Groundwater REsource managemENt for non-Potable water pUrposes, baseMent protection, and heating - Pilot application (Q4302136)
Jump to navigation
Jump to search
Project Q4302136 in Greece, Bulgaria
Language | Label | Description | Also known as |
---|---|---|---|
English | Groundwater REsource managemENt for non-Potable water pUrposes, baseMent protection, and heating - Pilot application |
Project Q4302136 in Greece, Bulgaria |
Statements
766,194.23 Euro
0 references
901,404.98 Euro
0 references
85.0 percent
0 references
15 March 2018
0 references
18 July 2021
0 references
ARISTOTLE UNIVERSITY OF THESSALONIKI-SPECIAL ACCOUNT FOR RESEARCH FUNDS - DEPARTMENT OF PHYSICS
0 references
Q4389101 (Deleted Item)
0 references
GREEN PUMP aspires to show a novel method that can be used to reduce unnecessary public works due to high network load, decrease the environmental impact of water/energy use in public buildings and, on the long run, save money. Our approach consists of the following: 1. Elaboration of criteria for site selection (groundwater quality, aquifer depth, vicinity to prospective users, flooding risk, etc.). 2. Study of technical implementation details to existing and new buildings and cost estimation. 3. Complete study of installations of several such systems in many areas of Greece. 4. Construction of one complete pilot installation in Thessaloniki, Greece, and secondary water use ones in Blagoevgrad and Petrich, Bulgaria, and Pylaia, Greece. 5. Elaboration of monitoring program for such systems and monitoring of the pilot systems. 6. Evaluation of the environmental and social benefits. Optimization of the design per user needs. 7. Policy document on the simplification of legal procedures. (English)
0 references