Implementation of car seat cover production in Szirén Clothing Ltd. (Q3917959)

From EU Knowledge Graph
Revision as of 07:16, 10 February 2022 by DG Regio (talk | contribs) (‎Changed an Item: Adding French translations)
Jump to navigation Jump to search
Project Q3917959 in Hungary
Language Label Description Also known as
English
Implementation of car seat cover production in Szirén Clothing Ltd.
Project Q3917959 in Hungary

    Statements

    0 references
    0 references
    19,200,000 forint
    0 references
    53,092.03 Euro
    0.00276521 Euro
    3 December 2021
    0 references
    133,313.72 Euro
    0.0027336256 Euro
    14 December 2021
    0 references
    48,768,097.536 forint
    0 references
    39.370079 percent
    0 references
    10 June 2016
    0 references
    22 June 2016
    0 references
    SZIRÉN Ruházati Termelő és Kereskedő Korlátolt Felelősségű Társaság
    0 references
    0 references

    46°51'43.70"N, 20°33'7.74"E
    0 references
    Az új eszközök nélkül az autó üléshuzat nem gyártható, mindenképpen szükségesek az erre alkalmas gépek. A gyártási folyamat a megrendelőtől kapott kiszabott autó üléshuzat idomok összevarrását jelenti. Cégünk az összevarrt üléshuzatot szállítja a megrendelőnek. 1 db kész üléshuzat egy ülőrészből, és egy üléstámlából áll. Terveink szerint 10 géppel, és 10 fővel kezdjük a gyártást. A termelés meghatározott sorrendben szalagrendszerben folyik. A munkaállomások a technológia sorrendjében lesznek elhelyezve. A termék gyártási folyamata 40-45 varrodai műveletre lesz felosztva, ami azt jelenti, hogy a dolgozóknak 4-5 műveletet kell végezni. Terveink szerint a betanulási időszakot követően (3-4 hónap) havi 2-2,3 millió Ft-os árbevételt realizálunk. (Hungarian)
    0 references
    Without the new tools, the car seat cover cannot be manufactured, the suitable machines are absolutely necessary. The production process consists of sewing the imposed car seat cover shapes received from the customer. Our company delivers the stitched seat cover to the customer. 1 finished seat cover consists of a seating area and a seat back. According to our plans, we start production with 10 machines and 10 people. The production takes place in a bandage system in a specified order. The workstations will be placed in the order of technology. The production process of the product will be divided into 40-45 sewing operations, which means that the workers must carry out 4-5 operations. According to our plans, after the training period (3-4 months) we will realise a monthly turnover of HUF 2 to 2.3 million. (English)
    8 February 2022
    0 references
    Sans les nouveaux outils, le couvercle du siège auto ne peut pas être fabriqué, les machines appropriées sont absolument nécessaires. Le processus de production consiste à coudre les formes de couverture de siège d’auto imposées reçues du client. Notre société livre la housse de siège cousu au client. 1 housse de siège finie se compose d’un coin salon et d’un dossier. Selon nos plans, nous commençons la production avec 10 machines et 10 personnes. La production a lieu dans un système de bandage dans un ordre déterminé. Les postes de travail seront placés dans l’ordre de la technologie. Le processus de production du produit sera divisé en 40-45 opérations de couture, ce qui signifie que les travailleurs doivent effectuer 4-5 opérations. Selon nos plans, après la période de formation (3-4 mois) nous réaliserons un chiffre d’affaires mensuel de 2 à 2,3 millions de HUF. (French)
    10 February 2022
    0 references
    Szarvas, Békés
    0 references

    Identifiers

    GINOP-1.2.2-15-2015-00367
    0 references