Energy modernisation of the Liget Wellness and Conference Hotel in Deer (Q3925125)

From EU Knowledge Graph
Revision as of 18:10, 8 February 2022 by DG Regio (talk | contribs) (‎Changed an Item: Adding English translations)
Jump to navigation Jump to search
Project Q3925125 in Hungary
Language Label Description Also known as
English
Energy modernisation of the Liget Wellness and Conference Hotel in Deer
Project Q3925125 in Hungary

    Statements

    0 references
    0 references
    135,464,481 forint
    0 references
    374,587.74 Euro
    0.00276521 Euro
    3 December 2021
    0 references
    740,618.346 Euro
    0.0027336256 Euro
    15 December 2021
    0 references
    270,928,962.0 forint
    0 references
    50.0 percent
    0 references
    3 January 2019
    0 references
    15 December 2019
    0 references
    LIGET HOTEL Kereskedelmi és Szolgáltató Korlátolt Felelősségű Társaság
    0 references
    0 references

    46°51'43.70"N, 20°33'7.74"E
    0 references
    A projekt megvalósításának előkészítése a Felhívásban meghatározott és előírt szempontok alapján valósult meg. első lépésként piacfelmérésen alapuló 3 db árajánlat bekérésével megtörtént az energetikai szakértő cég kiválasztása. a nyertes ajánlattevő céggel kötött szerződés alapján a Felhívásban előírt jogosultsággal rendelkező szakértő helyszíni bejárást folytatott le, ami alapján elkészült az épületek energetikai jellemzőinek tanúsításáról szóló 176/2008. (VI. 30.) Korm. rendelet szerinti energetikai minőségtanúsítvány, és a fejlesztésre vonatkozó energetikai koncepciót. Elkészült a projektre vonatkozó árazatlan költségvetés, az épületgépész, és az építészeti műszaki leírás, ami megküldésre került az árajánlatkérés keretében a kiválasztott Ajánlattevők részére. A legalacsonyabb árat adó generálkivitelező cég árazott költségvetése alapján véglegessé vált a projekt elszámolható költsége. Ezt követően véglegesítésre került a támogatási kérelem, ami benyújtásra került. A projekt nem tartalmaz engedélyköteles tevékenységet, így engedélyező hatóságokkal való egyeztetés nem releváns. A projekt előkészítési költségei közt kiviteli tervezés is elszámolásra kerül, mivel az épületet eredetileg gázkazános fűtési rendszerrel kerültek kialakításra, továbbá vízhűtéses folyadékhűtő hivatott a hűtési energiát fedezni, de időközben Szarvas település távhőellátási rendszer került kialakításra, amelynek keretében a hotel is bekötésre került a hálózatba, párhuzamosan a gázkazános fűtési rendszerrel, és a fűtési rendszer egy jelenleg is bivalens kialakítású rendszer, amelyben a használati melegvíz igényeket a gázkazán hivatott fedezni. A gépészeti rendszer komplexitása miatt döntöttünk úgy, hogy a kivitelezési munkák kiviteli tervek alapján valósuljanak meg. A projektmenedzsment tevékenységet ellátó céget piacfelmérésen alapuló 3 árajánlat bekérésével választottuk ki, a támogatói döntést követően a nyertes ajánlatot adó cég feladata lesz a projekt határidőben történő lebonyolításának és elszámolásának koordinációja. A projekt kivitelezését műszaki ellenőr követi nyomon, aki az átadás-átvétel során igazolja a teljesítést, és azt, hogy a kivitelező betartotta a jogszabályi, és műszaki előírásokat. A projektmenedzsment feladata lesz a Pénzügyminisztérium Gazdaságfejlesztési Programok Végrehajtásáért Felelős Helyettes Államtitkárságával való kommunikáció, az elszámolások és szakmai beszámolók elkészítése és benyújtásra, az esetlegesen felmerülő változások kezelése az EPTK felületen keresztül. A projektmenedzsment szervezet rendelkezik a megfelelő kompetenciával, és releváns, Európai Uniós forrásból megvalósuló energetikai projektek lebonyolításában szerzett tapasztalatokkal. A Projekt adatlap „Projekt részletes bemutatása” funkcióban kiválasztott célterület, projektelem bemutatása karakterkorlátozás miatt külön cégszerűen aláírt nyilatkozatban került csatolásra. (Hungarian)
    0 references
    The preparation of the project was carried out on the basis of the criteria defined and specified in the call. As a first step, the energy expert company was selected by requesting 3 quotations based on a market survey. On the basis of the contract concluded with the successful bidder, the expert with the right to perform the call carried out an on-site visit, on the basis of which 176/2008 on the certification of the energy characteristics of the buildings was completed. (VI. 30.) an energy quality certificate in accordance with Government Decree No 30/2001 and the energy concept for development. The unpriced budget for the project, the building engineer and the architectural technical specifications were completed, which was sent to the selected bidders in the framework of the request for quotation. Based on the priced budget of the general contractor with the lowest price, the eligible cost of the project has become final. The aid application was then finalised and submitted. The project does not involve any activity subject to authorisation, so consultation with the authorising authorities is not relevant. As part of the project’s preparation costs, construction planning is also accounted for, since the building was originally built with a gas boiler heating system, and a water-cooled liquid cooler is intended to cover the cooling energy, but in the meantime the district heating system in Szarvas has been set up, in which the hotel was connected to the network, in parallel with the gas boiler heating system, and the heating system is a system with bivalent design, in which the domestic hot water needs are covered by the gas boiler. Due to the complexity of the mechanical system, we decided that the construction works should be carried out on the basis of construction plans. The company carrying out the project management activity was selected by requesting 3 quotations based on a market survey. After the decision of the sponsor, the company that gave the winning bid will be responsible for the coordination of the project’s timely implementation and accounting. The implementation of the project is monitored by a technical inspector, who certifies the performance during the handover and that the contractor has complied with the legal and technical requirements. The task of project management will be to communicate with the Deputy State Secretariat of the Ministry of Finance for the implementation of Economic Development Programmes, to prepare and submit accounts and professional reports, to manage any changes that may arise through the EPTK interface. The project management organisation has the appropriate competence and relevant experience in implementing EU-funded energy projects. Due to character limitation, the project data sheet was attached in a separate declaration signed in the “Detailed presentation of the project” function. (English)
    8 February 2022
    0 references
    Szarvas, Békés
    0 references

    Identifiers

    GINOP-4.1.2-18-2018-00212
    0 references