WORKS FOR THE CONSTRUCTION OF PURIFICATION PLANTS AND COLLECTING WORKS _ BENEFICIARY: MUNICIPALITY OF RIARDO (CE) (Q4270978)

From EU Knowledge Graph
Revision as of 23:10, 2 February 2022 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
Jump to navigation Jump to search
Project Q4270978 in Italy
Language Label Description Also known as
English
WORKS FOR THE CONSTRUCTION OF PURIFICATION PLANTS AND COLLECTING WORKS _ BENEFICIARY: MUNICIPALITY OF RIARDO (CE)
Project Q4270978 in Italy

    Statements

    0 references
    2,149,500.0 Euro
    0 references
    2,866,000.0 Euro
    0 references
    75.0 percent
    0 references
    COMUNE DI RIARDO
    0 references
    0 references
    0 references
    IL PRESENTE PROGETTO RIGUARDA LA REALIZZAZIONE DEGLI INTERVENTI DI AMPLIAMENTO E COMPLETAMENTO DEL SISTEMA FOGNARIO A SERVIZIO DEL COMUNE DI RIARDO (CE).IN PARTICOLARE, I SUDDETTI INTERVENTI RIGUARDANO LA REALIZZAZIONE DI NUOVI RAMI FOGNARI A SERVIZIO DI AMBITI URBANI ATTUALMENTE SPROVVISTI DI RETE DI RACCOLTA E SMALTIMENTO, SIA DELLE ACQUE FECALI CHE DI QUELLE METEORICHE, TALI ACQUE, PERTANTO, VENGONO DIRETTAMENTE SVERSATE NEI CANALI DI DRENAGGIO DELLA SEDESTRADALE E, MEDIANTE ESSI, NEI CORSI D'ACQUA NATURALI CHE CONTORNANO L'AREA DI PROGETTO, SENZA ESSERE ASSOGGETTATE AD ALCUN TIPO DI TRATTAMENTO.A CIò SI AGGIUNGA CHE L'IMPIANTO DI DEPURAZIONE ESISTENTE RISULTA IN PARTE OBSOLETO (VASCHE DI DEPURAZIONE IN VIA SANTA LUCIA) E IN PARTE NON FUNZIONANTE E DI NOTEVOLE IMPATTO AMBIENTALE (DEPURATORE REALIZZATO NEGLI ANNI 70 IN ZONA ABITATA LUNGO LA STRADA EX PROVINCIALE SS 607 RIARDO-PIETRAMELARA). PERTANTO L'AMMINISTRAZIONE COMUNALE SI Ê POSTA L'OBIETTIVO DI COSTRUIRE UN NUOVO IMPIANTO D (Italian)
    0 references
    THIS PROJECT CONCERNS THE IMPLEMENTATION OF MEASURES TO EXTEND AND COMPLETE THE SEWERAGE SYSTEM FOR THE MUNICIPALITY OF RIARDO (CE).IN PARTICULAR, THESE MEASURES CONCERN THE CONSTRUCTION OF NEW SEWERAGE BRANCHES SERVING URBAN AREAS WHICH DO NOT HAVE A COLLECTION AND DISPOSAL NETWORK, BOTH FAECAL AND METEORIC WATERS, AND ARE THEREFORE DIRECTLY DISCHARGED INTO THE DRAINAGE CHANNELS OF THE SEDESTRADALE. THROUGH THEM, IN THE NATURAL WATERCOURSES THAT SURROUND THE PROJECT AREA, WITHOUT BEING SUBJECTED TO ANY TYPE OF TREATMENT.A CIò IT SHOULD BE ADDED THAT THE EXISTING SEWAGE TREATMENT PLANT IS PARTLY OBSOLETE (PURIFICATION TANKS IN VIA SANTA LUCIA) AND PARTLY NON-FUNCTIONING AND HAVING A SIGNIFICANT ENVIRONMENTAL IMPACT (PURIFIER BUILT IN THE 70'S IN INHABITED AREA ALONG THE FORMER PROVINCIAL ROAD SS 607 RIARDO-PIETRAMELARA). THEREFORE, THE MUNICIPAL ADMINISTRATION HAS SET ITSELF THE OBJECTIVE OF BUILDING A NEW PLANT OF (English)
    2 February 2022
    0 references
    CE PROJET CONCERNE LA MISE EN ŒUVRE DE MESURES VISANT À ÉTENDRE ET À COMPLÉTER LE SYSTÈME D’ASSAINISSEMENT DE LA COMMUNE DE RIARDO (CE).EN PARTICULIER, CES MESURES CONCERNENT LA CONSTRUCTION DE NOUVELLES SUCCURSALES D’ASSAINISSEMENT DESSERVANT DES ZONES URBAINES QUI NE DISPOSENT PAS D’UN RÉSEAU DE COLLECTE ET D’ÉVACUATION DES EAUX FÉCALES ET MÉTÉORIQUES ET QUI SONT DONC DIRECTEMENT DÉVERSÉES DANS LES CANAUX DE DRAINAGE DE LA SEDESTRADALE. PAR CONSÉQUENT, L’ADMINISTRATION MUNICIPALE S’EST FIXÉ POUR OBJECTIF DE CONSTRUIRE UNE NOUVELLE USINE DE (French)
    3 February 2022
    0 references
    RIARDO
    0 references

    Identifiers