Design and reconstruction works of heat supply networks Kurtuvėnai g. — Kelmes g. — Industrial str. — Liejyklos str. in Siauliai (Q3791384)
Jump to navigation
Jump to search
Project Q3791384 in Lithuania
Language | Label | Description | Also known as |
---|---|---|---|
English | Design and reconstruction works of heat supply networks Kurtuvėnai g. — Kelmes g. — Industrial str. — Liejyklos str. in Siauliai |
Project Q3791384 in Lithuania |
Statements
1,905,033.18 Euro
0 references
3,810,066.36 Euro
0 references
50.0 percent
0 references
17 November 2017
0 references
10 January 2020
0 references
Akcinė bendrovė "Šiaulių energija"
0 references
78502
0 references
AB „Šiaulių energija”, atsižvelgdama į aukštas kuro ir kitų resursų, naudojamų šilumos energijos gamybai, kainas, didelius šilumos perdavimo nuostolius AB „Šiaulių energija” valdomuose centralizuoto šilumos tiekimo tinkluose ir nepakankamą energijos perdavimo ir paskirstymo efektyvumą, nusprendė inicijuoti AB „Šiaulių energija“ valdomo Šiaulių miesto Pietinės katilinės šilumos tiekimo tinklo rekonstrukcijos projektą. 2017–2020 m., numatoma vietoje 4 182,25 m DN25–500 mm skersmens senų, požeminiuose, nepraeinamuose kanaluose ir bekanaliu būdu paklotų šilumos tiekimo tinklų sumontuoti naujus iš viso 3 764,24 m ilgio DN25–500 mm skersmens bekanalius optimizuoto diametro ir klojimo trajektorijos, pramoniniu būdu izoliuotus šilumos tiekimo tinklus su gedimų monitoringo sistema. Modernizuojamose trasose šilumos perdavimo nuostoliai sumažės 1 891,92 MWh: nuo 3 595,48 MWh iki 1 703,56 MWh per metus, t. y. 52,62 proc. Dėl mažesnio kuro suvartojimo sumažės išmetamas šiltnamio efektą sukeliančių dujų kiekis (planuojamas metinis išmetamų šiltnamio efektą sukeliančių dujų kiekio sumažėjimas 72,56 tCO2ek). Rekonstruotomis trasomis šiluma bus tiekiama patikimiau ir šilumos tiekimo kokybė pagerės 585 prijungtiems vartotojams. (Lithuanian)
0 references
Taking into account the high prices of fuel and other resources used for the production of thermal energy, significant heat transfer losses in district heating networks operated by AB Å iauliø energija and the lack of energy transmission and distribution efficiency, AB Å iauliø Energija decided to initiate a project for the reconstruction of the heating supply network of the Southern boiler house operated by Siauliai Energija. In 2017-2020, it is planned to replace 4 182.25 m DN25-500 mm diameter of old, underground, impassable ducts and unchannelly lined heating networks with a total of 3 764.24 m long DN25-500 mm diameterless trajectory of optimised diameter and laying, industrially insulated heat supply networks with fault monitoring system. On the modernised tracks, heat transfer losses will be reduced by 1 891.92 MWh: from 3 595.48 MWh to 1 703.56 MWh/year, i.e. 52.62 %. Reduced fuel consumption will lead to a reduction in greenhouse gas emissions (an estimated annual reduction in greenhouse gas emissions of 72.56 tCO2ek). The reconstructed tracks will provide more reliable heat supply and improve the quality of heat supply for 585 connected customers. (English)
1 February 2022
0 references
Compte tenu des prix élevés des combustibles et autres ressources utilisés pour la production d’énergie thermique, des pertes importantes de transfert de chaleur dans les réseaux de chauffage urbain exploités par AB Å iauliø energija et du manque d’efficacité du transport et de la distribution d’énergie, AB Šiauliø Energija a décidé de lancer un projet de reconstruction du réseau d’approvisionnement en chauffage de la chaudière sud exploitée par Siauliai Energija. En 2017-2020, il est prévu de remplacer 4 182,25 m DN25-500 mm de diamètre de conduits anciens, souterrains et infranchissables et des réseaux de chauffage non cannelés par un total de 3 764,24 m de long DN25-500 mm de trajectoire sans diamètre de diamètre optimisé et de pose, réseaux d’alimentation thermique isolés industriellement avec système de surveillance des défauts. Sur les voies modernisées, les pertes de transfert de chaleur seront réduites d’ici 1 891,92 MWh: de 3 595,48 MWh à 1 703,56 MWh/an, soit 52,62 %. La réduction de la consommation de carburant entraînera une réduction des émissions de gaz à effet de serre (une réduction annuelle estimée des émissions de gaz à effet de serre de 72,56 tCO2ek). Les voies reconstruites fourniront un approvisionnement en chaleur plus fiable et amélioreront la qualité de l’alimentation en chaleur pour 585 clients connectés. (French)
1 February 2022
0 references
Pramonės g. 10, Šiauliai
0 references