Křikram cycle path — Lithovka (m.) (Q74639)

From EU Knowledge Graph
Revision as of 17:49, 7 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Křikram cycle path — Lithovka (m.)
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    20,249,021.66 Czech koruna
    0 references
    809,960.8664 Euro
    10 January 2020
    0 references
    23,822,378.43 Czech koruna
    0 references
    952,895.1372 Euro
    10 January 2020
    0 references
    85.0 percent
    0 references
    1 August 2016
    0 references
    27 September 2019
    0 references
    Město Kuřim
    0 references
    0 references

    49°17'37.21"N, 16°31'46.92"E
    0 references
    66434
    0 references
    Předmětem projektu je vybudování cyklostezky mezi městem Kuřim a obcí Lipůvka, zejména ve vazbě na zvýšení bezpečnosti dopravy v rizikovém úseku zatíženém frekventovanou dopravou. Navržená cyklostezka bude navazovat na stávající síť. Stezku budou využívat převážně obyvatelé Kuřimi a Lipůvky dojíždějící za prací do Kuřimské průmyslové zóny, službami (poliklinika, obchody, autobusové nádraží,...) a vzděláním. (Czech)
    0 references
    The purpose of the project is to build a cycle path between the town of Kuřim and the municipality of Lizemeck, in particular in relation to the increase in traffic safety in the risk zone loaded with freight traffic. The proposed cycle path will be linked to the existing network. The footpaths will mainly be used by the people of Kuřimi and the Lifts who travel to the Kuřimsk industrial site, services (clinics, shops, bus stations, etc.) and education. (English)
    0 references

    Identifiers

    CZ.06.1.37/0.0/0.0/16_045/0003955
    0 references