Construction of a ring road. Olezyce and m. Cieaps within Provincial Road 865 Jarosław — Olezyce — Cieszyn — Bełżac (Q119046)

From EU Knowledge Graph
Revision as of 12:29, 7 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of a ring road. Olezyce and m. Cieaps within Provincial Road 865 Jarosław — Olezyce — Cieszyn — Bełżac
Project in Poland financed by DG Regio

    Statements

    0 references
    15,488,383.9 zloty
    0 references
    3,717,212.136 Euro
    13 January 2020
    0 references
    20,184,760.0 zloty
    0 references
    4,844,342.399999999 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    22 February 2016
    0 references
    31 December 2018
    0 references
    WOJEWÓDZTWO PODKARPACKIE
    0 references
    Przedmiotowa inwestycja polega na budowie obwodnicy miasta Oleszyce oraz Cieszanów w ciągu drogi wojewódzkiej nr 865 relacji Jarosław- Oleszyce - Cieszanów - Bełżec. Planowana obwodnica Oleszyc oraz Cieszanowa charakteryzować się będzie :- kategoria drogi - droga wojewódzka;- klasa drogi - G; - nośność konstrukcji nawierzchni - 115 kN/oś;- konstrukcja drogi dla kategorii ruchu - KR 4;- długość wybudowanych obwodnic - 2,355 (Oleszyce) oraz 1, 606 (Cieszanów);- droga jednojezdniowa, dwukierunkowa o nawierzchni bitumicznej;- szerokość drogi - 9,5 m (jezdnia 2x3,5, pobocze bitumiczne 2x0,5, pobocze gruntowe 2x0,75).Ponadto w ramach obwodnicy Oleszyc planuje się:- budowę dwóch małych rond wraz z odcinkami dowiązania; - budowę mostu nad rzeką Przerwa;- przebudowę istniejących odcinków DW (865, 867) na odcinku ok. 0,548 m - (0,063 Cieszanów, 0,485 Oleszyce)- przebudowę skrzyżowania z Dw 867;- budowę jednego skrzyżowania z dr. gminną;- budowę chodników;- budowę i przebudowę zjazdów publicznych i indywidualnych;- budowę nowych odcinków rowów melioracyjnych;- budowę odwodnieni drogi;- budowę przepustów;- budowę oświetlenia ulicznego;- budowę urządzeń bezpieczeństwa ruchu drogowego;- wyburzenia obiektów kolidujących z budowaną obwodnicą;W ramach obwodnicy Cieszanowa:- budowa jednego małego ronda z odcinkami dowiązania;- przebudowa 1 skrzyżowania z droga powiatową i budowa 2 skrzyżowań (z DG i Dw);- budowę chodników;- budowę i przebudowę zjazdów publicznych i indywidualnych;- budowę odwodnienia drogi;- budowę przepustów;- budowę oświetlenia ulicznego;- budowę urządzeń bezpieczeństwa ruchu drogowego;- wyburzenie obiektów kolidujących budowana obwodnicą.Realizacja przedmiotowego przedsięwzięcia ma na celu : - ograniczenie ruchu pojazdów w miejscowościach Oleszyce i Cieszanów;- skrócenie czasu przejazdu samochodów;- podwyższenie bezpieczeństwa ruchu drogowego;- polepszenie warunków ruchu;- zmniejszenie dla mieszkańców i środowiska uciążliwości spowodowanych ruchem. (Polish)
    0 references
    The investment consists in the construction of the beltway of the cities of Oleszyce and Cieszanów along voivodship road No. 865 between Jarosław-Oleszyce - Cieszanów - Bełżec. The planned Oleszyce and Cieszanów ring road will be characterized by: - ​​road category - voivodship road; - road class - G; - bearing capacity of pavement structure - 115 kN / axle; - road structure for traffic categories - KR 4; - length of bypasses built - 2,355 (Oleszyce) and 1,606 (Cieszanów); - one-way, two-way road with bituminous surface; - road width - 9.5 m (2x3.5 roadway, 2x0.5 bituminous roadside, 2x0.75 dirt roadside). In addition, the following are planned as part of the Oleszyce bypass: - construction of two small roundabouts with link sections; - construction of a bridge over the Przerwa river; - reconstruction of existing DW sections (865, 867) on a section of about 0.548 m - (0.063 Cieszanów, 0.485 Oleszyce) - reconstruction of the intersection with Dw 867; - construction of one intersection with dr. municipal; - construction of pavements; - construction and reconstruction of public and individual exits; - construction of new sections of drainage ditches; - construction of road drainage; - construction of culverts; - construction of street lighting; - construction of road safety devices; - demolition of objects colliding with the bypass being constructed ; As part of the Cieszanów ring road: - construction of one small roundabout with sections of the link; - reconstruction of one intersection with a poviat road and construction of two intersections (with DG and Dw); - construction of pavements; - construction and reconstruction of public and individual exits; - construction of drainage of the road ; - construction of culverts; - construction of street lighting; - construction of road safety devices; - demolition of colliding facilities built by the beltway. The implementation of the project is aimed at: - reduction of vehicle traffic in Oleszyce and Cieszanów; - reduction of vehicle transit time; road traffic; - improving traffic conditions; - reducing traffic nuisance for residents and the environment. (English)
    0 references

    Identifiers

    RPPK.05.01.00-18-0003/17
    0 references