Project Q2056984 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | (10360.14072017.115000060) LOC. CARRAIA |
Project Q2056984 in Italy |
Statements
221,440.9 Euro
0 references
738,136.34 Euro
0 references
30.0 percent
0 references
30 March 2018
0 references
30 March 2020
0 references
16 November 2020
0 references
COMUNE DI CALENZANO
0 references
GLI INTERVENTI PREVISTI, FINALIZZATI AL RISPARMIO ENERGETICO, OLTRE A QUELLI EDILI COMPLEMENTARI ED ALTRI DEL COMPLESSO SCOLASTICO SONO I SEGUENTI:- INSTALLAZIONE NUOVA POMPA DI CALORE PER FUNZIONAMENTO IBRIDO CON CALDAIA A METANO ESISTENTE, MODIFICHE SUGLI IMPIANTI DI DISTRIBUZIONE ED EMISSIONE DELL'IMPIANTO DI RISCALDAMENTO ED ALLACCIAMENTI ELETTRICI;- NUOVO SISTEMA DI TELECONTROLLO/TELEGESTIONE, MONITORAGGIO ENERGETICO E DIMMERIZZAZIONE CORPI ILLUMINANTI;- SOSTITUZIONE INFISSI ESISTENTI, CON DEI NUOVI CON DOPPIO VETRO E TELAIO IN ALLUMINIO A TAGLIO TERMICO PER TUTTO IL FABBRICATO;- REALIZZAZIONE DI CAPPOTTO TERMICO ESTERNO PER TUTTO IL FABBRICATO;- INSTALLAZIONE DI FRANGISOLE SU ALCUNE FINESTRE DEL COMPLESSO PER RIDUZIONE SOLEGGIAMENTO INTERNO;- REALIZZAZIONE DI TETTO VENTILATO PER RIDUZIONE SURRISCALDAMENTO ESTIVO NELLA PORZIONE CHE OSPITA LA SCUOLA MATERNA (Italian)
0 references
THE MEASURES ENVISAGED, WITH THE AIM OF SAVING ENERGY, IN ADDITION TO THE ADDITIONAL CONSTRUCTION AND OTHER COMPONENTS OF THE SCHOOL COMPLEX, ARE AS FOLLOWS: — NEW HEAT PUMP INSTALLATION FOR HYBRID OPERATION WITH EXISTING METHANE BOILER, CHANGES TO THE HEATING SYSTEM AND THE INSTALLATION OF THE HEATING SYSTEM AND ELECTRICAL CONNECTIONS; — NEW REMOTE MANAGEMENT, ENERGY MONITORING AND DIME SYSTEM; — REPLACEMENT OF EXISTING FIXTURES, WITH NEW, WITH TWO NEW ONES WITH DOUBLE GLASS AND THERMAL CUT ALUMINIUM FRAME FOR THE ENTIRE BUILDING; — INSTALLATION OF EXTERNAL THERMAL COAT OVER THE ENTIRE BUILDING; — ERECTION OF FRANGISOLE ON SOME WINDOWS OF THE COMPLEX FOR INDOOR REDUCTION; — IMPLEMENTATION OF VENTILATED HEATING CEILING FOR SUMMER HEATING IN THE KINDERGARTEN SECTION (English)
0 references
LES INTERVENTIONS PRÉVUES, DESTINÉES À ÉCONOMISER L’ÉNERGIE, EN PLUS DES BÂTIMENTS COMPLÉMENTAIRES ET D’AUTRES DU COMPLEXE SCOLAIRE SONT LES SUIVANTES:- INSTALLATION D’UNE NOUVELLE POMPE À CHALEUR HYBRIDE AVEC CHAUDIÈRE À MÉTHANE EXISTANTE, MODIFICATION DES SYSTÈMES DE DISTRIBUTION ET D’ÉMISSION DU SYSTÈME DE CHAUFFAGE ET DE RACCORDEMENT ÉLECTRIQUE;- NOUVEAU SYSTÈME DE TÉLÉCOMMANDE/TÉLÉGESTION, DE SURVEILLANCE DE L’ÉNERGIE ET DE GRADATION DES STRUCTURES D’ÉCLAIRAGE;- REMPLACEMENT DES APPAREILS EXISTANTS, PAR DE NOUVEAUX PAR UN DOUBLE CADRE DE COUPE THERMIQUE EN VERRE ET EN ALUMINIUM POUR L’ENSEMBLE DU BÂTIMENT;- RÉALISATION D’UNE COUCHE THERMIQUE EXTERNE POUR L’ENSEMBLE DU BÂTIMENT;- INSTALLATION D’ÉCRANS SOLAIRES SUR CERTAINES FENÊTRES DU COMPLEXE POUR LA RÉDUCTION DE L’ENSOLEILLEMENT INTERNE;- RÉALISATION D’UN TOIT VENTILÉ POUR RÉDUIRE LA SURCHAUFFE ESTIVALE DANS LA PARTIE QUI ABRITE LA MATERNELLE (French)
16 December 2021
0 references
DE GEPLANDE INTERVENTIES, GERICHT OP ENERGIEBESPARING, IN AANVULLING OP DE COMPLEMENTAIRE GEBOUWEN EN ANDERE VAN HET SCHOOLCOMPLEX ZIJN DE VOLGENDE:- INSTALLATIE VAN NIEUWE WARMTEPOMP VOOR HYBRIDE WERKING MET BESTAANDE METHAANKETEL, MODIFICATIES VAN DE DISTRIBUTIE- EN EMISSIESYSTEMEN VAN HET VERWARMINGSSYSTEEM EN ELEKTRISCHE AANSLUITINGEN;- NIEUW SYSTEEM VAN AFSTANDSBEDIENING/TELEMANAGEMENT, ENERGIEBEWAKING EN DIMMEN VERLICHTINGSLICHAMEN;- VERVANGING VAN BESTAANDE ARMATUREN, DOOR NIEUWE MET DUBBEL GLAS EN ALUMINIUM THERMISCH SNIJKADER VOOR HET GEHELE GEBOUW;- REALISATIE VAN EXTERNE THERMISCHE JAS VOOR HET HELE GEBOUW;- INSTALLATIE VAN ZONNESCHERMEN OP SOMMIGE RAMEN VAN HET COMPLEX VOOR INTERNE ZONVERMINDERING;- REALISATIE VAN GEVENTILEERD DAK VOOR DE VERMINDERING VAN ZOMEROVERVERHITTING IN HET GEDEELTE DAT DE KLEUTERSCHOOLHUIZEN (Dutch)
23 December 2021
0 references
DIE GEPLANTEN MASSNAHMEN ZUR EINSPARUNG VON ENERGIE, ZUSÄTZLICH ZU DEN ERGÄNZENDEN GEBÄUDEN UND ANDEREN DES SCHULKOMPLEXES SIND FOLGENDE:- INSTALLATION EINER NEUEN WÄRMEPUMPE FÜR DEN HYBRIDBETRIEB MIT BESTEHENDEN METHANKESSELN, ÄNDERUNGEN AN DEN VERTEILUNGS- UND EMISSIONSSYSTEMEN DES HEIZSYSTEMS UND ELEKTRISCHEN ANSCHLÜSSEN;- NEUES SYSTEM DER FERNSTEUERUNG/TELEMANAGEMENT, ENERGIEÜBERWACHUNG UND DIMMEN BELEUCHTUNGSKÖRPER;- ERSATZ VORHANDENER VORRICHTUNGEN MIT DOPPELGLAS- UND ALUMINIUM-THERMO-SCHNEIDERAHMEN FÜR DAS GESAMTE GEBÄUDE;- REALISIERUNG VON EXTERNEN WÄRMESCHICHTEN FÜR DAS GESAMTE GEBÄUDE;- INSTALLATION VON SONNENSCHUTZWÄNDEN AUF EINIGEN FENSTERN DES KOMPLEXES ZUR INTERNEN SONNENEINSPARUNG;- REALISIERUNG VON BELÜFTETEN DACH ZUR REDUZIERUNG DER SOMMERÜBERHITZUNG IN DEM TEILGARTEN DES KINDERGARTENS (German)
24 December 2021
0 references
LAS INTERVENCIONES PLANIFICADAS, DESTINADAS A AHORRAR ENERGÍA, ADEMÁS DE LOS EDIFICIOS COMPLEMENTARIOS Y OTROS DEL COMPLEJO ESCOLAR SON LAS SIGUIENTES:- INSTALACIÓN DE NUEVA BOMBA DE CALOR PARA OPERACIÓN HÍBRIDA CON CALDERA DE METANO EXISTENTE, MODIFICACIONES EN LOS SISTEMAS DE DISTRIBUCIÓN Y EMISIÓN DEL SISTEMA DE CALEFACCIÓN Y CONEXIONES ELÉCTRICAS;- NUEVO SISTEMA DE CONTROL REMOTO/TELEGESTIÓN, MONITORIZACIÓN DE ENERGÍA Y ATENUACIÓN DE CUERPOS DE ILUMINACIÓN;- SUSTITUCIÓN DE ACCESORIOS EXISTENTES, POR NUEVOS CON DOBLE VIDRIO Y MARCO DE CORTE TÉRMICO DE ALUMINIO PARA TODO EL EDIFICIO;- REALIZACIÓN DE UNA CAPA TÉRMICA EXTERNA PARA TODO EL EDIFICIO;- INSTALACIÓN DE PROTECTORES SOLARES EN ALGUNAS VENTANAS DEL COMPLEJO PARA LA REDUCCIÓN DEL SOL INTERNO;- REALIZACIÓN DE TECHO VENTILADO PARA REDUCIR EL SOBRECALENTAMIENTO VERANIEGO EN LA PORCIÓN QUE ALBERGA EL JARDÍN DE INFANCIA (Spanish)
25 January 2022
0 references
CALENZANO
0 references
Identifiers
E77D18000440006
0 references