Building energy development of the laser hall to be developed at the Metal Pressing Ltd. (Q3925039)

From EU Knowledge Graph
Revision as of 21:45, 14 February 2022 by DG Regio (talk | contribs) (‎Changed an Item: fix budget)
Jump to navigation Jump to search
Project Q3925039 in Hungary
Language Label Description Also known as
English
Building energy development of the laser hall to be developed at the Metal Pressing Ltd.
Project Q3925039 in Hungary

    Statements

    0 references
    39,611,830.0 forint
    0 references
    111,982.64 Euro
    0.002827 Euro
    14 February 2022
    0 references
    79,223,660.0 forint
    0 references
    223,965.29 Euro
    0.002827 Euro
    14 February 2022
    0 references
    50.0 percent
    0 references
    7 May 2018
    0 references
    12 August 2019
    0 references
    FÉMSAJTOLÓ Korlátolt Felelősségű Társaság
    0 references
    0 references

    47°10'31.66"N, 20°11'40.85"E
    0 references
    Falazat: Meglévő km.tégla falazat hőszigetelése 15 cm EPS80 Bachl hőszigetelő táblákkal ragasztva, majd rögzítve 8db/m2 EPS homlokzati műanyag tárcsás dübellel. Nyílászárók körüli spaletták hőszigetlése majd élvédőzése. Felület glettelése és hálózása, glettelt felületek előkészítése színezéshez mélyalapozós portalanító alapozással. Homlokzat színezése kapart vagy dörzsölt nemesvakolattal. Nyílászárók, ablakok és ajtók: Profil Gelan ütés- és időjárás álló kemény PVC profilok, szerk.szélesség 74 mm, kamrák száma 5/6, merevítés tokban és szárnyban is hg.acélmerevítés, tömítés vasalatok Roto Door Tech biztonsági ajtózár, kilincs Hoppe ill, ezzel egyenértékű típus. Üvegezés 4 Float 16-4 Low-E (1.0) + Ag Multitech G Ug: 1.0 Uw=1.1W/m2K, szín: fehér, CE minősítéssel rendelkező termékekkel. Rögzítése Pur habbal és tokon keresztül rögzített dűbelezéssel. NYílászárók, ipari kapuk: Ditec szekcionált ipari kapuk vízszintes bordázattal Ral7016 színben, harmadik panelben 3db ablak, NL normál sínvezetésű kiképzéssel ujjbecsípődés elleni védelemmel ellátva, rugótörés és bowden szakadás biztosítással. Ditec Force 100 közvetlen tengelyhajtással (3x10 A), láncos függetlenítő egységgel és élvédelemmel szerelt kivitel. Vezérlése automatikus. Tokozaton keresztül dübellel rögzítve és Pur habbal tömítve. Lapos tető szigetelése: Ragasztott, meglévő tetőfedés tisztítása felület előkészítése. A tető szélén vízvető szegélyt tartó 15 mm-es 40cm széles OSB lapos beépítése, rögzítése meglévő födémszerkezethez. Hőszigetelés készítése és rögzítése meglévő szigeteléshez 12cm vastagságban lépésálló, Bauder Pir FA kétoldali alukasítozással falccal 2400x1200mm táblamérettel. Ragasztásos és mechanikus (tárcsás dűbel) rögzítéssel. Szigetelés 2 rétegben, 1 réteg 3mm-es öntapadó alaplemez+1 réteg Bauder Pye Pv 200 S 5 EN poliészter fátyolbetétes modifikált zárólemez. Falszegély + kéményszegélyek szigetelése 50 cm kiterített szélességben Bauder Pye Pv 200 S-5-ös zárólemezből. Új felső, meghosszabított szárú páraelvezetők beépítése régi páraszellőzőkre ráépítve. Vízvető szegély gyártása, szerelése 40cm kiterített szélességben. Világítás korszerűsítése: Led fényforrású csarnokvilágítás kábelezése szakaszolással. Csarnok világítás elhelyezése függesztéssel 6m magasságban. Led fényforrású armatúrák kábelezése szakaszolással Armatúrák elhelyezése függesztéssel 3,5m magasságban. Led fényforrású kültéri világítás kábelezése szakaszolással. Külső világító testek rögzítése külső falazaton dűbellel. Értésvédelem és villámvédelem kialakítása, valamint jegyzőkönyvezése. Napelem telep 25kW telepítése: Trina Solar Honey 270 Wp (TSM-PD05) poly telepítése kiírás szerint. Fronius Eco 25.0-3S Wlan (1MPP) inverter elhelyezése. Szolár kábel 4mm2,fekete-piros fektetése. Panelek tetőn horganyzása közép lefogató és vég lefogató elemekkel. Érintésvédelem és villámvédelem kialakítása. (Hungarian)
    0 references
    Masonry: Thermal insulation of existing km.brick masonry with 15 cm EPS80 Bachl thermal insulation boards, then fixed with 8pcs/m² EPS facade with plastic disc doll. Heat insulation of spalets around doors and windows and edge protection. Filling and netting of surfaces, preparation of gletted surfaces for coloring with deep foundation dedusting foundation. Colouring of the facade with scraped or rubbed noble blinds. Doors and windows, windows and doors: Profile Gelan shock and weather standing hard PVC profiles, edited width 74 mm, number of chambers 5/6, stiffening in case and wing also hg.steel stiffening, gasket irons Roto Door Tech safety door lock, door handle Hoppe or equivalent type. Glazing 4 Float 16-4 Low-E (1.0) + Ag Multitech G Ug: 1.0 Uw=1.1W/m2K, color: white products with CE certification. Fixation with Pur foam and fixed cone through a case. Doors and windows, industrial gates: DITEC sectional industrial gates with horizontal ribbing in Ral7016 colour, 3 pcs windows in the third panel, NL standard rail guided training with Finger pin protection, spring break and bowden tear insurance. DITEC Force 100 with direct axle drive (3x10 A), chain decoupling unit and edge protection. It’s controlled automatically. Secured by dowel through a case and sealed with Pur foam. Insulation of flat roof: Glued, existing roofing cleaning surface preparation. Flat installation of the 15 mm 40 cm wide OSB on the edge of the roof, attached to the existing slab structure. Making and fixing thermal insulation for existing insulation in 12 cm thickness, with Bauder Pir FA double-sided flooring with wall size 2400x1200 mm. With bonding and mechanical (disc dubel) fastening. Insulation in 2 layers, 1 layer of 3 mm self-adhesive base plate+ 1 layer Bauder Pye Pv 200 S 5 EN polyester veiled closure plate. Wall edge + insulation of chimney edges in 50 cm wide Bauder Pye Pv 200 S-5 seal plate. Installation of new upper, extended damp outlets on old vapour vents. Production and installation of water launcher edges in 40 cm wide width. Modernisation of lighting: Wiring of LED light source hall lighting with discontinuation. Hall lighting placement by hanging at 6 m height. Wiring of LED light source armatures with intersection placement of armatures with suspension at 3.5 m height. Wiring of LED light source outdoor lighting with discontinuation. Fixation of exterior illuminating bodies on external masonry with dubellum. Establishment and recording of lightning protection and lightning protection. Solar panel plant 25 kW installation: Trina Solar Honey 270 Wp (TSM-PD05) poly installation according to specifications. Fronius Eco 25.0-3S Wlan (1MPP) inverter placement. Solar cable 4 mm²,black-red laying. Galvanising of panels on roofs with mid-finishing and end-finishing elements. Design of touch protection and lightning protection. (English)
    8 February 2022
    0 references
    Maçonnerie: Isolation thermique de maçonnerie existante km.brick avec 15 cm EPS80 Bachl panneaux d’isolation thermique, puis fixé avec 8pcs/m² façade EPS avec poupée à disque plastique. Isolation thermique des spalets autour des portes et des fenêtres et protection des bords. Remplissage et filetage des surfaces, préparation de surfaces gletées pour la coloration avec fond de teint profond. Coloration de la façade avec stores nobles grattés ou frottés. Portes et fenêtres, fenêtres et portes: Profil Profil Gelan choc et intempéries profilés en PVC dur, largeur ajustée 74 mm, nombre de chambres 5/6, raidissement dans le cas et l’aile aussi hg.acier raidissement, joint fers Roto Door Tech serrure de porte de sécurité, poignée de porte Hoppe ou type équivalent. Vitrage 4 Float 16-4 Low-E (1,0) + Ag Multitech G Ug: 1.0 Uw=1.1W/m2K, couleur: produits blancs avec certification CE. Fixation avec mousse Pur et cône fixe à travers un étui. Portes et fenêtres, portes industrielles: Portails industriels sectionnels DITEC avec côtes horizontales de couleur Ral7016, 3 fenêtres pcs dans le troisième panneau, formation guidée standard sur rail NL avec protection contre les broches de doigts, assurance ressort et déchirure arc-en-ciel. DITEC Force 100 avec entraînement direct par essieu (3x10 A), découplage de chaîne et protection des bords. Il est contrôlé automatiquement. Fixé par une serviette à travers un étui et scellé avec de la mousse Pur. Isolation du toit plat: Préparation de la surface de nettoyage de toiture existante collée. Montage plat de l’OSB de 15 mm 40 cm de large sur le bord du toit, fixé à la structure de dalle existante. Fabrication et fixation de l’isolation thermique pour l’isolation existante en épaisseur 12 cm, avec plancher double face Bauder Pir FA de taille murale 2400x1200 mm. Avec collage et fixation mécanique (disque Dubel). Isolation en 2 couches, 1 couche de 3 mm plaque de base auto-adhésive + 1 couche Bauder Pye Pv 200 S 5 EN plaque de fermeture voile polyester. Bord mural + isolation des bords de cheminée en plaque d’étanchéité Bauder Pye Pye Pv 200 S-5 de largeur 50 cm. Installation de nouvelles sorties humides supérieures et étendues sur d’anciens évents de vapeur. Production et pose de bords de lanceur d’eau dans une largeur de 40 cm. Modernisation de l’éclairage: Câblage de l’éclairage de hall de source lumineuse à LED avec arrêt. Placement de l’éclairage du hall par pendaison à 6 m de hauteur. Câblage d’armatures de source lumineuse LED avec emplacement d’intersection des armatures avec suspension à 3,5 m de hauteur. Câblage de l’éclairage extérieur de source de lumière LED avec arrêt. Fixation des corps éclairants extérieurs sur la maçonnerie externe avec dubellum. Mise en place et enregistrement de la protection contre la foudre et la foudre. Installation de panneaux solaires 25 kW: Installation poly Trina Solar Honey 270 Wp (TSM-PD05) selon les spécifications. Placement de l’onduleur Fronius Eco 25.0-3S Wlan (1MPP). Câble solaire 4 mm², pose noir-rouge. Galvanisation des panneaux sur les toits avec des éléments de finition et de finition intermédiaires. Conception de protection tactile et de protection contre la foudre. (French)
    10 February 2022
    0 references
    Szolnok, Jász-Nagykun-Szolnok
    0 references

    Identifiers

    GINOP-4.1.2-18-2018-00012
    0 references