Deepening of the approach and internal waters of the Gdynia Port – stages I and III and reconstruction of the port of Gdynia – stages II and III (Q85923)

From EU Knowledge Graph
Revision as of 04:18, 26 July 2022 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,)
Jump to navigation Jump to search
Project Q85923 in Poland
Language Label Description Also known as
English
Deepening of the approach and internal waters of the Gdynia Port – stages I and III and reconstruction of the port of Gdynia – stages II and III
Project Q85923 in Poland

    Statements

    0 references
    273,000,000.0 zloty
    0 references
    65,520,000.0 Euro
    13 January 2020
    0 references
    452,498,075.89 zloty
    0 references
    108,599,538.21 Euro
    13 January 2020
    0 references
    60.33 percent
    0 references
    1 January 2014
    0 references
    31 December 2022
    0 references
    ZARZĄD MORSKIEGO PORTU GDYNIA S.A.
    0 references
    0 references
    0 references

    54°30'13.7"N, 18°27'46.1"E
    0 references
    Projekt składa się z dwóch zadań podzielonych na etapy: Zadanie 1 – Pogłębianie toru podejściowego i akwenów wewnętrznych Portu Gdynia – etapy I i III Etap I – Przebudowa obrotnicy nr 2 z przebudową Nabrzeża Gościnnego Etap III – Pogłębianie akwenów wewnętrznych Portu Gdynia Zadanie 2 – Przebudowa nabrzeży w Porcie Gdynia Etap II – Przebudowa Nabrzeża Indyjskiego Etap III – Przebudowa Nabrzeża Helskiego (Polish)
    0 references
    The project consists of two tasks divided into stages: Task 1 – Deepening of the approach track and internal waters of the Gdynia Port – stages I and III stage I – Reconstruction of rotary turntable no. 2 with reconstruction of the Guest Waterfront Stage III – deepening of the internal waters of Gdynia Port Task 2 – Reconstruction of the waterfront at Gdynia Stage II – Reconstruction of the Indian Waterfront Stage III – Reconstruction of the Helska Waterfront (English)
    14 October 2020
    0 references
    Le projet se compose de deux tâches divisées en étapes: Activité 1 — Approfondissement de la voie d’approche et des eaux intérieures du Port de Gdynia — Étapes I et III Étape I — Reconstruction de la platine tournante no 2 avec la reconstruction du quai invité Étape III — Approfondissement des eaux intérieures du Port de Gdynia Tâche 2 — Reconstruction du quai dans le port de Gdynia Phase II — Reconstruction du quai indien étape III — Reconstruction du front de mer Hel (French)
    30 November 2021
    0 references
    Das Projekt besteht aus zwei Aufgaben, die in Phasen unterteilt sind: Aktivität 1 – Vertiefung des Anflugs und der inneren Gewässer des Hafens von Gdynia – Schritte I und III Stufe I – Rekonstruktion des Plattenspielers Nr. 2 mit dem Wiederaufbau des Guest Quay Stage III – Vertiefung der inneren Gewässer des Hafens von Gdynia Aufgabe 2 – Wiederaufbau des Kais im Hafen von Gdynia Stufe II – Wiederaufbau des indischen Kais Stufe III – Wiederaufbau der Hel Seafront (German)
    7 December 2021
    0 references
    Het project bestaat uit twee taken, verdeeld in fasen: Activiteit 1 — Verdieping van het naderingsspoor en de binnenwateren van de haven van Gdynia — Stappen I en III, fase I — Wederopbouw van de draaitafel nr. 2 met de wederopbouw van de Gastkade fase III — Verdieping van de binnenwateren van de haven van Gdynia taak 2 — Wederopbouw van de kade in de haven van Gdynia fase II — Wederopbouw van de Indiase kade fase III — Wederopbouw van de Hel Seafront (Dutch)
    16 December 2021
    0 references
    Il progetto consiste in due compiti suddivisi in fasi: Attività 1 — Approfondimento del tracciato di avvicinamento e delle acque interne del porto di Gdynia — Fasi I e III Fase I — Ricostruzione del giradischi n. 2 con la ricostruzione della banchina ospite Fase III — approfondimento delle acque interne del porto di Gdynia Task 2 — Ricostruzione della banchina nel porto di Gdynia Fase II — Ricostruzione della banchina indiana Stage III — Ricostruzione del lungomare Hel (Italian)
    16 January 2022
    0 references
    El proyecto consta de dos tareas divididas en etapas: Actividad 1 — Profundización de la vía de aproximación y aguas interiores del Puerto de Gdynia — Pasos I y III Etapa I — Reconstrucción de la mesa giratoria N.º 2 con la reconstrucción de la Etapa del Cuarteto Invitado III — Profundización de las aguas interiores del Puerto de Gdynia Tarea 2 — Reconstrucción del muelle en el Puerto de Gdynia Etapa II — Reconstrucción del muelle Indio Etapa III — Reconstrucción del frente marítimo Hel (Spanish)
    19 January 2022
    0 references
    Projektet består af to opgaver, der er opdelt i etaper: Opgave 1 › Uddybning af indflyvningsspor og indre farvande i Gdynia Havn trin I og III fase I â EUR Rekonstruktion af roterende pladespiller nr. 2 med rekonstruktion af Guest Waterfront Stage III âEUR uddybning af de indre farvande i Gdynia Port Task 2 â EUR Genopbygning af havnefronten ved Gdynia Stage II â EUR Genopbygning af Indian Waterfront Stage III â EUR Rekonstruktion af Helska Waterfront (Danish)
    26 July 2022
    0 references
    Το σχέδιο αποτελείται από δύο καθήκοντα που κατανέμονται σε στάδια: Εργασία 1 â EUR Εμβάθυνση της διαδρομής προσέγγισης και τα εσωτερικά ύδατα του λιμένα Gdynia â EUR στάδια Ι και ΙΙΙ στάδιο I â EUR Ανακατασκευή του περιστροφικού πικάπ αριθ. 2 με την ανακατασκευή του Guest Παραθαλάσσιο Στάδιο ΙΙΙ â EUR εμβάθυνση των εσωτερικών υδάτων της Gdynia Port Task 2 â EUR Ανασυγκρότηση της προκυμαίας στην Γδύνια Στάδιο ΙΙ â EUR Ανασυγκρότηση του Ινδικού Παραθαλάσσιο Στάδιο ΙΙΙ â EUR Ανασυγκρότηση της προκυμαίας Helska Waterfront (Greek)
    26 July 2022
    0 references
    Projekt se sastoji od dvije zadaće podijeljene u faze: Zadatak 1 Produbljenje pristupne staze i unutarnjih voda luke Gdynia â EUR faze I i III faza I. â EUR Rekonstrukcija rotacijskog okretnog br. 2 s rekonstrukcijom gosta na rivi Stage III â EUR produbljenje unutarnjih voda Gdynia Port Task 2 â EUR Rekonstrukcija rive na Gdynia Stage II â EUR Rekonstrukcija indijske rive Stage III â EUR Rekonstrukcija Helske rive (Croatian)
    26 July 2022
    0 references
    Proiectul constă în două sarcini împărțite în etape: Sarcina 1 Aprofundarea pistei de apropiere și a apelor interioare ale portului Gdynia etape I și III etapa I â EUR Reconstrucția plăcii turnante rotative nr. 2 cu reconstrucția oaspeților de pe malul mării Etapa III â EUR aprofundarea apelor interne ale Portului Gdynia Sarcina 2 â EUR Reconstrucție a frontului de apă la Gdynia Stage II â EUR Reconstrucție a frontului de apă indian Etapa III â EUR Reconstrucție a frontului Helska (Romanian)
    26 July 2022
    0 references
    Projekt pozostáva z dvoch úloh rozdelených do etáp: Úloha 1 â EUR Prehĺbenie prístupovej dráhy a vnútorných vôd prístavu Gdynia â EUR etapy I a III etapa I â EUR Rekonštrukcia rotačného gramofónu č. 2 s rekonštrukciou hosťa nábrežia etapy III â EUR prehĺbenie vnútorných vôd Gdynia Port Task 2 â EUR Rekonštrukcia nábrežia na Gdynia fáze II â EUR Rekonštrukcia indického nábrežia etapy III â EUR Rekonštrukcia nábrežia Helska nábrežia (Slovak)
    26 July 2022
    0 references
    Il-proġett jikkonsisti f’żewġ kompiti maqsuma fi stadji: Kompitu 1 â EUR Rendiment tal-binarju approċċ u l-ilmijiet interni tal-Port ta ‘Gdynia â EUR istadji I u III istadju I â EUR Rikostruzzjoni ta’ turntable no 2 rotatorji ma ‘rikostruzzjoni tal-Istadju Waterfront Guest III â EUR approfondiment tal-ilmijiet interni ta ‘Gdynia Port Task 2 â EUR Rikostruzzjoni tal-Waterfront fi Gdynia Stadju II Rikostruzzjoni tal-Indja Waterfront Stadju III â EUR Rikostruzzjoni tal-Helska Waterfront (Maltese)
    26 July 2022
    0 references
    O projeto consiste em duas tarefas divididas em fases: Tarefa 1 âEUR Aprofundamento da pista de aproximação e águas internas do Porto de Gdynia › Fases I e III da I âEUR Reconstrução da plataforma giratória rotativa n.º 2 com a reconstrução do Convidado Fase Waterfront III âEUR Aprofundamento das águas internas do Porto de Gdynia Tarefa 2 âEUR Reconstrução da orla em Gdynia Fase II âEUR Reconstrução da Fase III da beira-mar indiana âEUR Reconstrução da beira-mar Helska (Portuguese)
    26 July 2022
    0 references
    Hanke koostuu kahdesta tehtävästä, jotka on jaettu vaiheisiin: Tehtävä 1 âEUR Lähestymisradan ja Gdynian sataman sisäisten vesien syventäminen vaiheet I ja III vaihe I â EUR Pyörivä levysoitin nro 2 jälleenrakentaminen Vierasranta vaihe III â EUR syventäminen sisävesien Gdynian sataman tehtävä 2 â EUR Kunnostaminen rantaviivan Gdynia vaiheessa II â EUR Reconstruction of the Indian Waterfront Stage III âEUR Reconstruction of the Helska Waterfront (Finnish)
    26 July 2022
    0 references
    Projekt je sestavljen iz dveh nalog, razdeljenih v faze: Naloga 1 EUR Deepening of approach track and internal water of the Gdynia Port â EUR Stage I in III faza I â EUR Rekonstrukcija rotacijske gramofona št. 2 z obnovo gost Waterfront Stage III â EUR poglabljanje notranjih voda Gdynia Port Naloga 2 â EUR EUR Obnova obale na Gdynia Stage II â EUR â EUR â EUR â EUR Rekonstrukcijo indijske Waterfront Stage III â EUR Obnova Helska Waterfront (Slovenian)
    26 July 2022
    0 references
    Projekt se skládá ze dvou úkolů rozdělených do fází: Úkol 1 › Prohloubení přístupové dráhy a vnitřních vod přístavu Gdyně â EUR etapy I a III etapa I › Rekonstrukce otočného točnice č. 2 s rekonstrukcí hosta nábřeží etapy III â EUR Prohloubení vnitřních vod Gdyně Port Task 2 › Rekonstrukce nábřeží v Gdyni etapě II › Rekonstrukce indické nábřeží III › Rekonstrukce nábřeží Helska (Czech)
    26 July 2022
    0 references
    Projektą sudaro dvi užduotys, suskirstytos į etapus: Užduotis 1 â EUR Gilinimas artėjimo kelio ir vidaus vandenų Gdynės uosto I ir III stadijos I â EUR Rekonstrukcija rotacinio patefono Nr. 2 su rekonstrukcija Svečių Vandens pakrantėje III etapas â EUR gilinti vidaus vandenų Gdynės uosto užduotis 2 â EUR Atstatyti kranto prie Gdynės etapas II â EUR Rekonstrukcija Indijos Waterfront etapas III â EUR Rekonstrukcija Helska Waterfront III (Lithuanian)
    26 July 2022
    0 references
    Projekts sastāv no diviem uzdevumiem, kas sadalīti posmos: Uzdevums 1 EUR Padziļināšana pieejas trases un iekšējo ūdeņu Gdiņas ostas EUR posms I un III posms I â EUR Rekonstrukcija rotācijas Vinilplašu Nr. 2 ar rekonstrukciju Guest Waterfront posmā III â EUR padziļināšana iekšējo ūdeņu Gdiņas ostas uzdevums 2 â EUR Rekonstrukcija krastmalas pie Gdiņas posmā II â EUR Rekonstrukcija Indijas Waterfront posmā III â EUR Rekonstrukcija Helska Waterfront (Latvian)
    26 July 2022
    0 references
    Проектът се състои от две задачи, разделени на етапи: Задача 1 â EUR Deepening of the approach track and internal waters of the Gdynia Port â EUR етапи I и III етап I â EUR Реконструкция на ротационен грамофон № 2 с реконструкция на Гост Waterfront етап III â EUR задълбочаване на вътрешните води на Gdynia Port Task 2 â EUR Реконструкция на бреговата линия на Гдиня Етап II â EUR Реконструкция на индийския воден етап III â EUR Реконструкция на брега на Хелска (Bulgarian)
    26 July 2022
    0 references
    A projekt két szakaszból álló feladatból áll: Feladat A Gdynia kikötő megközelítési pályájának és belvizeinek elmélyítése I. és III. szakasz I. szakasza A 2. sz. forgóasztal rekonstrukciója a Guest Waterfront III. szakasz rekonstrukciójával Gdynia Port Task 2 belvizeinek mélyítésével â EUR Reconstruction of the waterfront in Gdynia II. szakasz â EUR Reconstruction of the Indian Waterfront Stage III â EUR Reconstruction of the Helska Waterfront (Hungarian)
    26 July 2022
    0 references
    Tá dhá thasc sa tionscadal agus iad roinnte ina gcéimeanna: Tasc 1 âEUR Deepening an rian cur chuige agus uiscí inmheánacha na céimeanna Gdynia Port â EUR I agus III céim I âEUR Atógáil na rotary turntable uimh. 2 le atógáil an Aoi Céim Waterfront III â EUR dhoimhniú na huiscí inmheánacha de Gdynia Port Tasc 2 âEUR Athfhoirgniú an Waterfront ag Gdynia Céim II âEUR Athfhoirgniú an Waterfront Indiach Céim III âEUR Athfhoirgniú an Waterfront Helska (Irish)
    26 July 2022
    0 references
    Projektet består av två uppgifter uppdelade i etapper: Uppgift 1 â EUR Fördjupning av inflygning spår och inre vatten i Gdynia Port â EUR steg I och III steg I â EUR Rekonstruktion av roterande skivspelare nr 2 med återuppbyggnad av Guest Waterfront steg III â EUR fördjupning av det inre vattnet i Gdynia Port uppgift 2 â EUR Rekonstruktion av vattnet vid Gdynia steg II â EUR Rekonstruktion av den indiska Waterfront steg III â EUR Rekonstruktion av Helska Waterfront (Swedish)
    26 July 2022
    0 references
    Projekt koosneb kahest etapist jagatud ülesandest: Ülesanne 1 Gdynia sadama I ja III etapi lähenemise raja ja sisevete süvendamine I ja III etapp I âEUR Rekonstrueerimine pöördpööratava nr 2 rekonstrueerimisega Külaliste veepiiri III etapi rekonstrueerimine Gdynia sadama sisevete süvendamine 2. Gdynia II etapi veepiiri rekonstrueerimine India veepiiri III etapi rekonstrueerimine âEUR Helska veepiiri rekonstrueerimine (Estonian)
    26 July 2022
    0 references

    Identifiers

    POIS.03.02.00-00-0070/18
    0 references
    4904
    0 references