Project Q123976 in Poland
Language Label Description Also known as
English
Improving energy efficiency combined with an increase in the share of renewable energy in the City of Racibórz – stage II
Project Q123976 in Poland

    Statements

    0 references
    1,657,929.52 zloty
    0 references
    368,557.73 Euro
    13 January 2020
    0 references
    2,240,445.34 zloty
    0 references
    498,051.0 Euro
    13 January 2020
    0 references
    74.0 percent
    0 references
    20 October 2016
    0 references
    18 December 2020
    0 references
    MIASTO RACIBÓRZ
    0 references
    0 references

    50°5'25.4"N, 18°12'54.4"E
    0 references

    50°5'13.09"N, 18°12'0.29"E
    0 references
    W projekcie przewiduje się budowę instalacji paneli fotowoltaicznych, wymianę oświetlenia na oświetlenie ledowe, termomodernizację dachu oraz przebudowę systemu wentylacji i klimatyzacji, w budynku Urzędu Miasta Racibórz przy ul Króla Stefana Batorego 6 w Raciborzu. Moduły fotowoltaiczne o łącznej mocy 40 kWp i ilości 160 sztuk zostaną zainstalowane na połaci dachowej budynku Urzędu Miasta Racibórz. W ramach wymiany oświetlenia planuje się wymianę łącznie 684 sztuk opraw na oświetlenie LED. W wyniku realizacji inwestycji zapotrzebowanie na energię końcową dla budynku zmniejszy się o 26,93%. (Polish)
    0 references
    The project provides for the construction of the installation of photovoltaic panels, replacement of lighting for led lighting, thermal modernisation of the roof and reconstruction of the ventilation and air conditioning system, in the building of the Racibórz City Office at ul. Król Stefan Batory 6 in Raciborz. Photovoltaic modules with a total capacity of 40 kWp and a quantity of 160 units will be installed in the roof area of the Racibórz City Hall. As part of the lighting exchange, a total of 684 pieces of luminaires are planned to be replaced with LED lighting. As a result of the investment, the final energy demand for the building will decrease by 26.93 %. (English)
    21 October 2020
    0 references
    Le projet prévoit la construction de panneaux photovoltaïques, le remplacement de l’éclairage à LED, la modernisation thermique du toit et la reconstruction du système de ventilation et de climatisation, dans le bâtiment de l’hôtel de ville de Racibórz au 6 rue King Stefan Batory à Raciborz. Des modules photovoltaïques d’une capacité totale de 40 kWc et d’une quantité de 160 unités seront installés sur le toit du bâtiment de l’hôtel de ville de Racibórz. Dans le cadre du remplacement de l’éclairage, un total de 684 luminaires devraient être remplacés par un éclairage LED. Grâce à l’investissement, la demande finale d’énergie du bâtiment sera réduite de 26,93 %. (French)
    2 December 2021
    0 references
    Das Projekt sieht den Bau der Installation von Photovoltaikpaneelen, den Ersatz der Beleuchtung für LED-Beleuchtung, die thermische Modernisierung des Daches und die Rekonstruktion der Lüftungs- und Klimaanlagen im Gebäude des Rathauses Racibórz bei 6 König Stefan Batory Street in Raciborz vor. Auf der Dachfläche des Gebäudes des Rathauses Racibórz werden Photovoltaik-Module mit einer Gesamtkapazität von 40 kWp und einer Menge von 160 Einheiten installiert. Im Rahmen des Austauschs der Beleuchtung sollen insgesamt 684 Leuchten durch LED-Beleuchtung ersetzt werden. Durch die Investition wird der Endenergiebedarf für das Gebäude um 26,93 % gesenkt. (German)
    8 December 2021
    0 references
    Het project voorziet in de bouw van de installatie van fotovoltaïsche panelen, vervanging van verlichting voor ledverlichting, thermische modernisering van het dak en reconstructie van het ventilatie- en airconditioningsysteem, in het gebouw van het stadhuis van Racibórz op 6 Koning Stefan Batory Street in Raciborz. Fotovoltaïsche modules met een totale capaciteit van 40 kWp en een hoeveelheid van 160 eenheden zullen worden geïnstalleerd op het dak van het gebouw van het stadhuis van Racibórz. Als onderdeel van de vervanging van verlichting zijn in totaal 684 armaturen gepland om te worden vervangen door LED-verlichting. Als gevolg van de investering zal de uiteindelijke energievraag voor het gebouw met 26,93 % worden verminderd. (Dutch)
    17 December 2021
    0 references
    Il progetto prevede la realizzazione dell'installazione di pannelli fotovoltaici, la sostituzione dell'illuminazione per l'illuminazione a led, l'ammodernamento termico del tetto e la ricostruzione dell'impianto di ventilazione e condizionamento dell'aria, nell'edificio del Municipio Racibórz al 6 King Stefan Batory Street a Raciborz. I moduli fotovoltaici con una capacità totale di 40 kWp e una quantità di 160 unità saranno installati sulla superficie del tetto dell'edificio del Municipio di Racibórz. Come parte della sostituzione dell'illuminazione, un totale di 684 apparecchi sono progettati per essere sostituiti con l'illuminazione a LED. A seguito dell'investimento, la domanda finale di energia per l'edificio sarà ridotta del 26,93 %. (Italian)
    15 January 2022
    0 references
    El proyecto prevé la construcción de la instalación de paneles fotovoltaicos, sustitución de iluminación por iluminación led, modernización térmica del techo y reconstrucción del sistema de ventilación y aire acondicionado, en el edificio del Ayuntamiento de Racibórz en la calle King Stefan Batory 6 en Raciborz. Se instalarán módulos fotovoltaicos con una capacidad total de 40 kWp y una cantidad de 160 unidades en el área del techo del edificio del Ayuntamiento de Racibórz. Como parte del reemplazo de la iluminación, se planea reemplazar un total de 684 luminarias con iluminación LED. Como resultado de la inversión, la demanda final de energía para el edificio se reducirá en un 26,93 %. (Spanish)
    18 January 2022
    0 references
    Projektet omfatter opførelse af solcellepaneler, udskiftning af belysning til LED-belysning, termisk modernisering af taget og rekonstruktion af ventilations- og klimaanlægget i bygningen af rådhuset Racibórz på 6 King Stefan Batory Street i Raciborz. Fotovoltaiske moduler med en samlet kapacitet på 40 kWp og en mængde på 160 enheder vil blive installeret på tagarealet i bygningen af rådhuset Racibórz. Som en del af udskiftningen af belysning er i alt 684 armaturer planlagt til at blive udskiftet med LED-belysning. Som følge af investeringen vil den endelige energiefterspørgsel for bygningen blive reduceret med 26,93 %. (Danish)
    2 July 2022
    0 references
    Το έργο προβλέπει την κατασκευή της εγκατάστασης φωτοβολταϊκών πάνελ, την αντικατάσταση του φωτισμού για φωτισμό LED, τον θερμικό εκσυγχρονισμό της οροφής και την ανακατασκευή του συστήματος εξαερισμού και κλιματισμού, στο κτίριο του Δημαρχείου Racibórz στην οδό King Stefan Batory 6 στο Raciborz. Φωτοβολταϊκές μονάδες συνολικής ισχύος 40 kWp και ποσότητας 160 μονάδων θα εγκατασταθούν στην οροφή του κτιρίου του Δημαρχείου Racibórz. Στο πλαίσιο της αντικατάστασης του φωτισμού, προβλέπεται να αντικατασταθούν συνολικά 684 φωτιστικά με φωτισμό LED. Ως αποτέλεσμα της επένδυσης, η τελική ζήτηση ενέργειας για το κτίριο θα μειωθεί κατά 26,93 %. (Greek)
    2 July 2022
    0 references
    Projekt predviđa izgradnju instalacije fotonaponskih panela, zamjenu rasvjete za LED rasvjetu, toplinsku modernizaciju krova i rekonstrukciju sustava ventilacije i klimatizacije, u zgradi Gradske vijećnice Racibórz u ulici kralja Stefana Batorya u Raciborzu. Na krovni dio zgrade Gradske vijećnice Racibórz bit će instalirani fotonaponski moduli ukupnog kapaciteta 40 kWp i količine od 160 jedinica. Kao dio zamjene rasvjete, ukupno 684 rasvjetnih tijela planira se zamijeniti LED rasvjetom. Kao rezultat ulaganja, konačna potražnja za energijom za zgradu smanjit će se za 26,93 %. (Croatian)
    2 July 2022
    0 references
    Proiectul prevede construirea de panouri fotovoltaice, înlocuirea iluminatului pentru iluminatul condus, modernizarea termică a acoperișului și reconstrucția sistemului de ventilație și aer condiționat, în clădirea Primăriei Racibórz de pe strada Regele Ștefan Batory 6 din Raciborz. Modulele fotovoltaice cu o capacitate totală de 40 kWp și o cantitate de 160 de unități vor fi instalate pe suprafața acoperișului clădirii Primăriei Racibórz. Ca parte a înlocuirii iluminatului, un total de 684 de corpuri de iluminat sunt planificate să fie înlocuite cu iluminat cu LED-uri. Ca urmare a investiției, cererea finală de energie pentru clădire va fi redusă cu 26,93 %. (Romanian)
    2 July 2022
    0 references
    Projekt predpokladá výstavbu inštalácie fotovoltaických panelov, výmenu osvetlenia za LED osvetlenie, tepelnú modernizáciu strechy a rekonštrukciu ventilačného a klimatizačného systému v budove radnice Racibórz na ulici 6 King Stefan Batory v Raciborzi. Fotovoltaické moduly s celkovým výkonom 40 kWp a počtom 160 jednotiek budú inštalované na streche budovy radnice Racibórz. Ako súčasť výmeny osvetlenia sa plánuje nahradiť celkom 684 svietidiel za LED osvetlenie. V dôsledku tejto investície sa konečný dopyt po energii v budove zníži o 26,93 %. (Slovak)
    2 July 2022
    0 references
    Il-proġett jipprevedi l-kostruzzjoni tal-installazzjoni ta’ pannelli fotovoltajċi, is-sostituzzjoni tad-dawl għal dawl immexxi, il-modernizzazzjoni termali tas-saqaf u r-rikostruzzjoni tas-sistema ta’ ventilazzjoni u arja kondizzjonata, fil-bini tal-City Hall ta’ Racibórz f’6 King Stefan Batory Street f’Raciborz. Moduli fotovoltajċi b’kapaċità totali ta’ 40 kWp u kwantità ta’ 160 unità se jiġu installati fuq iż-żona tas-saqaf tal-bini tal-City Hall ta’ Racibórz. Bħala parti mis-sostituzzjoni tat-tidwil, huwa ppjanat li total ta’ 684 unità ta’ tidwil jiġu sostitwiti b’tidwil LED. Bħala riżultat tal-investiment, id-domanda finali għall-enerġija għall-bini se titnaqqas b’26.93 %. (Maltese)
    2 July 2022
    0 references
    O projeto prevê a construção da instalação de painéis fotovoltaicos, substituição da iluminação para iluminação led, modernização térmica do telhado e reconstrução do sistema de ventilação e ar condicionado, no edifício da Prefeitura de Racibórz, na Rua 6 Rei Stefan Batory, em Raciborz. Módulos fotovoltaicos com uma capacidade total de 40 kWp e uma quantidade de 160 unidades serão instalados na área do telhado do edifício da Prefeitura de Racibórz. Como parte da substituição da iluminação, um total de 684 luminárias está planejado para ser substituído por iluminação LED. Como resultado do investimento, a procura final de energia para o edifício será reduzida em 26,93 %. (Portuguese)
    2 July 2022
    0 references
    Hankkeessa suunnitellaan aurinkosähköpaneelien asentamista, valaistuksen korvaamista led-valaistusta varten, katon lämpöuudistusta sekä ilmanvaihto- ja ilmastointijärjestelmän rekonstruktiota Racibórzin kaupungintalon rakennuksiin osoitteessa 6 King Stefan Batory Street Raciborzissa. Racibórzin kaupungintalon katolle asennetaan aurinkosähkömoduulit, joiden kokonaiskapasiteetti on 40 kWp ja määrä 160 yksikköä. Osana valaisimien korvaamista suunnitteilla on yhteensä 684 valaisinta, jotka on tarkoitus korvata LED-valaistuksella. Investoinnin seurauksena rakennuksen energian loppukysyntä vähenee 26,93 prosenttia. (Finnish)
    2 July 2022
    0 references
    Projekt predvideva gradnjo montaže fotonapetostnih panelov, zamenjavo razsvetljave za LED osvetlitev, toplotno posodobitev strehe in rekonstrukcijo prezračevalnega in klimatskega sistema v stavbi mestne hiše Racibórz na ulici King Stefan Batory 6 v Raciborzu. Fotonapetostni moduli s skupno zmogljivostjo 40 kWp in količino 160 enot bodo nameščeni na strešni površini stavbe mestne hiše Racibórz. Kot del zamenjave razsvetljave je načrtovano, da se skupaj 684 svetilk nadomesti z LED osvetlitvijo. Zaradi investicije se bo končno povpraševanje po energiji v stavbi zmanjšalo za 26,93 %. (Slovenian)
    2 July 2022
    0 references
    Projekt předpokládá výstavbu fotovoltaických panelů, výměnu osvětlení za LED osvětlení, tepelnou modernizaci střechy a rekonstrukci větracího a klimatizačního systému, v budově radnice Racibórz na 6 King Stefan Batory Street v Raciborz. Fotovoltaické moduly o celkové kapacitě 40 kWp a množství 160 jednotek budou instalovány na střeše budovy radnice Racibórz. V rámci výměny osvětlení se plánuje nahradit celkem 684 svítidel LED osvětlením. V důsledku investice se konečná energetická náročnost budovy sníží o 26,93 %. (Czech)
    2 July 2022
    0 references
    Projekte numatyta įrengti fotovoltines plokštes, pakeisti LED apšvietimą, modernizuoti stogą ir rekonstruoti vėdinimo ir oro kondicionavimo sistemą Raciborz miesto rotušės pastate 6 Karaliaus Stefano Batory gatvės Raciborce. Racibórz rotušės pastato stogo zonoje bus sumontuoti 40 kWp ir 160 vienetų kiekio fotovoltiniai moduliai. Keičiant apšvietimą, iš viso 684 šviestuvai turėtų būti pakeisti LED apšvietimu. Dėl investicijų galutinis pastato energijos poreikis sumažės 26,93 %. (Lithuanian)
    2 July 2022
    0 references
    Projekts paredz fotoelementu paneļu uzstādīšanu, apgaismojuma nomaiņu LED apgaismojumam, jumta siltuma modernizāciju un ventilācijas un gaisa kondicionēšanas sistēmas rekonstrukciju Racibórz rātsnama ēkā, King Stefan Batory ielā 6 Raciborz. Racibórz pilsētas ēkas jumta zonā tiks uzstādīti fotoelektriskie moduļi ar kopējo jaudu 40 kWp un 160 vienību skaitu. Kā daļu no apgaismojuma nomaiņas ir plānots, ka kopumā 684 gaismekļi tiks aizstāti ar LED apgaismojumu. Investīciju rezultātā ēkas galīgais enerģijas pieprasījums tiks samazināts par 26,93 %. (Latvian)
    2 July 2022
    0 references
    Проектът предвижда изграждане на монтаж на фотоволтаични панели, подмяна на осветлението за осветителни тела, термична модернизация на покрива и реконструкция на вентилационната и климатична система, в сградата на кметство Рачиборц на улица Кинг Стефан Батор 6 в Рачиборц. Фотоволтаични модули с общ капацитет от 40 kWp и количество 160 единици ще бъдат инсталирани на покривната площ на сградата на кметството на Рачиборц. Като част от подмяната на осветлението се планира да бъдат заменени общо 684 осветителни тела с LED осветление. В резултат на инвестицията крайното потребление на енергия за сградата ще бъде намалено с 26,93 %. (Bulgarian)
    2 July 2022
    0 references
    A projekt a fotovoltaikus panelek telepítését, a led világítás cseréjét, a tető hőkorszerűsítését, valamint a szellőztető és légkondicionáló rendszer rekonstrukcióját irányozza elő a Racibórz Városháza épületében, a raciborzi király Stefan Batory utca 6. szám alatt. A Racibórz Városháza épületének tetőterén 40 kWp összkapacitású és 160 darabos fotovoltaikus modulok kerülnek telepítésre. A világítás cseréjének részeként összesen 684 lámpatestet terveznek LED-es világítással helyettesíteni. A beruházás eredményeként az épület végső energiaigénye 26,93%-kal csökken. (Hungarian)
    2 July 2022
    0 references
    Foráiltear sa tionscadal go dtógfar suiteáil na bpainéal fótavoltach, go gcuirfear soilsiú nua in ionad soilsiú faoi stiúir, nuachóiriú teirmeach ar dhíon agus atógáil an chórais aerála agus aerchóirithe, i bhfoirgneamh Halla Cathrach Racibórz ag 6 King Stefan Batory Street i Raciborz. Suiteálfar modúil fhótavoltacha le toilleadh iomlán de 40 kWp agus 160 aonad ar limistéar dín fhoirgneamh Halla Cathrach Racibórz. Mar chuid d’athsholáthar soilsiú, tá sé beartaithe soilsiú LED a chur in ionad 684 luminaires. Mar thoradh ar an infheistíocht, laghdófar an t-éileamh deiridh fuinnimh ar an bhfoirgneamh faoi 26.93 %. (Irish)
    2 July 2022
    0 references
    I projektet planeras installation av solcellspaneler, byte av belysning för led-belysning, modernisering av taket och rekonstruktion av ventilations- och luftkonditioneringssystemet, i byggnaden av Racibórz stadshus på 6 King Stefan Batory Street i Raciborz. Solcellsmoduler med en total kapacitet på 40 kWp och en kvantitet på 160 enheter kommer att installeras på taket i byggnaden av Racibórz stadshus. Som en del av bytet av belysning planeras totalt 684 armaturer bytas ut mot LED-belysning. Som ett resultat av investeringen kommer det slutliga energibehovet för byggnaden att minska med 26,93 %. (Swedish)
    2 July 2022
    0 references
    Projekt näeb ette fotogalvaaniliste paneelide paigaldamise, LED-valgustuse väljavahetamise, katuse termilise moderniseerimise ning ventilatsiooni- ja kliimasüsteemi rekonstrueerimise Racibórzi raekoja hoones aadressil 6 King Stefan Batory Street Raciborzis. Racibórzi raekoja hoone katusealale paigaldatakse fotogalvaanilised moodulid koguvõimsusega 40 kWp ja 160 ühikut. Valgustuse asendamise raames on kavas asendada LED-valgustusega kokku 684 valgustit. Investeeringu tulemusena väheneb hoone lõppenergianõudlus 26,93 %. (Estonian)
    2 July 2022
    0 references
    WOJ.: ŚLĄSKIE, POW.: raciborski
    0 references
    13 December 2023
    0 references

    Identifiers

    RPSL.04.03.02-24-0486/17
    0 references