West sector M0, Preparation of the section between main road 10 — motorway M1 (Q3942944)

From EU Knowledge Graph
Revision as of 14:13, 10 February 2022 by DG Regio (talk | contribs) (‎Changed an Item: Adding French translations)
Jump to navigation Jump to search
Project Q3942944 in Hungary
Language Label Description Also known as
English
West sector M0, Preparation of the section between main road 10 — motorway M1
Project Q3942944 in Hungary

    Statements

    0 references
    0 references
    1,888,638.43 Euro
    0.00276521 Euro
    4 December 2021
    0 references
    683,000,000 forint
    0 references
    2,196,548.57 Euro
    0.0027336256 Euro
    15 December 2021
    0 references
    803,529,411.765 forint
    0 references
    84.999999 percent
    0 references
    10 July 2017
    0 references
    30 December 2022
    0 references
    NIF Nemzeti Infrastruktúra Fejlesztő zártkörűen működő Részvénytársaság
    0 references
    0 references

    47°27'36.07"N, 18°57'15.05"E
    0 references
    A projekt keretein belül elkészül az M0 autóút 10 sz. főút és M1 autópálya közötti szakaszának Környezeti Hatástanulmánya, Natura 2000 dokumentációja és Megvalósíthatósági Tanulmánya. A projekt célja a tervezett szakaszra jogerős környezetvédelmi engedély megszerzése. A tervezett útszakasz mintegy 18 km hosszú 2x2 forgalmi sávos beton pályaszerkezetű autóút, ezen belül –nyomvonalváltozattól függően– összesen mintegy 5,5-9,8 km alagútban vezet. (Hungarian)
    0 references
    Within the framework of the project, the environmental impact assessment, the Natura 2000 documentation and the feasibility study of the section of the M0 motorway no. 10 and M1 motorway will be carried out. The aim of the project is to obtain a final environmental permit for the planned phase. The planned road section is about 18 km long by a 2x2 lane concrete road structure, with a total of 5.5-9.8 km of tunnels depending on the track. (English)
    9 February 2022
    0 references
    Dans le cadre du projet, l’évaluation des incidences sur l’environnement, la documentation Natura 2000 et l’étude de faisabilité du tronçon de l’autoroute M0 no 10 et M1 seront réalisées. L’objectif du projet est d’obtenir un permis environnemental final pour la phase prévue. Le tronçon routier prévu est d’environ 18 km de long par une structure de route en béton de 2x2, avec un total de 5,5-9,8 km de tunnels en fonction de la voie. (French)
    10 February 2022
    0 references
    Budaörs, Pest
    0 references

    Identifiers

    IKOP-1.1.0-15-2016-00024
    0 references