Building energy development at the site of SZÁV-I. LTD. (Q3934529)

From EU Knowledge Graph
Revision as of 22:41, 14 February 2022 by DG Regio (talk | contribs) (‎Removed claims)
Jump to navigation Jump to search
Project Q3934529 in Hungary
Language Label Description Also known as
English
Building energy development at the site of SZÁV-I. LTD.
Project Q3934529 in Hungary

    Statements

    0 references
    10 August 2020
    0 references
    12 March 2021
    0 references
    "SZÁV-I." Szállítmányozó és Szolgáltató Korlátolt Felelősségű Társaság
    0 references
    0 references

    47°40'29.57"N, 21°41'9.78"E
    0 references
    Jelen projekt keretében a vállalkozás Hajdúhadház, Lóger utca 2. szám alatt található (hrsz.: 0202/1) épületének energetikai fejlesztése tervezett. A projekt részeként sor kerül az épület hőtechnikai adottságainak javítását, hőveszteségének csökkentését célzó, alábbi tevékenységekre (B. I. tevékenység): a) Fűtött és fűtetlen teret elválasztó, nem nyílászáró szerkezetnek minősülő épülethatároló szerkezetek hőszigetelése és b) Fűtött és fűtetlen teret elválasztó, nyílászáró szerkezetnek minősülő épülethatároló szerkezetek cseréje, energia-megtakarítást eredményező korszerűsítése. A projekt keretében az épület külső homlokzatának utólagos hőszigetelése tervezett 15 cm vastag EPS hőszigetelő anyaggal, valamint a padlásfödém kerül szigetelésre 20 cm vastagságban. A meglévő, nem műanyag külső nyílászárók cseréje is megtörténik. A fejlesztés részét képezi továbbá az A) Megújuló energiafelhasználás növelését célzó tevékenységeken belül a „III. Napelemes rendszer telepítése hálózati villamosenergia-termelés céljából, kizárólag a fejlesztésben érintett épület és az abban folyó gazdasági-termelési folyamatok villamosenergia-ellátásához” tevékenység. Ez a napelemes rendszer 59,85 kW-os teljesítményű lesz. A projekt keretében 210 db 285 Wp teljesítményű napelem felhelyezése tervezett (210 * 0,285 kWp = 59,85 kWp), ezekhez kapcsolódóan 2 db Fronius ECO 25.0-3-M 3 fázisú inverter kerül beszerzésre, melyeknek fő feladata hogy a napelemek által előállított egyenáramot a közüzemi hálózatnak megfelelő feszültségű és frekvenciájú váltakozó árammá alakítsa át, amely ezt követően alkalmas az elektromos hálózatban történő továbbításra vagy akár helyi felhasználásra is. Egyéb tevékenységet nem kívánunk elszámolni a projekt keretein belül. A projekt költségvetése a piaci árakhoz igazodóan, reális és takarékos módon lett összeállítva. A Felhívásban található – jelen projekt szempontjából releváns - belső korlát figyelembe lett véve, miszerint 50 kWp névleges teljesítmény feletti a napelemes rendszer költsége nem haladhatja meg a 300.000 Ft/kWp értéket, valamint a födémhez kapcsolódó kőzetgyapot hőszigetelés nem haladja meg a 8.400 Ft/m2-t. A homlokzat hőszigetelését tekintve a polisztirol hőszigetelés költsége nem haladja meg a 11.600 Ft/m2 értéket. Nyílászárók cseréjét tekintve a cserélendő nyílászárók költsége nem haladja meg a 67.600 Ft/m2 értéket, valamint a szekcionált ipari kapu tekintetében a 75.800 Ft/m2 értéket. A projekt megfelelően előkészített, energetikus bevonásával elkészültek az energetikai tanúsítványok, a szakértői nyilatkozat a releváns energetikai adatokkal kitöltésre került. Lehetséges kivitelező partnerekkel az egyeztetések megtörténtek, az általunk tervezett energetikai fejlesztés a projekt megvalósítási helyszínén kivitelezhető. A tervezett projekt nem építési engedély köteles, ugyanakkor a napelemes rendszer kapcsán az áramszolgáltatóval egyeztetés szükséges. A pályázati felhívás alapján a projektmenedzsmenti szolgáltatás nem számít elszámolható költségnek, ugyanakkor külső, több mint 15 éves projektmenedzsmenti tapasztalattal rendelkező szakcéggel megbízási szerződés került megkötésre e tevékenység sikeres ellátására. (Hungarian)
    0 references
    In the framework of this project, the company is located at 2 Hajdúhadház, Lóger Street (hrsz.: 0202/1) is planned for the energy development of its building. As part of the project, the following activities will be carried out to improve the building’s thermal capabilities and reduce heat loss (Activity B I): a) The thermal insulation of building envelopes other than doors and windows separating heated and unheated spaces, and b) replacement of building envelopes that are considered as doors and windows separating heated and unheated spaces, upgrading them to achieve energy savings. In the framework of the project, the subsequent thermal insulation of the exterior facade of the building is designed with 15 cm thick EPS insulation material, as well as the attic floor is insulated in 20 cm thickness. Existing non-plastic exterior doors and windows are also replaced. The development shall also include, within activities aimed at increasing the use of renewable energy, the "III. Installation of a solar system for the production of electricity in the grid, exclusively for the supply of electricity to the building concerned by the development and the economic-production processes in it' activity. This solar system will be 59.85 kW. As part of the project, the installation of 210 solar panels with a power of 285 Wp (210 * 0.285 kWp = 59.85 kWp) will be procured for 2 Fronius ECO 25.0-3-M phase inverters, the main task of which is to convert the DC power produced by the solar panels into alternating current at voltage and frequency corresponding to the public utility network, which is then suitable for transmission in the power grid or even for local use. We do not intend to account for any other activity within the framework of the project. The project’s budget has been compiled in a realistic and cost-efficient way in line with market prices. The internal limit found in the Call, which is relevant to the present project, has been taken into account, according to which the cost of the solar system above 50 kWp must not exceed HUF 300,000/kWp, and the thermal insulation of stone wool linked to the slab does not exceed HUF 8.400/m². As regards the thermal insulation of the facade, the cost of polystyrene thermal insulation does not exceed HUF 11.600/m². As regards the replacement of doors and windows, the cost of the doors and windows to be replaced does not exceed HUF 67 600/m², and HUF 75 800/m² in the case of sectioned industrial gates. The energy certificates have been completed with the involvement of the project properly prepared and energeticly involved, and the expert statement has been completed with the relevant energy data. The negotiations with potential implementing partners have taken place, the energy development planned by us can be carried out at the implementation site of the project. The planned project is not required to build a building permit, however, in relation to the solar system, consultation with the electricity supplier is required. According to the call for proposals, the project management service is not considered as an eligible cost, but an external professional company with more than 15 years of experience in project management has been awarded a contract for the successful performance of this activity. (English)
    8 February 2022
    0 references
    Dans le cadre de ce projet, l’entreprise est située au 2 Hajdúhadház, rue Lóger (hrsz.: 0202/1) est prévue pour le développement énergétique de son bâtiment. Dans le cadre du projet, les activités suivantes seront menées pour améliorer les capacités thermiques du bâtiment et réduire les pertes de chaleur (activité B I): a) L’isolation thermique des enveloppes des bâtiments autres que les portes et les fenêtres séparant les espaces chauffés et non chauffés et b) le remplacement des enveloppes de bâtiment considérées comme des portes et des fenêtres séparant les espaces chauffés et non chauffés, en les modernisant pour réaliser des économies d’énergie. Dans le cadre du projet, l’isolation thermique ultérieure de la façade extérieure du bâtiment est conçue avec un matériau d’isolation EPS de 15 cm d’épaisseur, ainsi que le plancher du grenier est isolé en 20 cm d’épaisseur. Les portes et fenêtres extérieures non plastiques existantes sont également remplacées. Le développement inclut également, dans le cadre des activités visant à accroître l’utilisation des énergies renouvelables, le «III». Installation d’un système solaire pour la production d’électricité dans le réseau, exclusivement pour la fourniture d’électricité au bâtiment concerné par le développement et les processus de production économique dans son activité. Ce système solaire sera de 59,85 kW. Dans le cadre du projet, l’installation de 210 panneaux solaires d’une puissance de 285 Wp (210 * 0,285 kWp = 59,85 kWp) sera achetée pour 2 onduleurs de phase Fronius ECO 25.0-3-M, dont la tâche principale est de convertir l’énergie CC produite par les panneaux solaires en courant alternatif à la tension et à la fréquence correspondant au réseau d’utilité publique, qui est alors adapté pour la transmission dans le réseau électrique ou même pour une utilisation locale. Nous n’avons pas l’intention de rendre compte de toute autre activité dans le cadre du projet. Le budget du projet a été établi de manière réaliste et rentable, conformément aux prix du marché. La limite interne constatée dans l’appel, qui est pertinente pour le présent projet, a été prise en compte, selon laquelle le coût du système solaire supérieur à 50 kWp ne doit pas dépasser 300 000 HUF/kWp, et l’isolation thermique de la laine de pierre liée à la dalle ne dépasse pas 8 400 HUF/m². En ce qui concerne l’isolation thermique de la façade, le coût de l’isolation thermique en polystyrène n’excède pas 11,600 HUF/m². En ce qui concerne le remplacement des portes et fenêtres, le coût des portes et fenêtres à remplacer ne dépasse pas 67 600 HUF/m² et 75 800 HUF/m² pour les portes industrielles sectionnées. Les certificats énergétiques ont été complétés avec la participation du projet correctement préparé et énergiquement impliqué, et la déclaration d’expert a été complétée avec les données énergétiques pertinentes. Les négociations avec d’éventuels partenaires de mise en œuvre ont eu lieu, le développement énergétique prévu par nous peut être réalisé sur le site de mise en œuvre du projet. Le projet prévu n’est pas requis pour la construction d’un permis de construire, cependant, en ce qui concerne le système solaire, il est nécessaire de consulter le fournisseur d’électricité. Selon l’appel à propositions, le service de gestion de projet n’est pas considéré comme un coût éligible, mais une entreprise professionnelle externe ayant plus de 15 ans d’expérience en gestion de projet a obtenu un contrat pour la bonne exécution de cette activité. (French)
    10 February 2022
    0 references
    Hajdúhadház, Hajdú-Bihar
    0 references

    Identifiers

    GINOP-4.1.4-19-2020-01229
    0 references