Energy modernisation of office buildings (Q3924933)

From EU Knowledge Graph
Revision as of 08:35, 10 February 2022 by DG Regio (talk | contribs) (‎Changed an Item: Adding French translations)
Jump to navigation Jump to search
Project Q3924933 in Hungary
Language Label Description Also known as
English
Energy modernisation of office buildings
Project Q3924933 in Hungary

    Statements

    0 references
    0 references
    24,043,000 forint
    0 references
    66,483.94 Euro
    0.00276521 Euro
    3 December 2021
    0 references
    146,132.516 Euro
    0.0027336256 Euro
    15 December 2021
    0 references
    53,457,399.502 forint
    0 references
    44.975864 percent
    0 references
    10 October 2018
    0 references
    30 September 2019
    0 references
    EVISION 2002 Építőipari Beruházó Korlátolt Felelősségű Társaság
    0 references
    0 references

    46°21'23.29"N, 17°47'19.28"E
    0 references
    A pályázó a fejlesztéssel érintett épület meglévő, korszerűtlen fa és műanyag nyílászárói helyére új, korszerű műanyag nyílászárókat kíván beépíteni. A fejlesztés keretében összesen 14 db hőszigetelt, fokozott légzárású, hatkamrás egyszárnyú bukó-nyíló ablak kerül beépítésre. Az ablakok 3 rétegű hőszigetelő üvegezéssel kerülnek beépítésre. A fejlesztés során 3 db hőszigetelt, fokozott légzárású, ötkamrás bejárati ajtó is beépítésre kerül. A fejlesztés keretében sor kerül az épület homlokzatának, lábazatának és padlásfödémjének szigetelésére is. A meglévő padlásfödém 2 deszkaréteg közötti 15 cm légréteggel, valamint az felett 6 cm sártapasztással bír. Ezen rétegrend kerül a fejlesztés keretében tovább fejlesztésre, melynek keretében a sárrétegre 0,1 cm-es páraáteresztő, hővisszaverő fólia kerül terítésre, 15 cm-es átfedéssel. A fóliára pedig 25 cm-es üveggyapot hőszigetelő lemez kerül elhelyezésre. Az épület lábazatára 16,85 m2 felületen 12 cm-es XPS zártcellás extrudált lábazati polisztirol kerül elhelyezésre, míg a meglévő 45 cm-es tömör égetett agyagtéglából lévő homlokzatra 15 cm-es EPS homlokzati hőszigetelő lemez kerül felhelyezésre 356,39 m2 felületen. A lábazat 2 mm műgyantás kötőanyagú vakolattal, a homlokzat pedig 2 mm dörzsölt szilikát vakolattal kerül bevonásra. A fűtéskorszerűsítés keretében 2 db 26 kW-os névleges teljesítményű, kondenzációs gázkazán kerül beépítésre, melyek az épület hatékony hőtermelését hivatottak biztosítani. Az épületben a hatékony hőleadást egyrészt térhálósított polietilén csőből kiépített padlófűtés, másrészt pedig lapradiátorok biztosítják. A padlófűtés megfelelő szabályozhatóságának biztosítása érdekében 2 db osztó-gyűjtő kerül beépítésre, míg a lapradiátorok szabályozását termosztatikus szelepfejek biztosítják. A pályázó a tevékenysége során a fejlesztéssel érintett ingatlanba felmerülő villamos energia igényt megújuló energiából kívánja biztosítani, melynek érdekében napenergiát hasznosító napelemes rendszert kíván telepíteni. A pályázat keretében egy 7 kW-os teljesítményű, villamos hálózatra kapcsolódó napelemes rendszer kerül a tetőre telepítésre. A meglévő tetőszerkezet statikailag alkalmas a tervezett napelemes rendszer telepítésére. A tervezett napelemes rendszer által éves szinten termelt villamos energia nem haladja meg az iroda által elhasznált villamos energia mennyiségét, azaz nem kerül sor értékesítésre. (Hungarian)
    0 references
    The applicant intends to install new, modern plastic doors and windows on the existing, outdated wood and plastic doors and windows of the building concerned by the development. As part of the development, a total of 14 insulated, high-air-tight, six-chamber single-wing windows are installed. The windows are installed with 3 layers of thermal insulation glazing. During the development, 3 insulated, air-tight, five-chamber entrance doors are installed. As part of the development, insulation of the facade, plinth and attic slab of the building will be carried out. The existing attic floor has an air layer of 15 cm between 2 layers of boards and 6 cm of mud adhesion above it. This layer order will be further developed as part of the development, in which a heat-reflecting film of 0.1 cm permeable humidity is placed on the mud layer, with an overlap of 15 cm. A 25 cm glass wool insulating sheet is placed on the foil. The building’s plinth is placed on a 16.85 m² surface of 12 cm XPS closed cell extruded plinth polystyrene, while the facade of the existing 45 cm solid burnt clay brick is placed on a 15 cm EPS facade thermal insulation plate on a 356.39 m² surface. The plinth is coated with 2 mm resin binding plaster and the facade is covered with 2 mm rubbed silicate plaster. As part of the heating upgrade, 2 condensation gas boilers with a nominal capacity of 26 kW are installed to ensure efficient heat generation of the building. Efficient heat release in the building is provided by underfloor heating from crosslinked polyethylene pipes and flat radiators. In order to ensure the proper control of the floor heating, 2 divider collectors are installed, while the control of the lap radiators is ensured by thermostatic valve heads. In the course of its activity, the applicant intends to provide the demand for electricity to the property affected by the development from renewable energy, in order to install a solar system using solar energy. In the framework of the tender, a 7 kW solar grid-connected solar system will be installed on the roof. The existing roof structure is statically suitable for the installation of the planned solar system. The annual electricity generated by the planned solar system does not exceed the amount of electricity consumed by the office, i.e. no sale takes place. (English)
    8 February 2022
    0 references
    La requérante a l’intention d’installer de nouvelles portes et fenêtres en plastique modernes sur les portes et fenêtres en bois et en plastique existantes et dépassées du bâtiment concerné par le développement. Dans le cadre du développement, un total de 14 fenêtres isothermes, haute hermétique, six chambres sont installées. Les fenêtres sont installées avec 3 couches de vitrage isolant thermique. Au cours du développement, 3 portes d’entrée isolées, étanches à l’air et à cinq chambres sont installées. Dans le cadre du développement, l’isolation de la façade, du socle et de la dalle du grenier du bâtiment sera réalisée. Le plancher du grenier existant a une couche d’air de 15 cm entre 2 couches de planches et 6 cm d’adhérence de boue au-dessus. Cet ordre de couches sera développé dans le cadre du développement, dans lequel une pellicule thermoréfléchissante de 0,1 cm d’humidité perméable est placée sur la couche de boue, avec un chevauchement de 15 cm. Une feuille isolante en laine de verre de 25 cm est placée sur la feuille. Le socle du bâtiment est placé sur une surface de 16,85 m² de polystyrène extrudé à cellule fermée de 12 cm XPS, tandis que la façade de la brique existante en argile brûlée solide de 45 cm est placée sur une plaque isolante thermique de façade EPS de 15 cm sur une surface de 356,39 m². La plinthe est revêtue d’un plâtre de fixation en résine de 2 mm et la façade est recouverte d’un plâtre de silicate frotté de 2 mm. Dans le cadre de la modernisation du chauffage, 2 chaudières à gaz à condensation d’une puissance nominale de 26 kW sont installées pour assurer une production de chaleur efficace du bâtiment. Le dégagement de chaleur efficace dans le bâtiment est assuré par le chauffage par le sol à partir de tuyaux en polyéthylène réticulés et de radiateurs plats. Afin d’assurer le bon contrôle du chauffage au sol, 2 collecteurs de séparation sont installés, tandis que le contrôle des radiateurs de tour est assuré par des têtes de vanne thermostatiques. Dans le cadre de son activité, la requérante entend fournir la demande d’électricité au bien concerné par le développement à partir d’énergies renouvelables, afin d’installer un système solaire utilisant l’énergie solaire. Dans le cadre de l’appel d’offres, un système solaire de 7 kW raccordé au réseau solaire sera installé sur le toit. La structure existante du toit est statiquement adaptée à l’installation du système solaire prévu. L’électricité annuelle produite par le système solaire prévu ne dépasse pas la quantité d’électricité consommée par le bureau, c’est-à-dire qu’aucune vente n’a lieu. (French)
    10 February 2022
    0 references
    Kaposvár, Somogy
    0 references

    Identifiers

    GINOP-4.1.1-8-4-4-16-2017-00127
    0 references