Strengthening local identity and cohesion in Gyöngyöspata (Q3952664)

From EU Knowledge Graph
Revision as of 04:41, 15 February 2022 by DG Regio (talk | contribs) (‎Changed an Item: fix budget)
Jump to navigation Jump to search
Project Q3952664 in Hungary
Language Label Description Also known as
English
Strengthening local identity and cohesion in Gyöngyöspata
Project Q3952664 in Hungary

    Statements

    0 references
    0 references
    39,945,411.7 forint
    0 references
    112,925.68 Euro
    0.002827 Euro
    15 February 2022
    0 references
    46,994,602.0 forint
    0 references
    132,853.74 Euro
    0.002827 Euro
    15 February 2022
    0 references
    85.0 percent
    0 references
    1 September 2018
    0 references
    1 May 2022
    0 references
    GYÖNGYÖSPATA VÁROS ÖNKORMÁNYZATA
    0 references
    0 references
    0 references

    47°50'14.71"N, 19°45'59.76"E
    0 references
    Projektünk konzorciumi formában valósul meg. A konzorcium 2 tagból áll. Jelen projekt átfogó célja helyi közösségek fejlesztése elsősorban Gyöngyöspata település közösségi kezdeményező- és cselekvőképességének fejlesztésével, a közösségi szerepvállalás erősödésével. A projekt keretében megvalósuló tevékenységek: Önállóan támogatható tevékenységek: 1. Közösségek részvételével megvalósuló felmérés és tervezés, 2. A projekt által érintett térség, település, településrész közösségi tevékenységének történeti feltárása és a lakosság számára elérhetővé tétele, 3. térség lakosságának közösségi együttműködését dinamizáló és fenntartó közösségi akciók, tevékenységek, események, programok, folyamatok megvalósítása, 4. A település társadalom- és gazdaságfejlesztése tekintetében meghatározó dokumentumok közül a helyi cselekvési tervhez illeszkedő stratégiai dokumentum(ok)nak – a 3. d) pont szerinti – részvételi fórumok keretei között való áttekintése és amennyiben releváns megújítása, 5. A közösségfejlesztési folyamatról tájékoztató közösségi információs pont kialakítása, 6. A közösségfejlesztési folyamat szakmai minőségének biztosítása Kötelezően megvalósítandó, önállóan nem támogatható tevékenységek: 1, Infokommunikációs akadálymentesítés 2, Nyilvánosság biztosítása Választható, önállóan nem támogatható tevékenységek: A projekt keretében megvalósuló akciók, közösségi tevékenységek, események, programok, folyamatok és együttműködések megvalósításához szükséges eszközbeszerzés. A programok lebonyolítására 36 hónap áll rendelkezésre. A projekt keretében megvalósuló programok részletes kidolgozás rendezvénynaptárral a helyi cselekvési terv kidolgozásával a 2. mérföldkőben valósul meg. (Hungarian)
    0 references
    Our project is implemented in the form of a consortium. The Consortium consists of 2 members. The overall objective of this project is to develop local communities primarily by developing the community’s capacity of initiative and action in Gyöngyöspata, and by strengthening community engagement. Activities under the project: Self-eligible activities: 1. Survey and planning with the participation of the Communities, 2. The historical exploration and accessibility of the community activities of the area, settlements and settlements affected by the project, the implementation of community actions, activities, events, programmes, processes and activities that dynamise and maintain the community cooperation of the population of the 3 rd region, 4. Review and, where relevant, renewal of the strategic document(s) in line with the local action plan in the framework of participatory fora, as referred to in point 3(d), among the documents determining the social and economic development of the municipality. Establishment of a Community Information Point for information on the community development process, 6. Ensuring the professional quality of the community development process Compulsory non-eligible activities: 1, Infocommunication accessibility 2, Providing publicity Optional, ineligible activities: Procurement of equipment necessary for the implementation of actions, community activities, events, programmes, processes and collaborations carried out within the framework of the project. 36 months are available for the implementation of the programmes. The detailed preparation of the programmes under the project with a calendar of events will be implemented in milestone 2 with the preparation of the local action plan. (English)
    9 February 2022
    0 references
    Notre projet est mis en œuvre sous la forme d’un consortium. L’objectif général de ce projet est de développer les communautés locales en développant la capacité d’initiative et d’action de la communauté à Gyöngyöspata et en renforçant l’engagement communautaire. Activités dans le cadre du projet: Activités auto-éligibles: 1. Enquête et planification avec la participation des communautés, 2. L’exploration historique et l’accessibilité des activités communautaires de la région, des établissements et des établissements touchés par le projet, la mise en œuvre d’actions, d’activités, d’événements, de programmes, de processus et d’activités communautaires qui stimulent et maintiennent la coopération communautaire de la population de la troisième région, 4. Examiner et, le cas échéant, renouveler le(s) document(s) stratégique(s) conformément au plan d’action local dans le cadre des forums participatifs visés au point 3 d), parmi les documents déterminant le développement social et économique de la municipalité. Création d’un point d’information communautaire pour l’information sur le processus de développement communautaire, 6. Assurer la qualité professionnelle du processus de développement communautaire Activités obligatoires non admissibles: 1, Infocommunication accessibilité 2, Fournir de la publicité Activités facultatives et non admissibles: Achat du matériel nécessaire à la mise en œuvre d’actions, d’activités communautaires, d’événements, de programmes, de processus et de collaborations menés dans le cadre du projet. 36 mois sont disponibles pour la mise en œuvre des programmes. La préparation détaillée des programmes dans le cadre du projet avec un calendrier des manifestations sera mise en œuvre à l’étape 2 avec l’élaboration du plan d’action local. (French)
    10 February 2022
    0 references
    Gyöngyöspata, Heves
    0 references

    Identifiers

    TOP-5.3.1-16-HE1-2017-00009
    0 references