toH2_Cadaval — Hydrogen production plant
Project Q4441982 in Portugal

    Statements

    0 references
    2,306,612.7 Euro
    0 references
    2,713,662.0 Euro
    0 references
    85.0 percent
    0 references
    29 October 2021
    0 references
    28 October 2022
    0 references
    TOH2 PARTNERS, LDA
    0 references
    0 references
    0 references

    39°14'22.45"N, 9°3'43.96"W
    0 references
    A operação consiste na implementação de uma central de produção de hidrogénio localizada no Cadaval. O hidrogénio será produzido por eletrólise PEM com uma capacidade instalada de 1,743 MW de output de hidrogénio, com uma estimativa de produção anual de 246 ton/ano. A utilização previsional do hidrogénio renovável será o abastecimento ao sector dos transportes. (Portuguese)
    0 references
    De operatie bestaat uit de implementatie van een waterstofproductie-installatie in Cadaval. Waterstof zal worden geproduceerd door PEM-elektrolyse met een geïnstalleerd vermogen van 1,743 MW waterstof, met een geschatte jaarlijkse productie van 246 ton/jaar. Het geschatte gebruik van hernieuwbare waterstof zal worden geleverd aan de vervoerssector. (Dutch)
    15 November 2022
    0 references
    Verksamheten består i genomförandet av en vätgasproduktionsanläggning i Cadaval. Vätgas kommer att produceras genom PEM-elektrolys med en installerad kapacitet på 1 743 MW vätgasproduktion, med en beräknad årlig produktion på 246 ton/år. Den beräknade användningen av förnybar vätgas kommer att vara leverans till transportsektorn. (Swedish)
    15 November 2022
    0 references
    Prevádzka pozostáva z realizácie zariadenia na výrobu vodíka nachádzajúceho sa v Cadaval. Vodík sa bude vyrábať elektrolýzou PEM s inštalovaným výkonom 1 743 MW vodíkového výkonu s odhadovaným ročným výkonom 246 ton/rok. Odhadované využívanie vodíka z obnoviteľných zdrojov sa bude dodávať do odvetvia dopravy. (Slovak)
    15 November 2022
    0 references
    A művelet egy Cadaval-ban található hidrogéngyártó üzem megvalósításából áll. A hidrogént PEM elektrolízissel állítják elő, amelynek beépített kapacitása 1,743 MW hidrogénteljesítmény, a becsült éves kibocsátás 246 tonna/év. A megújuló hidrogén becsült felhasználása a közlekedési ágazat ellátását jelenti. (Hungarian)
    15 November 2022
    0 references
    Der Betrieb besteht aus der Errichtung einer Wasserstoffproduktionsanlage in Cadaval. Wasserstoff wird durch PEM-Elektrolyse mit einer installierten Leistung von 1,743 MW Wasserstoffleistung und einer geschätzten Jahresleistung von 246 Tonnen/Jahr erzeugt. Die geschätzte Nutzung von erneuerbarem Wasserstoff wird dem Verkehrssektor zur Verfügung gestellt. (German)
    15 November 2022
    0 references
    The operation consists of the implementation of a hydrogen production plant located in Cadaval. Hydrogen will be produced by PEM electrolysis with an installed capacity of 1.743 MW of hydrogen output, with an estimated annual output of 246 ton/year. The estimated use of renewable hydrogen will be supply to the transport sector. (English)
    15 November 2022
    0 references
    Operaciją sudaro vandenilio gamybos gamyklos, esančios Cadaval mieste, įdiegimas. Vandenilis bus gaminamas PEM elektrolizės būdu, kurio įrengtoji galia yra 1 743 MW, o metinis pajėgumas – 246 tonos per metus. Apskaičiuota, kad vandenilis iš atsinaujinančiųjų išteklių bus tiekiamas transporto sektoriui. (Lithuanian)
    15 November 2022
    0 references
    Darbība ietver ūdeņraža ražošanas iekārtas, kas atrodas Kadavalā, īstenošanu. Ūdeņradi ražos, izmantojot PEM elektrolīzi ar uzstādīto jaudu 1,743 MW ūdeņraža izlaides, ar aplēsto gada izlaidi 246 tonnas/gadā. Paredzamā atjaunīgā ūdeņraža izmantošana būs piegāde transporta nozarei. (Latvian)
    15 November 2022
    0 references
    Operacija vključuje vzpostavitev obrata za proizvodnjo vodika, ki se nahaja v Cadavalu. Vodik se bo proizvajal z elektrolizo PEM z inštalirano zmogljivostjo 1,743 MW izhodnega vodika, z ocenjeno letno proizvodnjo 246 ton/leto. Ocenjena uporaba obnovljivega vodika bo dobava v prometnem sektorju. (Slovenian)
    15 November 2022
    0 references
    Toiming seisneb Cadavalis asuva vesinikutootmisjaama rajamises. Vesinikku toodetakse PEM-elektrolüüsiga, mille installeeritud võimsus on 1 743 MW vesinikutoodangust ja mille hinnanguline aastane toodang on 246 tonni aastas. Taastuvallikatest toodetud vesiniku hinnanguline kasutamine varustatakse transpordisektoriga. (Estonian)
    15 November 2022
    0 references
    Toiminta koostuu Cadavalissa sijaitsevan vedyn tuotantolaitoksen toteuttamisesta. Vetyä tuotetaan PEM-elektrolyysillä, jonka asennettu kapasiteetti on 1 743 MW vetytehoa ja jonka arvioitu vuosituotanto on 246 tonnia vuodessa. Uusiutuvan vedyn arvioitu käyttö on toimitusta liikennealalle. (Finnish)
    15 November 2022
    0 references
    L’opération consiste en la mise en place d’une usine de production d’hydrogène située à Cadaval. L’hydrogène sera produit par électrolyse PEM d’une capacité installée de 1 743 MW de production d’hydrogène, avec une production annuelle estimée à 246 tonnes/an. L’utilisation estimée de l’hydrogène renouvelable sera fournie au secteur des transports. (French)
    15 November 2022
    0 references
    La operación consiste en la implementación de una planta de producción de hidrógeno ubicada en Cadaval. El hidrógeno será producido por electrólisis PEM con una capacidad instalada de 1,743 MW de potencia de hidrógeno, con una producción anual estimada de 246 toneladas/año. El uso estimado de hidrógeno renovable será abastecido al sector del transporte. (Spanish)
    15 November 2022
    0 references
    Operacja polega na wdrożeniu zakładu produkcyjnego wodoru zlokalizowanego w Cadaval. Wodór będzie wytwarzany przez elektrolizę PEM o mocy zainstalowanej 1,743 MW wodoru, przy szacowanej rocznej produkcji 246 ton rocznie. Szacunkowe wykorzystanie wodoru odnawialnego będzie stanowić dostawy dla sektora transportu. (Polish)
    15 November 2022
    0 references
    Operationen består i gennemførelse af et brintproduktionsanlæg i Cadaval. Brint vil blive produceret ved PEM-elektrolyse med en installeret kapacitet på 1,743 MW brintproduktion med en anslået årlig produktion på 246 ton/år. Den anslåede anvendelse af vedvarende brint vil blive leveret til transportsektoren. (Danish)
    15 November 2022
    0 references
    Provoz spočívá v realizaci zařízení na výrobu vodíku umístěného v Cadavalu. Vodík bude vyráběn elektrolýzou PEM s instalovaným výkonem 1 743 MW vodíku s odhadovaným ročním výkonem 246 tun/rok. Odhadované využití vodíku z obnovitelných zdrojů bude dodáváno do odvětví dopravy. (Czech)
    15 November 2022
    0 references
    L-operazzjoni tikkonsisti fl-implimentazzjoni ta’ impjant tal-produzzjoni tal-idroġenu li jinsab f’Cadaval. L-idroġenu se jiġi prodott permezz tal-elettroliżi PEM b’kapaċità installata ta’ 1.743 MW ta’ produzzjoni tal-idroġenu, bi produzzjoni annwali stmata ta’ 246 tunnellata fis-sena. L-użu stmat tal-idroġenu rinnovabbli se jkun il-provvista tas-settur tat-trasport. (Maltese)
    15 November 2022
    0 references
    Операцията се състои в изграждането на завод за производство на водород, разположен в Кадавал. Водородът ще се произвежда чрез PEM електролиза с инсталирана мощност от 1 743 MW производство на водород, с прогнозна годишна мощност от 246 тона/година. Очакваното използване на водород от възобновяеми източници ще бъде доставено за транспортния сектор. (Bulgarian)
    15 November 2022
    0 references
    Operacija se sastoji od uvođenja postrojenja za proizvodnju vodika smještenog u Kadalvalu. Vodik će se proizvoditi pomoću PEM elektrolize s instaliranim kapacitetom od 1,743 MW proizvodnje vodika, s procijenjenom godišnjom proizvodnjom od 246 tona godišnje. Procijenjena uporaba vodika iz obnovljivih izvora bit će opskrba prometnog sektora. (Croatian)
    15 November 2022
    0 references
    Operațiunea constă în implementarea unei instalații de producere a hidrogenului situată în Cadaval. Hidrogenul va fi produs prin electroliză PEM cu o capacitate instalată de 1,743 MW de ieșire a hidrogenului, cu o producție anuală estimată de 246 tone/an. Utilizarea estimată a hidrogenului din surse regenerabile va fi furnizată sectorului transporturilor. (Romanian)
    15 November 2022
    0 references
    L'operazione consiste nella realizzazione di un impianto di produzione di idrogeno situato a Cadaval. L'idrogeno sarà prodotto da elettrolisi PEM con una capacità installata di 1,743 MW di potenza di idrogeno, con una produzione annua stimata di 246 tonnellate/anno. L'uso stimato di idrogeno rinnovabile sarà fornito al settore dei trasporti. (Italian)
    15 November 2022
    0 references
    Η λειτουργία συνίσταται στην υλοποίηση μονάδας παραγωγής υδρογόνου που βρίσκεται στο Cadaval. Το υδρογόνο θα παράγεται με ηλεκτρόλυση PEM με εγκατεστημένη ισχύ 1,743 MW παραγωγής υδρογόνου, με εκτιμώμενη ετήσια παραγωγή 246 τόνων/έτος. Η εκτιμώμενη χρήση υδρογόνου από ανανεώσιμες πηγές θα τροφοδοτήσει τον τομέα των μεταφορών. (Greek)
    15 November 2022
    0 references
    Is éard atá i gceist leis an oibríocht ná gléasra táirgthe hidrigine atá suite in Cadaval a chur chun feidhme. Déanfar hidrigin a tháirgeadh trí leictrealú PEM le toilleadh suiteáilte 1.743 MW d’aschur hidrigine, le haschur bliantúil measta 246 tonna in aghaidh na bliana. Is í an úsáid a mheastar a bhainfear as hidrigin inathnuaite a sholáthrófar d’earnáil an iompair. (Irish)
    5 December 2022
    0 references
    Cadaval
    0 references

    Identifiers

    POSEUR-01-1001-FC-000036
    0 references