Transport development in Tolna County (Reservation Project 4) (Q3947465)
Jump to navigation
Jump to search
Project Q3947465 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Transport development in Tolna County (Reservation Project 4) |
Project Q3947465 in Hungary |
Statements
476,773,000.0 forint
0 references
535,700,000.0 forint
0 references
89.0 percent
0 references
5 April 2017
0 references
31 August 2019
0 references
Magyar Közút Nonprofit Zártkörűen Működő Részvénytársaság
0 references
A projekt keretében mindösszesen 8,987 km hosszon kerül mellékúthálózati szakasz felújításra. A beavatkozás során a meglévő burkolat profilmarását végezzük el, majd kötő és kopóréteg beépítésével alakítjuk ki az új burkolatot. A vízelvezetést a meglévő vízelvezetési rendszer felújításával, jó karba helyezésével biztosítjuk, valamint az útpadka is rendezésre kerül. Az érintett útszakaszokon lévő műtárgyak, átereszek, forgalomtechnikai berendezések szükség szerint felújításra kerülnek. Felújítással érintett szakaszok: 6408 j. ök út (0+000-9+020 kmsz) beavatkozási hossz: 8,987 km érintett település: Pincehely, Ozora A projekt 4-5 számjegyű leromlott állapotú utak felújítását, fejlesztését célozza meg, melynek megvalósulása esetén javul a települések és a térségben lévő munkahelyek elérhetősége, ezzel a munkaerő mobilitást és gazdaságfejlesztést ösztönzi. A beruházások az állami úthálózaton valósulnak meg. Az érintett ingatlanok és tulajdonviszonyai ténylegesen csak a tervezés folyamán határozhatóak meg. A projekt a közúti közlekedésről szóló 1988. I. tv. 8. § (1a) bekezdésével összhangban kerül(t) tervezésre valamennyi érintett közlekedő igényeinek a figyelembevételével. A lakott területen belüli útszakaszok esetében a kerékpáros forgalom biztonságos levezetésének lehetősége megvizsgálásra kerül(t). A beruházás hozzájárul a közlekedésbiztonság javításához, a tervezés és megvalósítás során a közlekedésbiztonsági szempontok kiemelt figyelmet kapnak illetve fognak kapni. A beruházás a Tolna Megyei Területfejlesztési programba illeszkedik. A felújításra kerülő útszakaszok listája a megyei önkormányzattal egyeztetésre, jóváhagyatásra került. A Pályázó szervezeti formájából, továbbá szakértői és intézményi hátteréből adódóan, a projekt pénzügyi fenntarthatósága, illetve a megvalósított tevékenység hosszú távú (5 éves) működtetése és fenntartása biztosított. A projekt műszaki tartalma úgy kerül kialakításra, megtervezésre, hogy javítson a gyalogosok, kerékpárosok, de mindenekelőtt a gyerekek, idősek és fogyatékkal élők közlekedésbiztonságán. A beruházást költséghatékony módon, reális és takarékos költségvetéssel került megtervezésre, illetve kerül megvalósításra. A beruházás közvetlen vagy közvetett gazdaságfejlesztési és foglalkoztatási kapcsolódással valósul meg, valamint elősegíti a munkaerő mobilitás infrastrukturális feltételeit. A beruházás a Tolna Megyei Területfejlesztési programba illeszkedik. A felújításra kerülő útszakaszok listája a megyei önkormányzattal egyeztetésre, jóváhagyatásra került. A felújított útszakasz 2 db települést érint. (Hungarian)
0 references
As part of the project, a section of the secondary road network will be refurbished for a total length of 8.987 km. During the intervention, the profile milling of the existing casing is performed, and the new casing is formed by the installation of a binding and wear layer. The drainage is ensured by refurbishing the existing drainage system and by placing it in a good arm, and the road bench is also arranged. Works of art, penetrating and traffic equipment on the affected road sections will be refurbished as necessary. Refurbished sections: 6408 j. road (0+ 000-9+ 020 kms) intervention length: 8.987 km of the municipality concerned: Pincehely, Ozora The project aims at the renovation and development of 4-5 digit roads with degraded conditions, which will improve the availability of settlements and jobs in the region, thereby encouraging labour mobility and economic development. Investments are made on the public road network. In fact, the properties concerned and their ownership can only be determined during the planning process. The project concerns road transport in 1988. I. tv. Shall be planned in accordance with Section 8(1a) taking into account the needs of all operators concerned. In the case of road sections within a residential area, the possibility of safely driving cycling traffic will be examined. The investment contributes to the improvement of road safety and the road safety aspects will be and will be given special attention in the planning and implementation process. The investment is part of the Tolna County Regional Development Programme. The list of road sections to be refurbished has been agreed and approved with the county government. Due to the organisation of the Applicant and its expert and institutional background, the financial sustainability of the project and the long-term (5 years) operation and maintenance of the implemented activity are ensured. The technical content of the project will be designed and designed to improve the safety of pedestrians, cyclists and, above all, children, the elderly and people with disabilities. The investment is planned and implemented in a cost-effective manner, with a realistic and economical budget. The investment is carried out through a direct or indirect link to economic development and employment and facilitates the infrastructure conditions for labour mobility. The investment is part of the Tolna County Regional Development Programme. The list of road sections to be refurbished has been agreed and approved with the county government. The renovated road section covers 2 settlements. (English)
9 February 2022
0 references
Dans le cadre du projet, un tronçon du réseau routier secondaire sera remis à neuf pour une longueur totale de 8,987 km. Au cours de l’intervention, le broyage de profilés du boîtier existant est effectué, et le nouveau boîtier est formé par l’installation d’une couche de fixation et d’usure. Le drainage est assuré par la remise en état du système de drainage existant et en le plaçant dans un bon bras, et le banc de route est également disposé. Les œuvres d’art, les équipements de pénétration et de circulation sur les tronçons routiers concernés seront remis à neuf si nécessaire. Sections rénovées: 6408 j. route (0+ 000-9+ 020 kms) longueur d’intervention: 8,987 km de la commune concernée: Pincehely, Ozora Le projet vise la rénovation et le développement de routes à 4 à 5 chiffres avec des conditions dégradées, ce qui améliorera la disponibilité des établissements et des emplois dans la région, favorisant ainsi la mobilité de la main-d’œuvre et le développement économique. Les investissements sont réalisés sur le réseau routier public. En fait, les propriétés concernées et leur propriété ne peuvent être déterminées qu’au cours du processus de planification. Le projet concerne le transport routier en 1988. I. TV. Est planifiée conformément à la section 8, paragraphe 1 bis, en tenant compte des besoins de tous les opérateurs concernés. Dans le cas des tronçons routiers à l’intérieur d’une zone résidentielle, la possibilité de conduire en toute sécurité la circulation cycliste sera examinée. L’investissement contribue à l’amélioration de la sécurité routière et les aspects liés à la sécurité routière feront l’objet d’une attention particulière dans le processus de planification et de mise en œuvre. L’investissement fait partie du programme de développement régional du comté de Tolna. La liste des tronçons routiers à remettre en état a été convenue et approuvée avec le gouvernement du comté. En raison de l’organisation de la requérante et de ses connaissances spécialisées et institutionnelles, la viabilité financière du projet ainsi que l’exploitation et la maintenance à long terme (5 ans) de l’activité mise en œuvre sont assurées. Le contenu technique du projet sera conçu et conçu pour améliorer la sécurité des piétons, des cyclistes et, surtout, des enfants, des personnes âgées et des personnes handicapées. L’investissement est planifié et mis en œuvre de manière rentable, avec un budget réaliste et économique. L’investissement est réalisé par le biais d’un lien direct ou indirect avec le développement économique et l’emploi et facilite les conditions d’infrastructure pour la mobilité de la main-d’œuvre. L’investissement fait partie du programme de développement régional du comté de Tolna. La liste des tronçons routiers à remettre en état a été convenue et approuvée avec le gouvernement du comté. Le tronçon de route rénové couvre 2 agglomérations. (French)
10 February 2022
0 references
Pincehely, Tolna
0 references
Identifiers
TOP-1.3.1-15-TL1-2016-00005
0 references