Improving the quality of the public space of the Building School Complex in Brzeg through the construction of a public multifunctional field. (Q4428497)

From EU Knowledge Graph
Revision as of 13:31, 22 October 2022 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in en, and other parts: Adding translation)
Jump to navigation Jump to search
Project Q4428497 in Poland
Language Label Description Also known as
English
Improving the quality of the public space of the Building School Complex in Brzeg through the construction of a public multifunctional field.
Project Q4428497 in Poland

    Statements

    0 references
    299,996.36 zloty
    0 references
    66,689.19 Euro
    0 references
    901,431.36 zloty
    0 references
    200,388.19 Euro
    0 references
    33.28 percent
    0 references
    15 June 2021
    0 references
    30 June 2023
    0 references
    POWIAT BRZESKI
    0 references
    0 references
    Przedmiotem rzeczowej realizacji projektu jest budowa ogólnodostępnego boiska wielofunkcyjnego ze sztucznej nawierzchni do gry w piłkę nożną mini, ręczną, siatkową, koszykówkę, tenis ziemny wraz z wyposażeniem (bramki oraz słupki do gry w piłkę siatkową, koszykówkę i tenis) oraz ogrodzeniem i zamontowaniem piłkochwytów. Boisko zlokalizowane zostanie na terenie Zespołu Szkół Budowlanych w Brzegu, na terenie zielonym szkoły za budynkiem „C” szkoły. Ze względu na istniejący spadek w kierunku północno-wschodnim, niezbędna jest rewitalizacja przestrzeni obejmująca niwelację terenu i wypoziomowanie obszaru wraz z wykonaniem odwodnienia liniowego oraz drenażu. Zakres rzeczowy obejmuje prace przygotowawcze zdegradowanego terenu i jego zdrenowanie oraz związane z budową boiska wykonanie nawierzchni poliuretanowej wraz z wyposażeniem każdego z boisk o niezbędne elementy użytkowe, wykonanie obrzeży, ogrodzenie podstawowe, ogrodzenie piłkochwytami, zagospodarowanie terenu wokół, poprzez wykonanie ciągów pieszych, obsianie trawy oraz posadowienie obiektów małej architektury jak ławki i kosze. Boisko będzie obiektem dostosowanym do potrzeb osób niepełnosprawnych. Całkowita powierzchnia terenu objęta projektem wynosi 2664 m2, który to teren w całości znajduje się na obszarze objętym rewitalizacją (0,27 ha powierzchni, 100% obszaru projektu znajduje się na terenie objętym programem rewitalizacji oraz 1 obiekt infrastruktury zlokalizowany na rewitalizowanym obszarze). Dla projektu zostanie zapewniony nadzór inwestorski oraz promocja projektu. Wykonana została dokumentacja projektowo-kosztorysowa oraz studium wykonalności inwestycji projektu. (Polish)
    0 references
    The subject of the project is the construction of a public multi-purpose field with artificial surfaces for playing mini, handball, volleyball, basketball, lawn tennis with equipment (gates and posts for playing volleyball, basketball and tennis) as well as fence and installation of ball grips. The pitch will be located in the Building School Complex in Brzeg, in the green school behind the school’s “C” building. Due to the existing decline in the north-east direction, it is necessary to revitalise the space including land leveling and leveling of the area together with the execution of linear dehydration and drainage. The material scope includes the preparatory work of the degraded area and its draining and related to the construction of the pitch, the construction of polyurethane pavement with the equipment of each of the fields with the necessary usable elements, the construction of the periphery, the basic fence, the fence with ball grips, the development of the terrain around, through the execution of pedestrian routes, the sowing of grass and the establishment of small architecture objects such as benches and baskets. The pitch will be a facility adapted to the needs of people with disabilities. The total area covered by the project is 2 664 m², which is entirely located in the revitalised area (0.27 hectares of area, 100 % of the project area is located in the area covered by the revitalisation programme and 1 infrastructure facility located in the revitalised area). Investor supervision and promotion of the project will be provided for the project. A design and cost estimate documentation and a feasibility study of the project’s investment were carried out. (English)
    0 references
    WOJ.: OPOLSKIE, POW.: brzeski
    0 references

    Identifiers

    RPOP.10.02.00-16-0011/21
    0 references