛЕТА (1,21), КОИТО ЩЕ ЗАМЕНЯТ ИНСТАЛАЦИИТЕ, КОИТО ПОНАСТОЯЩЕМ ФУНКЦИОНИРАТ В ЗАЛАТА НА ЩАВЕНИЯ ЗАВОД VICTORIA S.R.L., КОИТО ДАТИРАТ ОТ КРАЯ НА 80-ТЕ? НАЧАЛО НА 90 И ОТ МЕХАНИЧНА ГЛЕДНА ТОЧКА (ПОДДРЪЖКА НА НОСЕЩАТА КОНСТРУКЦИЯ), ЕНЕРГИЯ (ПО ОТНОШЕНИЕ НА ВИДА НА ИЗОЛАЦИЯТА) И ЕЛЕКТРИЧЕСКА? ЕЛЕКТРОННАТА МОЩНОСТ И УПРАВЛЕНИЕ СА МНОГО ОСТАРЕЛИ МАШИНИ. ИНВЕСТИЦИОННИ РАЗХОДИ: 433,2000 EUR + ДДС. БЛАГОДАРЕНИЕ НА НАМЕСАТА? ПРОГНОЗИРАНИ ИКОНОМИИ НА ЕНЕРГИЯ ОТ 31 %. КЪМ НОВИТЕ ИНСТАЛАЦИИ ЩЕ БЪДАТ ПРИЛОЖЕНИ РЕДИЦА МЕРКИ, КОИТО МОГАТ ДА БЪДАТ ОБОБЩЕНИ, КАКТО СЛЕДВА: — ИНТЕРВЕНЦИИ В ПОГЛЪЩАНЕТО НА ЕЛЕКТРОЕНЕРГИЯ ЧРЕЗ ИЗПОЛЗВАНЕ НА ЕЛЕКТРОДВИГАТЕЛИ С ЕНЕРГИЕН КЛАС IE3 И (Bulgarian)
    5 July 2022
    0 references
    A BERUHÁZÁSI PROGRAM CÉLJA A TERMELÉSI FOLYAMAT ENERGIAHATÉKONYSÁGÁNAK NÖVELÉSE KÉT ÚJ VÍZPERMETTEL OLTÓ BERENDEZÉS BESZERZÉSE RÉVÉN: AUTOMATA PIGMENTÁCIÓS ÜZEM KÉT FÜLKÉVEL MOD. A TU ROTHADÁS. 3000/12 + 12 PISZTOLY (1,21), AMELY FELVÁLTJA A JELENLEG A TANNERY VICTORIA S.R.L. CSARNOKÁBAN MŰKÖDŐ LÉTESÍTMÉNYEKET, AMELYEK A 80S VÉGÉIG NYÚLNAK VISSZA? KEZDETE 90 ÉS MECHANIKAI SZEMPONTBÓL (KARBANTARTÁS A HORDOZÓ SZERKEZET), ENERGIA (TEKINTETTEL A SZIGETELÉS TÍPUSA) ÉS ELEKTROMOS? AZ ELEKTRONIKUS TELJESÍTMÉNY ÉS VEZÉRLÉS RENDKÍVÜL ELAVULT GÉPEK. BERUHÁZÁSI KÖLTSÉG: 433,200 EUR + ÁFA. A BEAVATKOZÁSNAK KÖSZÖNHETŐEN? 31%-OS ELŐREJELZETT ENERGIAMEGTAKARÍTÁS. AZ ÚJ ÜZEMEKRE SZÁMOS INTÉZKEDÉST FOGNAK ALKALMAZNI, AMELYEK A KÖVETKEZŐKÉPPEN FOGLALHATÓK ÖSSZE: AZ IE3 ENERGIAOSZTÁLYBA TARTOZÓ ELEKTROMOS MOTOROK HASZNÁLATA RÉVÉN TÖRTÉNŐ VILLAMOSENERGIA-ELNYELÉSI BEAVATKOZÁSOK, VALAMINT (Hungarian)
    5 July 2022
    0 references
    IS É CUSPÓIR AN CHLÁIR INFHEISTÍOCHTA ÉIFEACHTÚLACHT FUINNIMH AN PHRÓISIS TÁIRGTHE A MHÉADÚ TRÍ DHÁ CHÓRAS SPRINKLER NUA A CHEANNACH: GLÉASRA LÍ UATHOIBRÍOCH LE DHÁ BHOTH MOD. TU LOBHADH. 3000/12 + 12 PIOSTAIL (1,21), A THIOCFAIDH IN IONAD NA SUITEÁLACHA PLANDAÍ ATÁ AG FEIDHMIÚ FAOI LÁTHAIR I HALLA AN TANNERY VICTORIA S.R.L., A THÉANN SIAR GO DTÍ DEIREADH AN 80S? TÚS 90 AGUS Ó THAOBH MEICNIÚIL (COTHABHÁIL AN STRUCHTÚIR IOMPRÓRA), FUINNEAMH (MAIDIR LEIS AN GCINEÁL INSLITHE) AGUS LEICTREACH? TÁ CUMHACHT AGUS RIALÚ LEICTREONACH INNEALRA THAR A BHEITH IMITHE I LÉIG. COSTAS INFHEISTÍOCHTA: EUR 433.200 + CBL. A BHUÍOCHAS LEIS AN IDIRGHABHÁIL? COIGILT FUINNIMH RÉAMH-MHEASTA 31 %. CUIRFEAR SRAITH BEART I BHFEIDHM AR NA PLANDAÍ NUA, AR FÉIDIR ACHOIMRE A DHÉANAMH ORTHU MAR SEO A LEANAS: — IDIRGHABHÁLACHA IN IONSÚCHÁIN LEICTREACHAIS TRÍ MHÓTAIR LEICTREACHA A ÚSÁID IN AICME FUINNIMH IE3 AGUS (Irish)
    5 July 2022
    0 references
    SYFTET MED INVESTERINGSPROGRAMMET ÄR ATT ÖKA ENERGIEFFEKTIVITETEN I PRODUKTIONSPROCESSEN GENOM INKÖP AV TVÅ NYA SPRINKLERSYSTEM: AUTOMATISK PIGMENTERINGSANLÄGGNING MED TVÅ BÅS MOD. TU RUTTNAR. 3000/12 + 12 PISTOLER (1,21), SOM KOMMER ATT ERSÄTTA DE ANLÄGGNINGAR SOM FÖR NÄRVARANDE ÄR I DRIFT I GARVERIET VICTORIA S.R.L., SOM GÅR TILLBAKA TILL SLUTET AV 80S? BÖRJAN AV 90 OCH UR MEKANISK SYNVINKEL (UNDERHÅLL AV BÄRARSTRUKTUREN), ENERGI (MED AVSEENDE PÅ TYPEN AV ISOLERING) OCH ELEKTRISK? ELEKTRONISK KRAFT OCH STYRNING ÄR MYCKET FÖRÅLDRADE MASKINER. INVESTERINGSKOSTNADER: 433,200 EUR + MOMS. TACK VARE INTERVENTIONEN? BERÄKNADE ENERGIBESPARINGAR PÅ 31 %. EN RAD ÅTGÄRDER KOMMER ATT VIDTAS FÖR DE NYA ANLÄGGNINGARNA, VILKA KAN SAMMANFATTAS PÅ FÖLJANDE SÄTT: — INGREPP I ELABSORPTION GENOM ANVÄNDNING AV ELMOTORER I ENERGIKLASS IE3 OCH (Swedish)
    5 July 2022
    0 references
    INVESTEERIMISPROGRAMMI EESMÄRK ON SUURENDADA TOOTMISPROTSESSI ENERGIATÕHUSUST KAHE UUE SPRINKLERSÜSTEEMI OSTMISE KAUDU: AUTOMAATNE PIGMENTATSIOONI TAIM KAHE KABIINI MOD. TU MÄDANIK. 3000/12 + 12 PÜSTOLIT (1,21), MIS ASENDAVAD PRAEGU PARKIMISMAJA VICTORIA S.R.L. SAALIS TEGUTSEVAID TEHASERAJATISI, MIS PÄRINEVAD 80S LÕPUST? ALATES 90. AASTAST JA MEHAANILISEST VAATEPUNKTIST (KANDESTRUKTUURI SÄILITAMINE), ENERGIAST (SEOSES ISOLATSIOONI TÜÜBIGA) JA ELEKTRIST? ELEKTROONILINE VÕIMSUS JA JUHTIMINE ON VÄGA VANANENUD MASINAD. INVESTEERIMISKULUD: 433.200 EUROT + KÄIBEMAKS. TÄNU SEKKUMISELE? PROGNOOSITUD ENERGIASÄÄST 31 %. UUTE TEHASTE SUHTES KOHALDATAKSE MITMEID MEETMEID, MILLE VÕIB KOKKU VÕTTA JÄRGMISELT: – SEKKUMISED ELEKTRI NEELDUMISSE ENERGIAKLASSI IE3 KUULUVATE ELEKTRIMOOTORITE ABIL JA (Estonian)
    5 July 2022
    0 references
    24 April 2023
    0 references
    TOSCANA
    0 references

    Identifiers