Construction of a 986 kW photovoltaic farm with the necessary technical infrastructure and connection to the electricity grid in the city of Porierzyn (Q137742)

From EU Knowledge Graph
Revision as of 13:22, 7 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of a 986 kW photovoltaic farm with the necessary technical infrastructure and connection to the electricity grid in the city of Porierzyn
Project in Poland financed by DG Regio

    Statements

    0 references
    1,707,433.93 zloty
    0 references
    409,784.1432 Euro
    13 January 2020
    0 references
    3,731,829.8 zloty
    0 references
    895,639.1519999999 Euro
    13 January 2020
    0 references
    80.0 percent
    0 references
    10 September 2018
    0 references
    29 March 2019
    0 references
    ALFA FRUIT SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOSCIĄ
    0 references
    Przedmiotem projektu jest budowa farmy fotowoltaicznej o mocy 0,986 MW Pomierzynie na działkach o ew. nr 88/1 i 88/3. Projekt ma charakter stacjonarny i będzie składał się z jednego etapu polegającego na budowie farmy. W ramach realizacji projektu Wnioskodawca dokona zakupu kompletnej instalacji fotowoltaicznej z niezbędnymi elementami, tj. konstrukcji do paneli, paneli oraz inwerterów. Zgodnie z aktualnym projektem planuje się zainstalowanie 3 944 sztuk paneli, każdy o mocy 250W, tj. 3960x250W=986000W. W związku z faktem, iż fotowoltaika jest relatywnie nową dziedziną, w stałym procesie rozwoju i udoskonalania, Wnioskodawca jest w stanie zagwarantować jedynie moc zainstalowaną czyli 0,986 MW jako niezmienny parametr projektowanej farmy, jednak ilość i moc poszczególnych paneli fotowoltaicznych może ulec zmianie, tak, aby suma mocy zainstalowanych paneli nie przekroczyła 0,986 MW. Wynika to ze stale trwających prac dot. zwiększenia produktywności i efektywności paneli (np. W ciągu ostatnich dwóch lat standardowy panel dostępny na rynku zmienił swój parametr określający moc z wartości 230W na 250W, nie zmieniając tym samym wymiarów panela). Ponadto w celu rozpoczęcia produkcji energii elektrycznej Wnioskodawca zaplanował niezbędne z punktu widzenia prace w obrębie infrastruktury elektrycznej, takie jak: komunikacja parku, łączność, telemechanika, stacja transformatorowo - rozdzielcza nN / SN, pozostała infrastruktura elektroenergetyczna, instalacja wewnętrzna nN - trasy kablowe, instalacja zewnętrzna SN - trasa kablowa. Projekt obejmuje też wydatki związane z budową drogi, ogrodzeniem, systemem alarmowym i monitoringiem oraz zakupem tablicy informacyjnej i pamiątkowej. W wyniku projektu Wnioskodawca rozpocznie produkcję energii elektrycznej ze słońca, dzięki czemu możliwe będzie osiągnięcie określonych w we wniosku wskaźników rezultatu. Na dzień składania wniosku pozyskano wszystkystkie niezbędne zezwolenia do rozpoczęcia inwestycji. (Polish)
    0 references
    The object of the project is the construction of a 0.986 MW Podmierzyn farm on plots No 88/1 and 88/3. The project is stationary and will consist of a single farm. As part of the project, the applicant will purchase a complete photovoltaic installation with the necessary elements, i.e. the construction of panels, panels and inverters. According to the current draft, 3 944 panels are planned to be installed each 250W; 3960x250W = 986000W In view of the fact that photovoltaics is a relatively new area in a continuous process of development and improvement, the applicant is able to guarantee only the capacity of 0.986 MW as a constant parameter of the design of the farm, but the amount and power of the different solar panels may change, so that the sum of the installed capacity of the panels does not exceed 0.986 MW. This is due to ongoing work on increasing the productivity and efficiency of the panels (e.g.: Over the last two years, the standard panel available on the market has changed its parameter defining power from 230W to 250W without changing the dimensions of the panel). In addition, in order to start the electricity production, the applicant has planned the necessary work within the electricity infrastructure, such as: communication of the park, communication, telemechanics, transformer station — NN/SN, other electricity infrastructure, internal NN installation — cable routes, external SN — cable circuit. The project also includes expenditure related to road construction, fence, alert and monitoring, and the purchase of a plaque and plaque. As a result of the project, the applicant will start producing electricity from the sun, which will make it possible to achieve the result indicators set out in the proposal. At the date of the application all the necessary approvals to the start of the investment have been acquired. (English)
    0 references

    Identifiers

    RPZP.02.10.00-32-B041/17
    0 references