Improvement of the water and wastewater management system in the agglomeration of Bytom Odra (Q100393)

From EU Knowledge Graph
Revision as of 11:19, 10 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Improvement of the water and wastewater management system in the agglomeration of Bytom Odra
Project in Poland financed by DG Regio

    Statements

    0 references
    2,310,265.07 zloty
    0 references
    554,463.6168 Euro
    13 January 2020
    0 references
    3,343,190.4 zloty
    0 references
    802,365.696 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    10 January 2017
    0 references
    15 October 2018
    0 references
    GMINA BYTOM ODRZAŃSKI
    0 references

    51°43'50.9"N, 15°49'36.8"E
    0 references
    Proj. polega na realiz. działań wspierających gospodarkę wodno-ściekowej. Przedmiot. proj. jest przebudowa oczyszczalni ścieków w Bytomiu Odrz.; remont budynku socjal. i budynku techn.; likwidacja istniejących zużytych techn. obiektów, w tym demontaż kraty koszowej, sita spiralnego, demontaż 4 poletek osadu, zlewni ścieków dowożonych; budowa sieci kanalizacji sanitarnej w rej. ul. Pszenicznej i Żytniej w m. Bytom Odrz. na odcinku 877m; budowa sieci wodociąg. w rej. ul. Pszenicznej i Żytniej w m. Bytom Odrz. o dł. 543,29 m oraz budowa mikroinstalacji fotowoltaicznych w Tarnowie Byckim. Gr. docelowe: Mieszkańcy Aglomeracji Bytom Odrz. Mieszkańcy Gminy Bytom Odrz. i Pow. Nowosolskiego Władze Gminy Bytom Odrz. Gł. celem proj. jest poprawa dostępu do dobrej jakości infrastrukt. wodociągowo-kanalizacyjnej na obszarze Gminy Bytom Odrz. Zdefin. cel gł. oraz cele szczegół. Odp. na problemy zdefin. w wyniku analizy problemów. Do celów szczegół., ściśle powiązanych z celem gł. należą: Poprawa dostępu mieszkańców Aglomeracji Bytom Odrz. do infrastrukt. wodociąg., poprzez budowę 543,29 m wodociągu. Poprawa dostępu mieszkańców Aglom. Bytom Odrz. do infrastrukt. kanaliz., poprzez modernizację oczyszczalni ścieków oraz budowę 877 m kanalizacji sanitarnej. Zwiększ. liczby RLM przyłączonych do sieci w Aglom. Bytom Odrz. o31 RLM Wskaźniki produktu: Dł. sieci kanaliz. sanit. (km) – 0,877 Dł. wybudow. Kanaliz. sanit. (km) – 0,877 Dł. wybudow. sieci wodociąg. (km) – 0, 5432 L. przebudow. oczyszczalni ścieków komunalnych (szt.) – 1 L. wyremont. oczyszczalni ścieków komunalnych (szt.) – 1 Wskaźniki rezultatu: L. dodatk. os. korzyst. z ulepszonego oczyszczania ścieków (CI 19) (RLM)- 31; L. dodatk. os. korzyst. z ulepszonego zaopatrzenia w wodę (CI 18) (osoby) – 35; Przewidyw. l. os. korzyst. z ulepszonego oczyszczania ścieków (RLM) – 4469 Wielkość ładunku ścieków poddanych ulepsz. oczyszczaniu (RLM) – 4469 Wzrost zatrudnienia we wspieranych podmiotach (innych niż prze (Polish)
    0 references
    In order to support water and wastewater management. The purpose of the document is the reconstruction of the wastewater treatment plant in Bytomiu Oderz. renovation of the socialist building and technical building; the decommissioning of existing waste facilities, including the dismantling of the costume, the spiced sieve, the dismantling of 4 sediment liners, the catchment area of the feeder waste water; construction of a sewerage network in ul. W = 877 m; construction of water supply networks. Common wheat 543.29 m and the construction of a micro-installation in Taranto. GR. target: Inhabitants of the inhabitants of the Byvolume Reskz agglomeration. The residents of the Municipality of Bytom Odke and Pow. Nowolosal. The objective is to improve access to good quality infrastructure. Objectives of the heading and objectives. For problems in the wake of the problem analysis. For specific purposes, closely related to the head objective: Improving the accessibility of the people of the inhabitants of the agglomeration of the Bytom River to the infrastructure, by means of the construction of 543.29 m of water supply. To improve the access of the inhabitants of Agrom. Waste water treatment plants and the construction of 877 m of the sewage system. Number of p.e. connected to the network. For the purposes of this Regulation, the following definitions shall apply: The length of the research network has been drawn up. (km) — 0,877 Length of explosions. Kanalisite. (km) — 0,877 Moreover, the construction of the water mains network. (km) — 0, 5432 L. conversion of urban waste water treatment plants (items) to 1 L. urban waste water treatment plants (items) — 1 Result indicators: With improved treatment of waste water (CI 19) (p.e.) — 31; Positive water supply (CI 18) (persons) — 35; Use of improved treatment of waste water (p.e.) — 4469 Waste water load conditioned by an improvement (p.e.) — 4469 (English)
    0 references

    Identifiers

    RPLB.04.03.00-08-0008/17
    0 references