Construction of a pressure sanitary collector from the municipality of Gostycyn into a sewage system for the city and municipality of Tuchula implemented in two stages (Q98438)

From EU Knowledge Graph
Revision as of 07:31, 10 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of a pressure sanitary collector from the municipality of Gostycyn into a sewage system for the city and municipality of Tuchula implemented in two stages
Project in Poland financed by DG Regio

    Statements

    0 references
    2,133,024.82 zloty
    0 references
    511,925.9567999999 Euro
    13 January 2020
    0 references
    3,163,565.68 zloty
    0 references
    759,255.7632 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    10 August 2015
    0 references
    31 December 2016
    0 references
    PRZEDSIĘBIORSTWO USŁUGOWO-HANDLOWE "KAMIONKA" SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references
    0 references
    Przedmiotowy projekt to inwestycja liniowa polegająca na budowie kanalizacji sanitarnej tłocznej zlewni oczyszczalni ścieków w Gostycynie z przechwyceniem po drodze przewodu tłocznego (Gostycyn – Tuchola) ścieków z istniejącej przepompowni ścieków w Łyskowie. Łączna długość sieci, jaka powstanie wramach projektu to 13 km. Kolektor tłoczny przebiegać będzie od centralnej przepompowni ścieków, zlokalizowanej na terenie przewidzianej do likwidacji oczyszczalni w Gostycynie do kolektora sanitarnego w Tucholi, przebiegającego na południowym skraju miasta, po północno - wschodniej stronie rzeki Kicz, w kierunku komunalnej oczyszczalni ścieków. Na odcinku od Gostycyna do Łyskowa trasę kolektora wytyczono wzdłuż prawej strony drogi wojewódzkiej. Kolektor sanitarny na trasie z Łyskowa do granicy administracyjnej miasta Tuchola przebiegać będzie od miejsca lokalizacji istniejącej przepompowni ścieków w Łyskowie, w pasie dróg gminnych i dróg leśnych do ul. Wańkowicza w Tucholi i następnie po przejściu syfonem pod korytem rzeki Kicz zostanie podłączony do kolektora sanitarnego. Projektowana sieć kanalizacyjna wykorzystana zostanie w celu polepszenia warunków socjalno-bytowych oraz umożliwi częściową lub całkowitą likwidację oczyszczalni ścieków w Gostycynie. W ramach zadania zostanie zlikwidowana część biologicznej oczyszczalni ścieków. W celu umożliwienia dostarczenia ścieków dowożonych z nieskanalizowanych zagród gospodarskich oraz oddzielenia piasku z części ogólnospławnej w miejscowości Gostycyn zachowana zostanie część mechaniczna oczyszczalni, poprzez pozostawienie punktu zlewnego oraz piaskownika do czasu całkowitego wyeliminowania dopływu ścieków ogólnospławnych. Na terenie oczyszczalni zaprojektowano również pozostawienie jednego rowu biologicznego i zaadaptowanie go jako czasowy zbiornik ścieków w wypadku awarii kolektora tłocznego do oczyszczalni ścieków w Tucholi. Zbiornik ten będzie wykorzystywany tylko na okres usunięcia awarii. (Polish)
    0 references
    The project in question is a linear investment consisting of the construction of a sewage treatment plant in the water treatment plant in Gostycyn with interception of sewage from the existing sewage pumping station (Gostycyn — Tuchola) from the existing sewage pumping station in Łyskow. The total length of the net that the project will give up to 13 km. The compressor substation will run from a central sewage pumping station located in the area envisaged for the decommissioning of the plant in Gostycynno to the sanitary collector in Tukhoi, running on the southern edge of the city, in the north to the eastern side of the Kich, towards a municipal waste water treatment plant. On the section from Gostytin to Łykowa, the path of the drain was defined along the right hand side of the provincial road. The sanitary collector on the Łykowa route to the administrative border of the town of Tuchola will be located from the location of the existing sewage pumping station in Łyskow, a lane on municipal roads and forest roads to ul. He will be connected to the sanitary collector. The proposed sewerage system will be used to improve the welfare and subsistence conditions and to allow for a partial or complete closure of the plant waste water treatment plant in Gostyniecno. As part of the task, a part of the biological waste water treatment plant will be decommissioned. In order to allow the delivery of the waste water from the unchannelled farm pens and the separation of the sand from the combined part in the municipality of Gostycyn, the mechanical part of the treatment plant will be maintained, by leaving the catchment area and the sandbox until the complete use of the combined sewage is completely eliminated. At the plant, it was also designed to leave one biological ditch and to adapt it as the temporary reservoir in the event of the accident of the collecting system to the sewage treatment plant in Tucholli. This tank shall be used only for the duration of the failure. (English)
    0 references

    Identifiers

    RPKP.04.03.00-04-0003/16
    0 references