RES investments in the company COWIK in Bartoszyce (Q132014)

From EU Knowledge Graph
Revision as of 23:30, 10 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
RES investments in the company COWIK in Bartoszyce
Project in Poland financed by DG Regio

    Statements

    0 references
    516,910.57 zloty
    0 references
    124,058.5368 Euro
    13 January 2020
    0 references
    748,000.0 zloty
    0 references
    179,520.0 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    3 October 2016
    0 references
    31 March 2019
    0 references
    WODOCIAGOWO-CIEPŁOWNICZA SPÓŁKA Z OGRANICZONA ODPOWIEDZIALNOSCIA "COWIK" W BARTOSZYCACH
    0 references
    0 references

    54°15'20.9"N, 20°48'24.5"E
    0 references
    Przedmiotem projektu jest budowa instalacji fotowoltaicznych zlokalizowanej Gminie Miasto Bartoszyce (działa 12/3 w obrębie ewidencyjnym Bartoszyce). Instalacja gruntowe wybudowane w oparciu o panele polimorficzne, fotowoltaiczne Projektowana instalacja fotowoltaiczna o łącznej mocy zainstalowanej 99,90kWp w panelach fotowoltaicznych, posadowiona na gruncie. W skład danej instalacji będzie wchodzić 333 szt. paneli fotowoltaicznych 300W oraz 4 szt. Inwertera 25 kW. Sposób wdrażania: projekt wdrażany będzie samodzielnie przez Wnioskodawcę. Etapy realizacji projektu: -złożenie wniosku o dof. -podpisanie umowy o dof. -wybór wykonawcy zgodnie z zasadą pzp. -zawarcie umowy z wykonawcą i rozpoczęcie prac -realizacja prac zgodnie z założonym harm. -zakończenie projektu i podpisanie protokołu końcowego -końcowe rozliczenie projektu Projekt wpisuje się w założenia wpisane w SzOOP RPOWiM realizując założony cel: Zwiększony udział OZE w ogólnym bilansie energetycznym regionu. Realizacja poddziałania pozwoli na zwiększenie udziału energii odnawialnej w bilansie energ. przedsiębiorstwa, co wpłynie na zwiększenie udziału energii odnawialnej w bilansie energ. Regionu. Wpłynie to na ograniczenie emisji szkodliwych gazów i pyłów do atmosfery oraz dzięki wykorzystaniu lokalnych źródeł energii odnawialnej zwiększy konkurencyjność firmy. W wyniku realizacji inwestycji spadną koszty związane z zużyciem energii. (Polish)
    0 references
    The project consists of the construction of a photovoltaic installation located in the municipality of Bartoszyce (12/3 on Bartoszyce). Outdoor installation constructed on the basis of polymorphic panels, solar photovoltaic design installation with the total installed capacity of 99,90kWp in photovoltaic panels, on the ground. The installation will consist of 333 PV panels of 300 W and 4 units. Inverter 25 kW. Method of implementation: the project will be implemented by the Applicant on its own. The phases of the implementation of the project: — the request for the DOF. Signature of the contract for the DOF. Selection of contractor in accordance with the pzp rule. Conclusion of the contract with the contractor and start of works to be carried out in line with the established reality. — Completion of the project and signature of the final protocol -final statement of project final statement of project (s) shall be part of the assumed objective of the project: Increased RES share in the region’s overall energy balance. The implementation of the Sub-Action will increase the share of renewable energy in the energy balance of the company, which will increase the share of renewable energy in the energy mix. The region. This will reduce the emissions of harmful gases and dusts into the atmosphere and increase the competitiveness of the firm through the use of indigenous renewable energy sources. The costs associated with energy consumption will be reduced as a result of the investment. (English)
    0 references

    Identifiers

    RPWM.04.01.00-28-0425/16
    0 references