Building energy development at No Stress Nonprofit Kft. (Q3935182)

From EU Knowledge Graph
Revision as of 11:36, 13 February 2022 by DG Regio (talk | contribs) (‎Changed an Item: fix budget)
Jump to navigation Jump to search
Project Q3935182 in Hungary
Language Label Description Also known as
English
Building energy development at No Stress Nonprofit Kft.
Project Q3935182 in Hungary

    Statements

    0 references
    0 references
    11,832,889.0 forint
    0 references
    33,451.58 Euro
    0.002827 Euro
    13 February 2022
    0 references
    21,514,344.0 forint
    0 references
    60,821.05 Euro
    0.002827 Euro
    13 February 2022
    0 references
    55.0 percent
    0 references
    1 June 2020
    0 references
    31 December 2021
    0 references
    No Stress Nonprofit Korlátolt Felelősségű Társaság
    0 references
    0 references

    45°51'12.46"N, 18°13'18.30"E
    0 references
    A cég tervezett beruházásához kapcsolódóan előzetesen felmérésre került az épület, ami alapján elkészült az építési tervdokumentáció: a tervrajzok, a műszaki leírás, valamint a fotódokumentáció és a statikai szakvélemény. Megállapításra került, hogy a beruházás nem építési engedély köteles. Melegh Zoltán energetikai szakértő bevonásával elkészült az épület beruházás megvalósítását megelőző (kiinduló) állapotára vonatkozó hitelesített energetikai tanúsítvány és a bekövetkező (köztes) állapotot valamint a beruházás megvalósítását követő (tervezett) állapotot rögzítő számítások. A projekt keretében legfontosabb elvégzendő tevékenységek: 3.1.1. Önállóan támogatható tevékenységek A) Megújuló energiafelhasználás növelését célzó tevékenységek: III. Napelemes rendszer telepítése Komplett napelemes (fotovoltaikus) rendszer telepítése, villamos hálózatra kapcsolása. Mono vagy polikristályos napelemes rendszer, lapos tetőre telepítve, 1 kWp-ra vetített rendszer egységből építve, Panziónál 10 kWp, Étteremnél 3 kWp teljesítményig, ami tartalmaz invertert, napelem modult tetősíkból kiemelt tartószerkezeten, hálózati invertert, szolár kábel szettet és megfelelő keresztmetszetű AC oldali kábelezést védőcsőben ill. kábelcsatornában, szerelvényeket, DC és AC oldali típusú túláram és túlfeszültség védelmet. B) Energiahatékonyság javítására vonatkozó tevékenységek: I. Az épületek hőtechnikai adottságainak javítása, hőveszteségének csökkentése a) Fűtött és fűtetlen teret elválasztó, nem nyílászáró szerkezetnek minősülő épülethatároló szerkezetek hőszigetelése A külső falakra 15cm eps hőszigetelés kerül, dryvit rendszerben. A lábazati falak 15cm xps hőszigetelést kapnak a hőhídhatás csökkentésére. Mindkét épület esetében a lapos tetős épületrész tetőszerkezete a meglévő korszerűtlen lapostetős szerkezetre 25cm eps hőszigetelést és új vízszigetelést kap, mechanikai rögzítéssel, páratechnikai réteggel, és új kiegészítő bádogozásokkal. b) Fűtött és fűtetlen teret elválasztó, nyílászáró szerkezetnek minősülő épülethatároló szerkezetek cseréje / energia-megtakarítást eredményező korszerűsítése Panzió épület esetében a még korszerűtlen kültéri nyílászárók cseréje antracit színű műanyag szerkezetekre, hőszigetelt, fokozott légzárású ablak és ajtó cseréje meglévő falnyílásba, tömítés nélkül (szerelvényezve, finombeállítással) -3db 120x150 cm ablak -10 db 143x150 cm ablak -34 db 90x120 cm ablak -hatkamrás profil, egyszárnyú, oldaltnyíló, REHAU GENEO MD szálerősítéses profilú nyíló ajtó: 2 db 100x230 cm II. Épületek fűtési, hűtési és használati melegvíz-rendszereinek korszerűsítése Az épületek korábban korszerűsített split klímás és infrapaneles fűtési és hűtési rendszerei a mai technológiai színvonalhoz intelligens vezérlés kiépítésével kerülnek kiegészítésre. Ezen kívül a cég figyelmet fordít a kötelező nyilvánosság, valamint az esélyegyenlőség és környezetvédelmi szempontok érvényesítésével kapcsolatos elvárásokra is. A projektmenedzsment több éves tapasztalattal rendelkezik különböző nagyságrendű megújuló energia használatát, energiahatékonyság növelését célzó épületenergetikai fejlesztések előkészítésében, lebonyolításában és elszámolásában. A projekt készítésekor figyelembe vételre kerültek a Felhívás műszaki, szakmai tartalommal kapcsolatos elvárásai. A projekt költségvetése a 3.4.1.1 pontban szereplő elszámolható fajlagos költségek figyelembe vételével került összeállításra a hatékony és eredményes pénzgazdálkodás elvét figyelembe véve. (Hungarian)
    0 references
    In connection with the planned investment of the company, the building was previously surveyed, on the basis of which the construction plan was completed: blueprints, technical specifications, photo documentation and static expertise. It was established that the works were not subject to a building permit. With the involvement of Zoltán Melegh energy expert, the certified energy certificate for the (initial) state of the building prior to the implementation of the project and the calculations recording the (intermediate) state of play and the (planned) state after the realisation of the investment were completed. The main activities to be carried out under the project are: 3.1.1. Self-eligible activities (A) Activities aimed at increasing the use of renewable energy: III. Installing a solar panel system, installing a complete solar (photovoltaic) system, connecting it to the electricity grid. Mono or polycrystalline solar panel system, installed on a flat roof, built from 1 kWp projection unit, at Pension 10 kWp, at Restaurant up to 3 kWp, which includes inverter, solar panel module on a support structure highlighted from roof plane, network inverter, solar cable set and AC side cabling with suitable cross section in protective tube or cable channel, fittings, DC and AC side-type over current protection and overvoltage protection. Activities to improve energy efficiency: I. I. Improve the thermal capabilities of buildings and reduce their heat loss a) Thermal insulation of building envelopes that are not considered as windows and windows separating a heated and unheated space The outer walls are covered by 15 cm eps thermal insulation in a dryvit system. The plinth walls receive 15 cm xps thermal insulation to reduce the thermal bridge effect. In the case of both buildings, the roof structure of the flat roof part of the building will receive 25 cm eps thermal insulation and new waterproofing for the existing unmoderated flat roof structure with mechanical fixtures, vapor engineering layers and new additional tins. b) Replacement of building envelopes classified as doors and windows separating a heated and unheated space/upgrading of energy savings in the Pension building, replacement of still outdated outdoor doors and windows for anthracite-coloured plastic structures, replacement of heat-insulated, enhanced air-tight window and door into an existing wall opening, without sealing (assembled, finely adjusted) -3pcs 120x150 cm window -10 pcs 143x150 cm window -34 pcs 90x120 cm window -six-chamber profile, single-wing, side-opening, REHAU GENEO MD fibre-reinforced opening door: 2 pcs 100x230 cm II. Modernisation of heating, cooling and domestic hot water systems in buildings The previously upgraded split-air and infra-panel heating and cooling systems are complemented by the development of intelligent control to today’s technological standards. In addition, the company pays attention to the requirements of mandatory publicity, equal opportunities and environmental protection. Project management has several years of experience in preparing, managing and accounting for building energy developments aimed at using renewable energy of different scales and increasing energy efficiency. The technical and professional content requirements of the Call have been taken into account when preparing the project. The budget of the project was drawn up taking into account the eligible unit costs set out in point 3.4.1.1, taking into account the principle of sound financial management. (English)
    8 February 2022
    0 references
    Dans le cadre de l’investissement prévu de l’entreprise, le bâtiment a fait l’objet d’une enquête préalable, sur la base de laquelle le plan de construction a été achevé: plans, spécifications techniques, documentation photographique et expertise statique. Il a été établi que les travaux n’étaient pas soumis à un permis de construire. Avec la participation de Zoltán Melegh expert en énergie, le certificat énergétique certifié pour l’état (initial) du bâtiment avant la mise en œuvre du projet et les calculs enregistrant l’état (intermédiaire) et l’état (prévu) après la réalisation de l’investissement ont été achevés. Les principales activités à mener dans le cadre du projet sont les suivantes: 3.1.1. Activités auto-éligibles (A) Activités visant à accroître l’utilisation des énergies renouvelables: III. Installation d’un système de panneaux solaires, installation d’un système solaire complet (photovoltaïque), le reliant au réseau électrique. Système de panneaux solaires mono ou polycristallin, installé sur un toit plat, construit à partir d’une unité de projection de 1 kWp, à Pension 10 kWp, au restaurant jusqu’à 3 kWp, qui comprend un onduleur, un module de panneau solaire sur une structure de support mise en évidence par le plan du toit, un onduleur de réseau, un ensemble de câbles solaires et un câblage latéral AC avec section transversale appropriée dans un tube de protection ou un canal de câble, des raccords, un côté DC et AC sur protection contre le courant et une protection contre les surtensions. Activités visant à améliorer l’efficacité énergétique: I. I. Améliorer les capacités thermiques des bâtiments et réduire leur perte de chaleur a) Isolation thermique des enveloppes de bâtiment qui ne sont pas considérées comme des fenêtres et des fenêtres séparant un espace chauffé et non chauffé Les murs extérieurs sont recouverts d’une isolation thermique de 15 cm eps dans un système Dryvit. Les parois du socle reçoivent une isolation thermique de 15 cm xps pour réduire l’effet de pont thermique. Dans le cas des deux bâtiments, la structure du toit de la partie du toit plat de l’immeuble recevra une isolation thermique de 25 cm eps et une nouvelle étanchéité pour la structure existante de toit plat non modéré avec des appareils mécaniques, des couches d’ingénierie de vapeur et de nouvelles boîtes supplémentaires. b) Remplacement des enveloppes de bâtiment classées comme portes et fenêtres séparant un espace chauffé et non chauffé/mise à niveau des économies d’énergie dans le bâtiment des pensions, remplacement des portes extérieures et fenêtres encore désuètes pour les structures en plastique anthracite, remplacement d’une fenêtre et d’une porte étanches à l’air renforcée à la chaleur dans une ouverture murale existante, sans étanchéité (montée, finement ajustée) -3pcs 120x150 cm fenêtre -10 pcs 143x150 cm fenêtre -34 pcs 90x120 cm fenêtre -Six chambres profilé, simple aile, ouverture latérale, REHAU GENEO MD porte d’ouverture renforcée: 2 pièces 100x230 cm II. Modernisation des systèmes de chauffage, de refroidissement et d’eau chaude domestique dans les bâtiments Les systèmes de chauffage et de refroidissement à deux airs et à infra-panneaux précédemment modernisés sont complétés par le développement d’un contrôle intelligent conforme aux normes technologiques actuelles. En outre, l’entreprise s’intéresse aux exigences de publicité obligatoire, d’égalité des chances et de protection de l’environnement. La gestion de projet possède plusieurs années d’expérience dans la préparation, la gestion et la comptabilité des développements énergétiques des bâtiments visant à utiliser des énergies renouvelables à différentes échelles et à accroître l’efficacité énergétique. Les exigences techniques et professionnelles de l’appel ont été prises en compte lors de la préparation du projet. Le budget du projet a été établi en tenant compte des coûts unitaires éligibles énoncés au point 3.4.1.1, en tenant compte du principe de bonne gestion financière. (French)
    10 February 2022
    0 references
    Harkány, Baranya
    0 references

    Identifiers

    GINOP-4.1.4-19-2020-02164
    0 references