Construction of WSS infrastructure in the separate area served by Water Supply and Sewerage EOOD, Vidin (Q3832241)
Jump to navigation
Jump to search
Project Q3832241 in Bulgaria
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of WSS infrastructure in the separate area served by Water Supply and Sewerage EOOD, Vidin |
Project Q3832241 in Bulgaria |
Statements
15,246,929.81 Bulgarian lev
0 references
7,775,934.2 Euro
0 references
19,722,445.83 Bulgarian lev
0 references
10,058,447.37 Euro
0 references
77.31 percent
0 references
5 September 2019
0 references
5 March 2024
0 references
"Водоснабдяване и канализация ЕООД" Видин
0 references
Общо, за Агломерация Видин, се предвиждат следните мерки:-по компонент Водоснабдяване:•подмяна на съществуващия довеждащ водопровод ф900мм стомана с PVC_O тръби с диаметър Ф630mm, L = 10, 372 km с PN 12,5 atm;•подмяна на съществуващите две етернитови тръби ф536 mm и на съществуващите две стоманени тръби ф630 mm с ф500mm PVC_O тръби с PN 12,5 atm и обща дължина L = 4,149 km; L обща=14,521km.-по компонент Събиране на отпадъчни води се предвижда:•реконструкция на част от Главен Колектор II с яйцевиден профил 1520/2400 mm и 1120/2150 mm. Той ще бъде подменен с канал от GRP с ф1800mm с дължина L = 1,356km и участък с РР тръби 2xф1000mm с L =94m при преминаване под ж.п. линията; L обща=1,450 km.-по компонент Пречистване на отпадъчни води не са предвидени инвестиционни мерки. ПСОВ е в процес на изграждане. (Bulgarian)
0 references
In total, for the Vidin agglomeration, the following measures are foreseen:-by component Water supply: •replacement of the existing lead pipe ph900 mm with PVC_O pipes with diameter F630mm, L = 10.372 km with PN 12.5 atm;•replacement of the existing two etherite pipes f536 mm and of the existing two steel pipes f630 mm by f500 mm PVC_O pipes with PN 12.5 atm and total length L = 4.149 km; L total=14.521 km.-by component Wastewater collection is foreseen: •Reconstruction of a part of Master Collector II with an egg profile of 1520/2400 mm and 1120/2150 mm. It will be replaced by a GRP channel with f1800 mm with length L = 1.356 km and PP section 2x1000 mm with L =94 m when crossing the line; L total = 1.450 km.- by component Wastewater treatment no investment measures are foreseen. The WWTP is under construction. (English)
2 December 2021
0.6440257689030342
0 references
Au total, pour l’agglomération de Vidin, les mesures suivantes sont prévues:-par composant Approvisionnement en eau: • remplacement du tuyau de plomb existant ph900 mm par des tuyaux PVC_O de diamètre F630mm, L = 10,372 km par PN 12,5 atm;• remplacement des deux tuyaux en éthrite existants f536 mm et des deux tubes en acier f630 mm par f500 mm PVC_O avec PN 12,5 atm et longueur totale L = 4,149 km; L=14,521 km.-par composant La collecte des eaux usées est prévue: •Reconstruction d’une partie du Maître collecteur II avec un profil d’œuf de 1520/2400 mm et 1120/2150 mm. Il sera remplacé par un chenal GRP avec f1800 mm avec une longueur L = 1,356 km et une section PP 2x1000 mm avec L =94 m lors du franchissement de la ligne; L total = 1,450 km.- par composante Traitement des eaux usées Aucune mesure d’investissement n’est prévue. La station d’épuration est en cours de construction. (French)
3 December 2021
0 references
Insgesamt sind für den Ballungsraum Vidin folgende Maßnahmen vorgesehen:-für Komponenten Wasserversorgung: • Ersatz des vorhandenen Bleirohres ph900 mm mit PVC_O-Rohren mit einem Durchmesser F630mm, L = 10,372 km mit PN 12,5 atm; • Ersatz der bestehenden zwei Etheritrohre f536 mm und der bestehenden zwei Stahlrohre f630 mm durch f500 mm PVC_O Rohre mit PN 12,5 atm und Gesamtlänge L = 4,49 km; L insgesamt=14,521 km.-für Komponenten Abwassersammlung ist vorgesehen: •Rekonstruktion eines Teils des Meistersammels II mit einem Eiprofil von 1520/2400 mm und 1120/2150 mm. Er wird durch einen GFK-Kanal mit f1800 mm mit Länge L = 1,356 km und PP-Abschnitt 2x1000 mm mit L =94 m beim Überqueren der Strecke ersetzt; L insgesamt = 1,450 km.- nach Komponenten Abwasserbehandlung sind keine Investitionsmaßnahmen vorgesehen. Das WWTP befindet sich im Aufbau. (German)
4 December 2021
0 references
In totaal zijn voor de agglomeratie Vidin de volgende maatregelen gepland:-per component Watervoorziening: •vervanging van de bestaande loodpijp ph900 mm door PVC_O-buizen met een diameter F630mm, L = 10,372 km met PN 12,5 atm;•vervanging van de bestaande twee etherietbuizen f536 mm en van de bestaande twee stalen buizen f630 mm door f500 mm PVC_O-buizen met PN 12,5 atm en totale lengte L = 4,149 km; L totaal=14,521 km.-per component Afvalwaterinzameling is gepland: •Herbouw van een deel van Master Collector II met een eiprofiel van 1520/2400 mm en 1120/2150 mm. Het wordt vervangen door een GRP-kanaal met f1800 mm met lengte L = 1,356 km en PP-sectie 2x1000 mm met L = 94 m bij het overschrijden van de lijn; L totaal = 1,450 km.- per component Afvalwaterzuivering zijn geen investeringsmaatregelen voorzien. De RWZI is in aanbouw. (Dutch)
10 December 2021
0 references
In totale, per l'agglomerato di Vidin, sono previste le seguenti misure:-per componente di approvvigionamento idrico: •sostituzione del tubo di piombo esistente ph900 mm con tubi in PVC_O con diametro F630mm, L = 10,372 km con PN 12,5 atm;• sostituzione dei due tubi di eterite esistenti f536 mm e dei due tubi in acciaio esistenti f630 mm per f500 mm con tubi PVC_O PN 12,5 atm e lunghezza totale L = 4,149 km; L totale=14,521 km.-per componente La raccolta delle acque reflue è prevista: •Ricostruzione di una parte di Master Collector II con un profilo uovo di 1520/2400 mm e 1120/2150 mm. Sarà sostituito da un canale GRP con f1800 mm con lunghezza L = 1,356 km e PP sezione 2x1000 mm con L =94 m all'atto dell'attraversamento della linea; L totale = 1,450 km.- per componente trattamento delle acque reflue non sono previste misure di investimento. Il WWTP è in costruzione. (Italian)
13 January 2022
0 references
En total, para la aglomeración de Vidin, se prevén las siguientes medidas: -por componente Suministro de agua: • Sustitución del tubo de plomo existente ph900 mm por tubos PVC_O con diámetro F630mm, L = 10,372 km con PN 12,5 atm;•sustitución de los dos tubos de eterita existentes f536 mm y de los dos tubos de acero existentes f630 mm por f500 mm PVC_O con PN 12,5 atm y longitud total L = 4,49 km; L total=14,521 km.-por componente Se prevé la recogida de aguas residuales: •Reconstrucción de una parte del Master Collector II con un perfil de huevo de 1520/2400 mm y 1120/2150 mm. Se sustituirá por un canal GRP con f1800 mm con longitud L = 1,356 km y sección PP 2x1000 mm con L = 94 m al cruzar la línea; L total = 1,450 km.- por componente Tratamiento de aguas residuales no se prevén medidas de inversión. La EDAR está en construcción. (Spanish)
14 January 2022
0 references
I alt forudses følgende foranstaltninger for byområdet Vidin:-for hver komponent Vandforsyning: •udskiftning af det eksisterende blyrør ph900 mm med PVC_O-rør med diameter F630 mm, L = 10,372 km med PN 12,5 atm • udskiftning af de eksisterende to etheritrør f536 mm og af de eksisterende to stålrør f630 mm med f500 mm PVC_O-rør med PN 12,5 atm og samlet længde L = 4,149 km; L i alt=14,521 km.-for hver komponent spildevandsopsamling er planlagt: •Genopbygning af en del af Master Collector II med en ægprofil på 1520/2400 mm og 1120/2150 mm. Den erstattes af en GRP-kanal med f1800 mm med længde L = 1,356 km og PP sektion 2x1000 mm med L =94 m ved passage af linjen L i alt = 1,450 km.- pr. komponent spildevandsrensning er ikke planlagt nogen investeringsforanstaltninger. Rensningsanlægget er under opførelse. (Danish)
19 July 2022
0 references
Συνολικά, για τον οικισμό Vidin, προβλέπονται τα ακόλουθα μέτρα:-ανά συνιστώσα παροχή νερού: •αντικατάσταση του υπάρχοντος μολύβδινου σωλήνα ph900 mm με σωλήνες PVC_O διαμέτρου F630mm, L = 10,372 km με PN 12,5 atm·•αντικατάσταση των υφιστάμενων δύο αιθεριτικών σωλήνων f536 mm και των υφιστάμενων δύο χαλύβδινων σωλήνων f630 mm από σωλήνες PVC_O f500 mm με PN 12,5 atm και συνολικό μήκος L = 4,149 km· L total=14,521 km.-ανά συνιστώσα Η συλλογή λυμάτων προβλέπεται: •Ανακατασκευή τμήματος του κύριου συλλέκτη ΙΙ με προφίλ αυγών 1520/2400 mm και 1120/2150 mm. Θα αντικατασταθεί από κανάλι GRP με f1800 mm μήκους L = 1,356 km και τμήμα PP 2x1000 mm με L =94 m κατά τη διέλευση της γραμμής· L σύνολο = 1,450 km.- ανά συνιστώσα Επεξεργασία λυμάτων δεν προβλέπονται επενδυτικά μέτρα. Το WWTP είναι υπό κατασκευή. (Greek)
19 July 2022
0 references
Ukupno, za aglomeraciju Vidin predviđene su sljedeće mjere: – po komponentama Opskrba vodom: •zamjena postojeće olovne cijevi ph900 mm PVC-O cijevi promjera F630mm, L = 10,372 km s PN 12,5 atm;• zamjena postojećih dviju eteritnih cijevi f536 mm i postojećih dviju čeličnih cijevi f630 mm f500 mm PVC_O cijevi s PN 12,5 atm i ukupne duljine L = 4,49 km; L ukupno = 14,521 km.-po komponenti je predviđeno prikupljanje otpadnih voda: •Rekonstrukcija dijela glavnog kolektora II s profilom jajašca 1520/2400 mm i 1120/2150 mm. Zamijenit će se GRP kanalom s f1800 mm duljine L = 1,356 km i PP presjekom 2x1000 mm s L = 94 m pri prelasku pruge; L ukupno = 1,450 km.- Pročišćavanje otpadnih voda po sastavnim dijelovima nisu predviđene mjere ulaganja. WWTP je u izgradnji. (Croatian)
19 July 2022
0 references
În total, pentru aglomerarea Vidin, sunt prevăzute următoarele măsuri: •înlocuirea țevii de plumb existente ph900 mm cu țevi PVC_O cu diametrul F630mm, L = 10,372 km cu PN 12,5 atm;•înlocuirea celor două țevi etrite existente f536 mm și a celor două țevi de oțel existente f630 mm cu f500 mm țevi PVC_O cu PN 12,5 atm și lungimea totală L = 4,149 km; L total=14,521 km. – cu componentă de colectare a apelor uzate este prevăzută: • Reconstrucția unei părți a Master Collector II cu un profil de ou de 1520/2400 mm și 1120/2150 mm. Acesta va fi înlocuit cu un canal GRP cu f1800 mm cu lungime L = 1,356 km și PP secțiune 2x1000 mm cu L = 94 m la trecerea liniei; L total = 1,450 km.- pe componente de tratare a apelor uzate nu sunt prevăzute măsuri de investiții. WWTP este în construcție. (Romanian)
19 July 2022
0 references
V prípade aglomerácie Vidin sa celkovo predpokladajú tieto opatrenia: – podľa zložky Dodávka vody: •výmena existujúcej olovenej rúrky ph900 mm rúrkami z PVC_O s priemerom F630 mm, L = 10,372 km s PN 12,5 atm;•výmena existujúcich dvoch éteritových rúr f536 mm a existujúcich dvoch oceľových rúr f630 mm f500 mm PVC_O rúrok s PN 12,5 atm a celkovou dĺžkou L = 4,149 km; L spolu = 14,521 km podľa jednotlivých zložiek sa predpokladá zber odpadových vôd: •Rekonštrukcia časti Master Collector II s vaječným profilom 1520/2400 mm a 1120/2150 mm. Nahradí sa kanálom GRP s dĺžkou f1800 mm s dĺžkou L = 1,356 km a PP úsekom 2x1000 mm s L = 94 m pri prekročení línie; L spolu = 1,450 km.- podľa zložiek čistenie odpadových vôd sa nepredpokladajú žiadne investičné opatrenia. ČOV je vo výstavbe. (Slovak)
19 July 2022
0 references
B’kollox, għall-agglomerazzjoni ta’ Vidin, huma previsti l-miżuri li ġejjin:-skont il-komponent Provvista tal-ilma: •is-sostituzzjoni tal-pajp taċ-ċomb eżistenti ph900 mm b’pajpijiet PVC_O b’dijametru F630mm, L = 10.372 km b’PN 12.5 atm;•sostituzzjoni taż-żewġ pajpijiet eżistenti tal-eterit f536 mm u taż-żewġ pajpijiet eżistenti tal-azzar f630 mm b’pajpijiet f500 mm PVC_O b’PN 12.5 atm u tul totali L = 4.149 km; L total ta’=14.521 km.-skont il-komponent Il-ġbir tal-ilma mormi huwa previst: •Ir-rikostruzzjoni ta’ parti mill-Kolletturi tal-Master II bi profil tal-bajd ta’ 1520/2400 mm u 1120/2150 mm. Din se tiġi sostitwita minn kanal GRP b’f1800 mm b’tul L = 1.356 km u PP sezzjoni 2x1000 mm b’L = 94 m meta taqsam il-linja; L total = 1.450 km.- skont il-komponent It-trattament tal-ilma mormi ma huma previsti l-ebda miżuri ta’ investiment. Id-WWTP qed tinbena. (Maltese)
19 July 2022
0 references
No total, para a aglomeração de Vidin, estão previstas as seguintes medidas:-por componente de abastecimento de água: •substituição do tubo de chumbo existente ph900 mm por tubos de PVC_O com diâmetro F630mm, L = 10,372 km com PN 12,5 atm;•substituição dos dois tubos de eterite existentes f536 mm e dos dois tubos de aço existentes f630 mm por tubos de PVC_O f500 mm com PN 12,5 atm e comprimento total L = 4,149 km; L total=14 521 km.-por componente A recolha de águas residuais está prevista: •Reconstrução de uma parte do coletor principal II com um perfil de ovo de 1520/2400 mm e 1120/2150 mm. Será substituído por um canal GRP com f1800 mm com comprimento L = 1,356 km e secção PP 2x1000 mm com L = 94 m ao atravessar a linha; L total = 1,450 km.- por componente Tratamento de águas residuais não estão previstas medidas de investimento. A ETAR está em construção. (Portuguese)
19 July 2022
0 references
Vidinin taajaman osalta suunnitellaan yhteensä seuraavia toimenpiteitä: vesihuollon osa-alueittain: •nykyisen lyijyputken ph900 mm korvaaminen PVC_O-putkilla, joiden halkaisija on F630 mm, L = 10,372 km ja PN 12,5 atm; • nykyisten kahden eetiittiputken f536 mm ja nykyisten kahden teräsputken f630 mm korvaaminen f500 mm PVC_O-putkilla, joiden PN 12,5 atm ja kokonaispituus L = 4,149 km; L yhteensä = 14,521 km. – Osakohtaisesti Jäteveden keräys on suunniteltu: •Kunnostetaan osa Master Collector II:sta, jonka munaprofiili on 1520/2400 mm ja 1120/2150 mm. Se korvataan GRP-kanavalla, jonka pituus on f1800 mm ja pituus L = 1,356 km ja PP-osa 2x1000 mm, L = 94 m ylitettäessä linjaa; L yhteensä = 1 450 km.- osa-alueittain jäteveden käsittely ei ole suunnitteilla investointitoimenpiteitä. Jätevedenpuhdistamo on rakenteilla. (Finnish)
19 July 2022
0 references
W odniesieniu do aglomeracji Vidin przewiduje się łącznie następujące środki: – w podziale na komponenty Zaopatrzenie w wodę: • wymiana istniejącej rury ołowiowej ph900 mm rur PVC_O o średnicy F630mm, L = 10,372 km z PN 12,5 atm;• wymiana istniejących dwóch rur eterytowych f536 mm i dwóch istniejących rur stalowych f630 mm na f500 mm PVC_O o PN 12,5 atm i długości całkowitej L = 4,149 km; L Total=14,521 km.--w podziale na komponent Przewiduje się odprowadzanie ścieków: • Przebudowa części Master Collector II o profilu jaj 1520/2400 mm i 1120/2150 mm. Zostanie zastąpiony kanałem GRP o długości f1800 mm o długości L = 1,356 km i odcinku PP 2x1000 mm przy przekraczaniu linii L =94 m; L ogółem = 1,450 km.- według komponentów Oczyszczanie ścieków nie przewiduje działań inwestycyjnych. Oczyszczalnia ścieków jest w budowie. (Polish)
19 July 2022
0 references
Za aglomeracijo Vidin so predvideni naslednji ukrepi: po komponenti oskrba z vodo: •nadomestitev obstoječe svinčene cevi ph900 mm s PVC_O cevi s premerom F630mm, L = 10,372 km s PN 12,5 atm;•zamenjava obstoječih dveh eteritnih cevi f536 mm in obstoječih dveh jeklenih cevi f630 mm s f500 mm PVC_O cevi s PN 12,5 atm in skupno dolžino L = 4,149 km; L skupaj = 14 521 km.-po komponenti zbiranje odpadne vode je predvideno: •Obnova dela Master Collector II s profilom jajc 1520/2400 mm in 1120/2150 mm. Nadomeščen bo z GRP kanalom s f1800 mm z dolžino L = 1,356 km in PP odsekom 2x1000 mm z L = 94 m pri prečkanju črte; L skupaj = 1,450 km.- po komponenti Čiščenje odpadne vode ni predvidenih naložbenih ukrepov. Čistilna naprava je v gradnji. (Slovenian)
19 July 2022
0 references
Celkem se pro aglomeraci Vidin předpokládají tato opatření:-podle složky Dodávky vody: •výměna stávajících olověných trubek ph900 mm za trubky PVC_O o průměru F630mm, L = 10,372 km s PN 12,5 atm; • výměna stávajících dvou etheritových trubek f536 mm a stávajících dvou ocelových trubek f630 mm f500 mm PVC_O trubek s PN 12,5 atm a celkovou délkou L = 4,149 km; L celkem=14,521 km-odběr odpadních vod se předpokládá: •Rekonstrukce části Master Collector II s profilem vajec 1520/2400 mm a 1120/2150 mm. Bude nahrazena GRP kanálem f1800 mm o délce L = 1,356 km a PP úsekem 2x1000 mm s L = 94 m při překračování čáry; L celkem = 1,450 km.- podle složek Čištění odpadních vod se nepředpokládají žádná investiční opatření. ČOV je ve výstavbě. (Czech)
19 July 2022
0 references
Iš viso Vidino aglomeracijoje numatytos šios priemonės:-pagal sudedamąją dalį Vandens tiekimas: • esamo švino vamzdžio ph900 mm pakeitimas PVC_O vamzdžiais, kurių skersmuo F630mm, L = 10,372 km su PN 12,5 atm;•esamų dviejų eterinių vamzdžių f536 mm ir esamų dviejų plieninių vamzdžių f630 mm pakeitimas f500 mm PVC_O vamzdžiais su PN 12,5 atm ir bendras ilgis L = 4,149 km; L iš viso=14,521 km pagal komponentus numatytas nuotekų surinkimas: •„Master Collector II“ dalies, kurios kiaušinio profilis yra 1520/2400 mm ir 1120/2150 mm, rekonstrukcija. Per liniją kertamas GRP kanalas su f1800 mm ilgio L = 1,356 km ir PP skyrius 2x1000 mm su L = 94 m; L iš viso = 1 450 km.- pagal komponentą Nuotekų valymas nenumatytos jokios investicinės priemonės. Statomas WWTP. (Lithuanian)
19 July 2022
0 references
Kopumā Vidinas aglomerācijā ir paredzēti šādi pasākumi:-pa komponentiem Ūdensapgāde: • esošās svina caurules ph900 mm aizstāšana ar PVC_O caurulēm, kuru diametrs ir F630mm, L = 10,372 km ar PN 12,5 atm;•esošo divu ēterīta cauruļu f536 mm un esošo divu tērauda cauruļu f630 mm ar f500 mm PVC_O caurulēm ar PN 12,5 atm un kopējo garumu L = 4,149 km aizstāšana; L kopā = 14 521 km — pa komponentiem notekūdeņu savākšana ir paredzēta: •Galvenā kolekcionāra II daļas rekonstrukcija ar olu profilu 1520/2400 mm un 1120/2150 mm. To aizstās ar GRP kanālu ar f1800 mm garumu L = 1,356 km un PP sekciju 2x1000 mm ar L =94 m, šķērsojot līniju; L kopā = 1,450 km.- pa komponentiem Notekūdeņu attīrīšanai nav paredzēti ieguldījumu pasākumi. Notekūdeņu attīrīšanas iekārta tiek būvēta. (Latvian)
19 July 2022
0 references
A Vidin agglomerációra vonatkozóan összesen a következő intézkedések vannak előirányozva: – komponensenként Vízellátás: •a meglévő ph900 mm-es, F630 mm átmérőjű PVC_O csövek cseréje, L = 10,372 km, PN 12,5 atm; •a meglévő két éterit cső f536 mm és a meglévő két f630 mm-es acélcső cseréje f500 mm PVC_O csövekkel, amelyek PN 12,5 atm és teljes hossza L = 4,149 km; L összesen = 14 521 km. – komponensenként Szennyvízgyűjtés: •A Master Collector II egy részének átalakítása 1520/2400 mm és 1120/2150 mm-es tojásprofillal. A vonal átlépésekor egy f1800 mm hosszú, L = 1,356 km hosszúságú GRP-csatorna és 2x1000 mm PP szakasz, L =94 m; L összesen = 1,450 km.- komponensenként Szennyvízkezelés nincs előirányozva beruházási intézkedésre. A szennyvíztisztító telep építése folyamatban van. (Hungarian)
19 July 2022
0 references
Ar an iomlán, maidir leis an gceirtleán Vidin, foráiltear do na bearta seo a leanas:-ar chomhchuid soláthar uisce: •athsholáthar an ph900 mm píopa luaidhe atá ann cheana féin le píopaí PVC_O le trastomhas F630mm, L = 10.372 km le PN 12.5 atm;• athsholáthar an dá phíopa éitearacha atá ann cheana féin f536 mm agus an dá phíopa cruach atá ann cheana féin f630 mm le f500 mm PVC_O píopaí le PN 12.5 atm agus fad iomlán L = 4.149 km; L iomlán=14.521 km.-de réir comhpháirte Tá sé beartaithe fuíolluisce a bhailiú: •Atógáil cuid de Mháistir-Bhailitheoir II le próifíl uibhe 1520/2400 mm agus 1120/2150 mm. Cuirfear cainéal GRP ina ionad le f1800 mm le fad L = 1.356 km agus alt PP 2x1000 mm le L =94 m agus an líne á trasnú; L iomlán = 1.450 km.- cóireáil fuíolluisce de réir comhpháirte nach bhforáiltear d’aon bhearta infheistíochta. Tá an WWTP á thógáil. (Irish)
19 July 2022
0 references
För tätorten Vidin planeras totalt följande åtgärder:-per komponent vattenförsörjning: •byte av det befintliga blyröret ph900 mm med PVC_O-rör med diametern F630mm, L = 10,372 km med PN 12,5 atm,•ersättning av de befintliga två eteritrören f536 mm och av de befintliga två stålrören f630 mm med f500 mm PVC_O-rör med PN 12,5 atm och total längd L = 4,149 km. L totalt=14,521 km.-per komponent Avloppsvattenuppsamling planeras: • Återuppbyggnad av en del av Master Collector II med en äggprofil på 1520/2400 mm och 1120/2150 mm. Den kommer att ersättas av en GRP-kanal med f1800 mm med längd L = 1,356 km och PP-avsnitt 2x1000 mm med L =94 m när linjen korsas. L totalt = 1,450 km.- per komponent för rening av avloppsvatten planeras inga investeringsåtgärder. Avloppsreningsverket är under uppbyggnad. (Swedish)
19 July 2022
0 references
Kokku on Vidini linnastu jaoks ette nähtud järgmised meetmed: •olemasoleva pliitoru ph900 mm asendamine PVC_O torudega, mille läbimõõt on F630mm, L = 10,372 km PN 12,5 atm;• olemasoleva kahe eeterliku toru f536 mm ja kahe olemasoleva terastoru f630 mm f630 mm asendamine f500 mm PVC_O torudega, mille PN 12,5 atm ja kogupikkus L = 4,49 km; L kokku=14,521 km.-osade kaupa reovee kogumine on ette nähtud: • Master Collector II osa, mille munaprofiil on 1520/2400 mm ja 1120/2150 mm, rekonstrueerimine. See asendatakse GRP kanaliga, mille pikkus on L = 1,356 mm, ja PP lõiguga 2x1000 mm ja L = 94 m joone ületamisel; L kokku = 1 450 km- komponentide kaupa reovee puhastamine ei ole investeerimismeetmeid ette nähtud. Reoveepuhasti on ehitamisel. (Estonian)
19 July 2022
0 references
гр.Видин
0 references
Identifiers
BG16M1OP002-1.016-0006
0 references