Reconstruction, extension and superstructure of the Team of Schools No 1 at the Stobierna Primary and Gymnasium along with the accompanying technical infrastructure (Q119287)

From EU Knowledge Graph
Revision as of 19:26, 10 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Reconstruction, extension and superstructure of the Team of Schools No 1 at the Stobierna Primary and Gymnasium along with the accompanying technical infrastructure
Project in Poland financed by DG Regio

    Statements

    0 references
    569,200.25 zloty
    0 references
    136,608.06 Euro
    13 January 2020
    0 references
    1,509,562.62 zloty
    0 references
    362,295.02880000003 Euro
    13 January 2020
    0 references
    66.67 percent
    0 references
    14 June 2016
    0 references
    30 March 2018
    0 references
    GMINA TRZEBOWNISKO
    0 references
    Przedmiotem projektu jest rozbudowa, przebudowa i nadbudowa Zespołu Szkół nr 1 w Stobiernej. Polega ona na przebudowie istniejącej szkoły w związku z koniecznością spełnienia obowiązujących przepisów w zakresie wymagań dotyczących kuchni, jadalni, sanitariatów, instalacji elektrycznych niskoprądowych w tym światłowodowych, remontu pomieszczeń i doposażenia w sprzęt. Obejmuje swoim zakresem: • rozbudowę budynku o nową część: pokój nauczycielski, pokój dyrektora, cztery sale lekcyjne, sklepik szkolny i bibliotekę; • nadbudowę budynku (piętro); • wyposażenie sal szkolnych. Obecnie brakuje odpowiedniego zaplecza, rozdzielenia części szkolnej i przedszkolnej. W wyniku oddzielenia części szkolnej i jej rozbudowy uczniowie zyskają dodatkowe sale lekcyjne, bibliotekę, sklepik i sanitariaty. Sala gimnastyczna zostanie rozbudowana o magazyn sportowy Kadra pedagogiczna dostanie nowe pomieszczenia socjalne. Wpłynie to pozytywnie na rozwój i możliwość uczenia się uczniów, zostaną wyrównane szanse edukacyjne pomiędzy dziećmi mieszkającymi na terenie wiejskiej Gminy Trzebownisko, z dziećmi zamieszkującymi tereny miejskie. Kolejnym celem projektu jest przebudowa istniejącej kuchni w celu oddzielenia części brudnej od czystej i powiększenie tej części o wymaganą powierzchnię oraz przebudowa jadalni do wymaganej przepisami powierzchni. Obecnie infrastruktura szkoły nie jest w pełni dostosowana do potrzeb dzieci i uczniów: zły stan techniczny części budynku m.in. kuchni, stołówki brak dostosowania ich do wymogów sanepidu, przepisów przeciwpożarowych. Szkoła nie jest dostosowana do potrzeb uczniów niepełnosprawnych. Aby sprostać nowemu rozporządzeniu w sprawie grup środków spożywczych przeznaczonych do sprzedaży dzieciom i młodzieży w jednostkach systemu oświaty oraz wymagań, jakie muszą spełniać środki spożywcze stosowane w ramach żywienia zbiorowego w tych jednostkach kuchnia musi być wyposażona w różnorodny sprzęt pozwalający przygotowywać posiłki zgodnie z w/w normami. (Polish)
    0 references
    The project consists of the extension, renovation and overbuilding of the Team of School No 1 at the Stobierna Stobierna. It consists of redeveloping the existing school in view of the need to comply with existing legislation on requirements for kitchens, dining, sanitation, low-current electrical installations including fibre optics, renovation of premises and equipment. It covers: • Extension of the building to a new part: teaching room, room director, four classrooms, school shop and library; • building superstructure (floor); • the equipment of the school classrooms. Currently, there is a lack of adequate facilities, separation of school and pre-school components. As a result of the separation of the school part and its extension, students will gain additional classrooms, libraries, shops and lavatories. The gym will be extended to include a new social housing. This will have a positive impact on students’ development and learning opportunities, and there will be a level playing field between children living in a rural community, with children living in urban areas. Another objective of the project is to rebuild the existing kitchen in order to separate the dirty part from the clean and to extend this part to the required surface area and to rebuild the enclosure to the required surface area. At present, school infrastructure is not fully adapted to the needs of children and pupils: the poor technical condition of the part of the building, including the kitchen, the canteens, is not adapted to the requirements of sanepid, and for fire regulations. The school is not adapted to the needs of students with disabilities. In order to meet the new regulation on groups of foodstuffs intended for the sale of children and young people to units of the educational system and the requirements to be met by foodstuffs used in mass catering in these units, the food must be equipped with a variety of equipment to prepare meals in accordance with the standards. (English)
    0 references

    Identifiers

    RPPK.06.04.03-18-0024/16
    0 references