Implementation of building energy development at One-Profit Kft. (Q3925084)

From EU Knowledge Graph
Revision as of 21:46, 14 February 2022 by DG Regio (talk | contribs) (‎Changed an Item: fix budget)
Jump to navigation Jump to search
Project Q3925084 in Hungary
Language Label Description Also known as
English
Implementation of building energy development at One-Profit Kft.
Project Q3925084 in Hungary

    Statements

    0 references
    0 references
    15,418,000.0 forint
    0 references
    43,586.69 Euro
    0.002827 Euro
    14 February 2022
    0 references
    30,836,000.0 forint
    0 references
    87,173.37 Euro
    0.002827 Euro
    14 February 2022
    0 references
    50.0 percent
    0 references
    10 May 2019
    0 references
    10 January 2020
    0 references
    One-Profit Kereskedelmi és Szolgáltató Korlátolt Felelősségű Társaság
    0 references
    0 references

    47°13'44.83"N, 16°37'7.54"E
    0 references
    A. Projekt-előkészítési tevékenységek: A projekt benyújtásakor elkészítésre került az épületenergetikai melléklet, a statikai szakvélemény és a tervezett beruházás műszaki leírása. A projekt keretében tervezett beruházás nem építési engedély köteles, így teljes engedélyezési és kiviteli tervdokumentáció elkészítése nem releváns. A környezeti hatásvizsgálati és az egységes környezethasználati engedélyezési eljárásról szóló 314/2005. (XII. 25.) Korm. rendeletnek megfelelően környezeti hatásvizsgálat elkészítése nem releváns. Tevékenységek: B.I. Épületek hőtechnikai adottságainak javítása, hőveszteségének csökkentése: - Az épületrészek hőszigetelésének javítása: az épületet szükséges 15 cm vastag polisztirolhab hőszigeteléssel ellátni, dryvit rendszerben. A felület kialakítása kvarc putz vékony habarcs bevonattal történik. A padlásfödém hőszigetelésének növelése 20 cm vastag kőzetgyapot terítéssel kerül megoldásra. - Fűtött és fűtetlen teret elválasztó, nyílászáró szerkezetnek minősülő épülethatároló szerkezetek cseréje / energia-megtakarítást eredményező korszerűsítése: tekintettel, hogy az épület hőtechnikai adottságai nagyon gyengék, a házon az összes nyílászárót (13 db ablak, 1 db bejárati ajtó, 1 db hátsó bejárati ajtó, 1 db erkélyajtó) ki kell cserélni. Az ablakok fokozottan hőszigetelt (3 rétegű üvegezésű, 5 kamrás egyedi gyártású, redőnyös kivitelezésben) műanyag nyílászárókra kerülnek cserélésre. B.II. Épületek fűtési, hűtési és használati melegvíz-rendszereinek korszerűsítése: - Fűtési- és/vagy használati melegvíz-rendszerek korszerűsítése: a fűtéskorszerűsítés víz-víz hőszivattyús rendszerrel kerül megoldásra. Ennek jellemzője a viszonylag alacsony előre menő hőáram. Ez szükségessé teszi a jobb hőleadó felület kialakítását, mely méretezett 2 vagy 3 rétegű lapradiátorokkal kerül megoldásra. A radiátorok 18-28 mm átmérőjű forrasztott rézcsőszereléssel kerülnek összekötésre a hőszivattyúkkal. A kazánházban kerül elhelyezésre a tágulási tartály, a keringető szivattyú. C. Megújuló energiafelhasználás növelését célzó tevékenységek: - 20 KW-os napelemes rendszer telepítése: a tervezett 80 db panel elhelyezésére a provizórikus melléképületek felett, 2 helyen van praktikus lehetőség. A tervezett, lábakon álló acélszerkezet 9x7, ill. 3x13 m-es. Az acél oszlopok a meglévő térbetonra támaszkodnak, magasságuk 2,5 és 3,5 m. A tervezett napelem táblák 270 W-os Amerisolar típusúak. A hozzá tartozó 3 fázisú inverter Growatt típusú. Az invertertől az épületben lévő szaldós óráig MK 25-ös kábel kerül, részben légkábelként beépítésre. A rendszerhez WIFI modul is kiépítésre kerül. - Hőszivattyúk telepítése: A székhely 6 m mély, fúrt, nagykapacitású kúttal rendelkezik. Így adott a lehetőség víz-víz hőszivattyús fűtésrendszer kialakítására. A tervek szerint 2 db 20 kW-os SPARK-WW 20 H típusú magyar gyártású hőszivattyú kerül beépítésre a kazánházban. A hőszivattyúk adatai átlagosan: jósági fok (CP) 4,7, áramfelvétel 2x6,9. A teljesítmény 2x6,9 KW a tervezett vízáramra vonatkoztatva. A hőszivattyúk sorba kerülnek bekötésre, így a melegvíz igény optimalizálódik, mely a tervek szerint 5,7 m3/h. A lehűlt víz 5/4”-os KPE csövön az udvaron meglévő tüzivíz tározóba kerül vezetésre. D. Egyéb tevékenység: - Szakmai megvalósításhoz kapcsolódó szolgáltatásként projektmenedzsment tevékenység kerül megvalósításra, mint igénybevett szakértői szolgáltatás. (Hungarian)
    0 references
    A. Project preparation activities: At the time of submission of the project, the building energy annex, the static opinion and the technical description of the planned investment were prepared. The project planned in the framework of the project is not subject to a building permit, so the preparation of a complete permit and construction plan documentation is not relevant. Government Decree No 314/2005 on the environmental impact assessment procedure and the uniform environmental use permit procedure (XII. 25) the preparation of an environmental impact assessment is not relevant in accordance with Government Decree No 25/2004. Activities: B.I. Improving the thermal capabilities of buildings and reducing their heat loss: — Improvement of the thermal insulation of parts of the building: the building needs to be thermally insulated with 15 cm thick polystyrene foam in dryvit system. The surface design of quartz putz is done with thin mortar coating. Increasing the thermal insulation of the attic floor is solved with 20 cm thick rock wool spreading. — Replacement of building envelopes considered as doors and windows separating heated and unheated spaces/upgrading resulting in energy savings: given that the thermal equipment of the building is very weak, all doors (13 windows, 1 entrance door, 1 rear entrance door, 1 balcony door) must be replaced on the house. The windows are replaced with plastic doors and windows which are highly insulated (3 layers of glazing, 5 chambers custom-made and shuttered). B.II. Upgrading of heating, cooling and domestic hot water systems in buildings: — Modernisation of heating and/or domestic hot water systems: the heating upgrade is solved with a water-water heat pump system. This is characterised by a relatively low forward heat flow. This necessitates the design of a better heat take-off surface, which is solved with dimensioned 2 or 3 layers of sheet radiators. Radiators are connected to heat pumps by soldered copper tube fittings 18-28 mm in diameter. In the boiler room is placed the expansion tank, the circulating pump. C. Activities to increase renewable energy use: — Installation of 20 KW solar panel system: the planned 80 panels can be installed in 2 places above the provisory outbuildings. The planned steel structure is 9x7 m and 3x13 m respectively. Steel columns rely on existing space concrete, height 2.5 and 3.5 m. Designed solar panel boards are 270 W Amerisolar type. The associated 3-phase inverter Growatt type. From the inverter to the saldo in the building, MK 25 cable will be installed, partly installed as an air cable. A WIFI module is also installed for the system. — Installation of heat pumps: The head office has a 6 m deep, drilled, high capacity well. Thus, it is possible to develop a water-to-water heat pump heating system. According to the plans, 220 kW SPARK-WW 20 H heat pumps will be installed in the boiler room. Average heat pump data: goodness degree (CP) 4,7, current consumption 2x6,9. The power is 2x6,9 KW for the planned water flow. The heat pumps are connected in series, so the hot water demand is optimised, which is planned to be 5.7 m³/h. The cooled water is driven to the fire-water reservoir in the yard on a 5/4" KPE tube. D. Other activities: — As a service related to professional implementation, project management activities are carried out as an expert service. (English)
    8 February 2022
    0 references
    A. Activités de préparation des projets: Au moment de la soumission du projet, l’annexe sur l’énergie du bâtiment, l’avis statique et la description technique de l’investissement prévu ont été élaborés. Le projet planifié dans le cadre du projet n’est pas soumis à un permis de construire, de sorte que la préparation d’un permis complet et de la documentation relative au plan de construction n’est pas pertinente. Décret gouvernemental no 314/2005 relatif à la procédure d’évaluation des incidences sur l’environnement et à la procédure uniforme d’autorisation d’utilisation de l’environnement (XII. 25) la préparation d’une évaluation des incidences sur l’environnement n’est pas pertinente conformément au décret gouvernemental no 25/2004. Activités: B.I. Améliorer les capacités thermiques des bâtiments et réduire leurs pertes de chaleur: — Amélioration de l’isolation thermique des parties du bâtiment: le bâtiment doit être isolé thermiquement avec une mousse de polystyrène de 15 cm d’épaisseur dans le système Dryvit. La conception de surface du putz de quartz est faite avec un revêtement de mortier mince. L’augmentation de l’isolation thermique du plancher du grenier est résolue par l’épandage de la laine de roche de 20 cm d’épaisseur. — Remplacement des enveloppes du bâtiment considérées comme des portes et des fenêtres séparant les espaces chauffés et non chauffés/mise à niveau, ce qui permet d’économiser de l’énergie: étant donné que l’équipement thermique du bâtiment est très faible, toutes les portes (13 fenêtres, 1 porte d’entrée, 1 porte d’entrée arrière, 1 porte de balcon) doivent être remplacées sur la maison. Les fenêtres sont remplacées par des portes en plastique et des fenêtres très isolées (3 couches de vitrage, 5 chambres sur mesure et coffrées). B.II. Modernisation des systèmes de chauffage, de refroidissement et d’eau chaude dans les bâtiments: — Modernisation des systèmes de chauffage et/ou d’eau chaude sanitaire: L’amélioration du chauffage est résolue avec un système de pompe à chaleur eau-eau. Cela se caractérise par un flux de chaleur vers l’avant relativement faible. Cela nécessite la conception d’une meilleure surface de décollage de chaleur, qui est résolue avec 2 ou 3 couches de radiateurs en tôle dimensionnées. Les radiateurs sont raccordés à des pompes à chaleur par des raccords de tubes en cuivre soudés de 18 à 28 mm de diamètre. Dans la chaufferie est placé le réservoir d’expansion, la pompe de circulation. C. Activités visant à accroître l ' utilisation des énergies renouvelables: — Installation du système de panneaux solaires de 20 KW: les 80 panneaux prévus peuvent être installés en 2 places au-dessus des dépendances provisoires. La structure en acier prévue est respectivement de 9x7 m et 3x13 m. Les colonnes en acier dépendent du béton d’espace existant, hauteur 2,5 et 3,5 m. Les panneaux solaires conçus sont de type Amerisolar 270 W. Le type d’onduleur triphasé associé Growatt. De l’onduleur au saldo dans le bâtiment, un câble MK 25 sera installé, en partie installé sous forme de câble pneumatique. Un module WIFI est également installé pour le système. — Installation de pompes à chaleur: Le siège social dispose d’un puits de 6 m de profondeur, foré et haute capacité. Ainsi, il est possible de développer un système de chauffage par pompe à chaleur eau-eau. Selon les plans, des pompes à chaleur SPARK-WW 20 H de 220 kW seront installées dans la chaufferie. Données moyennes de la pompe à chaleur: degré de bonté (CP) 4,7, consommation courante 2x6,9. La puissance est de 2x6,9 KW pour le débit d’eau prévu. Les pompes à chaleur sont connectées en série, de sorte que la demande d’eau chaude est optimisée, qui est prévue pour être de 5,7 m³/h. L’eau refroidie est conduite au réservoir d’eau-incendie dans la cour avec un tube KPE de 5/4». D. Autres activités: — En tant que service lié à la mise en œuvre professionnelle, les activités de gestion de projet sont réalisées en tant que service d’experts. (French)
    10 February 2022
    0 references
    Szombathely, Vas
    0 references