URGENT INTERVENTIONS FOR THE SAFETY OF THE BELL TOWER, THE PORTIONS OF MASONRY ON VIA MAZZINI AND COMPLETION OF THE REMOVAL OF THE RUBBLE OF THE BASILICA OF SAN BENEDETTO. (Q4279979)

From EU Knowledge Graph
Revision as of 16:33, 4 February 2022 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
Jump to navigation Jump to search
Project Q4279979 in Italy
Language Label Description Also known as
English
URGENT INTERVENTIONS FOR THE SAFETY OF THE BELL TOWER, THE PORTIONS OF MASONRY ON VIA MAZZINI AND COMPLETION OF THE REMOVAL OF THE RUBBLE OF THE BASILICA OF SAN BENEDETTO.
Project Q4279979 in Italy

    Statements

    0 references
    180,000.0 Euro
    0 references
    360,000.0 Euro
    0 references
    50.0 percent
    0 references
    MIBAC - UFFICIO SOPRINTENDENTE SPECIALE PER LE AREE COLPITE DAL SISMA DEL 24 AGOSTO 2016
    0 references
    0 references
    0 references
    INTERVENTI IN SOMMA URGENZA PER LA MESSA IN SICUREZZA DEL CAMPANILE, DELLE PORZIONI DI MURATURA SU VIA MAZZINI E COMPLETAMENTO DELLA RIMOZIONE DELLE MACERIE DELLA BASILICA DI SAN BENEDETTO. FASE 1 "INTERVENTI VOLTI ALLA MESSA IN SICUREZZA, CANTIERIZZAZIONE E SVOLGIMENTO DI INDAGINI PRELIMINARI¿. SOTTO FASE 2 (Italian)
    0 references
    URGENT INTERVENTIONS FOR THE SAFETY OF THE BELL TOWER, THE PORTIONS OF MASONRY ON VIA MAZZINI AND COMPLETION OF THE REMOVAL OF THE RUBBLE OF THE BASILICA OF SAN BENEDETTO. PHASE 1 "INTERVENTIONS AIMED AT SECURING, SHIPBUILDING AND CARRYING OUT PRELIMINARY INVESTIGATIONS. SUB-PHASE 2 (English)
    2 February 2022
    0 references
    INTERVENTIONS URGENTES POUR LA SÉCURITÉ DU CLOCHER, LES PORTIONS DE MAÇONNERIE SUR VIA MAZZINI ET L’ACHÈVEMENT DE L’ENLÈVEMENT DES DÉCOMBRES DE LA BASILIQUE DE SAN BENEDETTO. PHASE 1 "INTERVENTIONS VISANT LA SÉCURISATION, LA CONSTRUCTION NAVALE ET LA RÉALISATION D’ENQUÊTES PRÉLIMINAIRES. SOUS-PHASE 2 (French)
    3 February 2022
    0 references
    DRINGENDE INTERVENTIONEN FÜR DIE SICHERHEIT DES GLOCKENTURMS, DIE TEILE DES MAUERWERKS AUF DER VIA MAZZINI UND DIE FERTIGSTELLUNG DER BESEITIGUNG DER TRÜMMER DER BASILIKA VON SAN BENEDETTO. PHASE 1 "INTERVENTIONEN ZUR SICHERUNG, ZUM SCHIFFBAU UND ZUR DURCHFÜHRUNG VON VORUNTERSUCHUNGEN. TEILPHASE 2 (German)
    4 February 2022
    0 references
    DRINGENDE INTERVENTIES VOOR DE VEILIGHEID VAN DE KLOKKENTOREN, DE DELEN VAN METSELWERK OP VIA MAZZINI EN VOLTOOIING VAN DE VERWIJDERING VAN HET PUIN VAN DE BASILIEK VAN SAN BENEDETTO. FASE 1 "INTERVENTIES GERICHT OP HET VEILIGSTELLEN, DE SCHEEPSBOUW EN HET UITVOEREN VAN VOORONDERZOEKEN. SUBFASE 2 (Dutch)
    4 February 2022
    0 references
    NORCIA
    0 references

    Identifiers