Installation of solar system at Szikla Team Ltd. in Szombathely (Q3936114)

From EU Knowledge Graph
Revision as of 23:17, 14 February 2022 by DG Regio (talk | contribs) (‎Changed an Item: fix budget)
Jump to navigation Jump to search
Project Q3936114 in Hungary
Language Label Description Also known as
English
Installation of solar system at Szikla Team Ltd. in Szombathely
Project Q3936114 in Hungary

    Statements

    0 references
    0 references
    1,869,252.0 forint
    0 references
    5,284.38 Euro
    0.002827 Euro
    15 February 2022
    0 references
    3,398,640.0 forint
    0 references
    9,607.96 Euro
    0.002827 Euro
    15 February 2022
    0 references
    55.0 percent
    0 references
    16 October 2020
    0 references
    30 September 2022
    0 references
    Szikla Team Kereskedelmi és Szolgáltató Korlátolt Felelősségű Társaság
    0 references
    0 references

    47°13'44.83"N, 16°37'7.54"E
    0 references
    A projekt során az alábbi fejlesztés valósul meg: Napelemes rendszer telepítése. A tetőn elhelyezett összesen 11,76 kWp teljesítményű napelemrendszer beüzemelése valósul meg. A projekt előkészítése során idáig megtörtént a projekt megfelelő előkészítése. Felkértük a Felhívásnak előírásainak mindenben megfelelő a Magyar Mérnöki Kamara névjegyzékében szereplő, cégünktől független SZÉS6 jogosultsággal rendelkező szakértőt, hogy készítse el a pályázat benyújtásához szükséges energetikai számításokat, és nyilatkozatokat. A nyilatkozatokat a pályázat mellékleteként csatoltuk. Felkértük a tervezőt a megfelelő tervek elkészítésére. Elkészült a műszaki leírás, valamint a tervrajzok, amelyeket szintén a pályázat mellékleteként csatoltunk. Utánajártunk annak, hogy az építési beruházás nem engedélyköteles tevékenység, így építési engedély beszerzése nem vált szükségessé. A projekt legfontosabb következő lépései a kivitelezési munkák megrendelése, a műszaki ellenőrrel történő egyeztetés, majd a kivitelezés nyomon követése, dokumentálás és végül az elszámolás. A kivitelezési munkák megfelelő színvonalú elkészítését ME-V jogosultsággal rendelkező műszaki ellenőr fogja felügyelni. A projekt végén az elszámoláshoz szükséges nyilatkozatok, valamint a hálózathasználati szerződés beszerzése történik, ezt követően benyújtásra kerül a záró elszámolás. A megvalósítás során külsős, tapasztalattal rendelkező projkektmenedzser segíti majd a megvalósítást. A projektmenedzser 10 éves pályázati projektmegvalósítási tapasztalattal rendelkezik, több, sikeresen megvalósult épületenergetikai projekt megvalósítását koordinálta már. Jelen projekt keretében csak a napelemes rendszer beruházásának költségeit kívánjuk elszámolni. Megvalósítani kívánt célterületek: A. Megújuló energiafelhasználás növelését célzó tevékenységek III. Napelemes rendszer telepítése hálózati villamosenergia-termelés céljából, kizárólag a fejlesztésben érintett épület és az abban folyó gazdasági-termelési folyamatok villamosenergia-ellátásához Ide terveztünk be a 28 db panelből álló, Luxor Eco Line 420 Wp Monokristályos napelemekből álló, összesen 11,76 kWp teljesítményű napelemrendszer díját. A napelemek a tetőn kerülnek elhelyezésre. A rendszerhez 1 db SolarEdge SE 10 K Inverter kerül beszerzésre. (Hungarian)
    0 references
    The following development will be carried out during the project: Installation of solar system. A solar system with a total capacity of 11.76 kWp installed on the roof is installed. The project has been properly prepared to date during the preparation of the project. We have invited an expert with SZÉS6 privileges from the Hungarian Chamber of Engineers, which is independent of our company, to prepare the energy calculations and declarations necessary for the submission of the application, in accordance with the requirements of the call. The declarations are attached as an annex to the application. We asked the designer to prepare the appropriate plans. The technical specifications as well as the blueprints have been prepared, which are also attached as an annex to the tender. We checked that the works were not subject to authorisation, so it was not necessary to obtain a building permit. The most important next steps of the project are the ordering of construction works, consultation with the technical inspector, followed-up, documentation and accounting. The completion of the construction works will be supervised by a technical inspector with ME-V authorisation. At the end of the project, the declarations required for the settlement and the contract of use of the network will be obtained, after which the final accounts will be submitted. The implementation will be supported by an external and experienced projkekt manager. The project manager has 10 years of project implementation experience and has already coordinated the implementation of several successfully implemented building energy projects. In the framework of this project, we only wish to declare the costs of the investment of the solar system. Target areas to be achieved: A. Activities to increase renewable energy use III. Installation of a solar system for grid electricity generation only for the electricity supply of the building involved in the development and the economic and production processes involved in the development. This is where we planned the charge of the solar panel system consisting of 28 panels, Luxor Eco Line 420 Wp Monocrystalline, with a total capacity of 11.76 kWp. Solar panels are placed on the roof. 1 SolarEdge SE 10 K Inverter is purchased for the system. (English)
    8 February 2022
    0 references
    Les développements suivants seront réalisés au cours du projet: Installation du système solaire. Un système solaire d’une capacité totale de 11,76 kWp installé sur le toit est installé. Le projet a été correctement préparé à ce jour pendant la préparation du projet. Nous avons invité un expert avec les privilèges SZÉS6 de la Chambre hongroise des ingénieurs, indépendante de notre société, à préparer les calculs et les déclarations d’énergie nécessaires à la soumission de la demande, conformément aux exigences de l’appel. Les déclarations sont jointes en annexe à la requête. Nous avons demandé au concepteur de préparer les plans appropriés. Les spécifications techniques ainsi que les plans directeurs ont été élaborés, qui sont également joints en annexe à l’offre. Nous avons vérifié que les travaux n’étaient pas soumis à autorisation, de sorte qu’il n’était pas nécessaire d’obtenir un permis de construire. Les prochaines étapes les plus importantes du projet sont la commande des travaux de construction, la consultation de l’inspecteur technique, le suivi, la documentation et la comptabilité. L’achèvement des travaux de construction sera supervisé par un inspecteur technique autorisé par ME-V. À la fin du projet, les déclarations nécessaires au règlement et au contrat d’utilisation du réseau seront obtenues, après quoi les comptes définitifs seront présentés. La mise en œuvre sera soutenue par un gestionnaire projkekt externe et expérimenté. Le chef de projet dispose de 10 ans d’expérience dans la mise en œuvre des projets et a déjà coordonné la mise en œuvre de plusieurs projets d’énergie de construction exécutés avec succès. Dans le cadre de ce projet, nous souhaitons seulement déclarer les coûts de l’investissement du système solaire. Domaines cibles à atteindre: A. Activités visant à accroître l ' utilisation des énergies renouvelables III. Installation d’un système solaire pour la production d’électricité du réseau uniquement pour la fourniture d’électricité du bâtiment impliqué dans le développement et les processus économiques et de production impliqués dans le développement. C’est là que nous avons prévu la charge du système de panneaux solaires composé de 28 panneaux, Luxor Eco Line 420 Wp Monocrystalline, d’une capacité totale de 11,76 kWp. Des panneaux solaires sont placés sur le toit. 1 L’onduleur SolarEdge SE 10 K est acheté pour le système. (French)
    10 February 2022
    0 references
    Szombathely, Vas
    0 references

    Identifiers

    GINOP-4.1.4-19-2020-03414
    0 references