Construction of cycling infrastructure in the Urban Operation Area of Zielona Gora — Municipality of Sulechów: Stage (s) of Sulechów — Bees — squash — aggregate. (Q100369)

From EU Knowledge Graph
Revision as of 10:52, 7 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of cycling infrastructure in the Urban Operation Area of Zielona Gora — Municipality of Sulechów: Stage (s) of Sulechów — Bees — squash — aggregate.
Project in Poland financed by DG Regio

    Statements

    0 references
    522,406.17 zloty
    0 references
    125,377.48079999999 Euro
    13 January 2020
    0 references
    614,595.5 zloty
    0 references
    147,502.91999999998 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    14 October 2014
    0 references
    31 October 2017
    0 references
    GMINA SULECHÓW
    0 references

    52°5'7.8"N, 15°37'33.2"E
    0 references
    Przedmiotem projektu jest budowa ścieżki rowerowej o łącznej długości 1,69 km. Przedmiotowy projekt będzie realizowany w województwie lubuskim, w powiecie zielonogórskim, w gminie miejsko – wiejskiej Sulechów, na terenie wiejskim w miejscowościach: Krężoły, Obłotne oraz Kruszyna. Celem głównym projektu jest ograniczenie niskiej emisji zanieczyszczeń z sektora transportu na terenie Gminy Sulechów i obszaru MOF Zielona Góra. Cel ten jest zgodny ze Strategią ZIT MOF Zielona Góra, tj. wysoki poziom niskiej emisji. Do celów szczegółowych należ zaliczyć ochronę stanu środowiska naturalnego na terenie gminy Sulechów (ograniczenie emisji CO2 i natężenie hałasu), stworzenie bezpiecznych warunków na drogach, zmniejszenie wykorzystania samochodów osobowych, podniesienia atrakcyjności społeczno – gospodarczej regionu, stworzenie możliwości do lepszej integracji gałęzi transportu, poprawę dostępności komunikacyjnej oraz połączenie szlaków rowerowych. W ramach przedsięwzięcia planuje się przeprowadzenie szeregu działań, które przyczynią się do prawidłowej realizacji inwestycji. Do tych działań należą: prace przygotowawcze (opracowanie dokumentacji projektowej i studium wykonalności), prace budowlane (roboty ziemne, rozebranie istniejącego pobocza drogi gminnej, ustawienie krawężników oraz obrzeży, wykonanie ścieków podchodnikowych, wykonanie nawierzchni ścieżki rowerowej oraz zjazdów, remont istniejących zjazdów na przyległe działki w ciągu ścieżki rowerowej, jako elementu niezbędnego do realizacji w związku, zagospodarowanie poboczy), promocja projektu (banery informacyjne, tablice pamiątkowe, ogłoszenia w prasie, informacje na stronie internetowej gminy Sulechów i Biuletynie Informacyjnym, spoty radiowe i inne formy promocji). Zakłada się szacowany roczny spadek emisji gazów cieplarnianych i wynosić on będzie 0,81 tony równoważnika CO2/rok. Obliczony wg. wzoru zamieszczonego w Studium Wykonalności na str.19.[...] (Polish)
    0 references
    The project involves the construction of a cycle path of 1.69 km in total. The project will be implemented in the region of Lubuskie, in the county of Zielonogórskie, in the municipality of mijsko — rural Sulechów (rural area) in the following villages: Black, mud and aggregate. The main aim of the project is to reduce the low emission of polluting emissions from the transport sector on the territory of the municipality of Sulechów and the area of the Green Góra region. This objective is in line with the ZITI Green Góra ZIT Strategy, i.e. a high level of low emissions. The specific objectives include environmental protection in the municipality of Sulechów (reduction of CO2 emissions and noise), the creation of safe conditions on the roads, a reduction in the use of passenger cars, an increase in the socio-economic attractiveness of the region, the creation of opportunities for better integration of the transport sector, improved communication accessibility and a combination of cycle routes. The project plans to carry out a number of actions that will contribute to the correct implementation of the investment. These activities include: preparatory work (preparation of project documentation and feasibility study), construction works (ground works, bringing together an existing side of the local road, setting of kerbs and circumcision, the execution of gutter lanes, construction of the cycle path and exits, the renovation of existing roads over the cycle path, as an essential element in connection, roadside management), the promotion of the project (information banners, commemorative plaques, announcements in the press, information on the website of the municipality of Sulechan and the Information Bulletin, radio spots and other forms of promotion). The estimated annual decrease in greenhouse gas emissions will be 0,81 tonnes CO2/rok equivalent. As calculated in the formula of the feasibility study on p. 19 [...] (English)
    0 references

    Identifiers

    RPLB.03.03.03-08-0001/16
    0 references