Design and reconstruction of heat supply networks Gytariu g. — Kvie g. and V. Grinkevičiaus g. — Lieporių g. — Gvazdikų tako g., Šiauliai (Q3778369)

From EU Knowledge Graph
Revision as of 17:52, 1 February 2022 by DG Regio (talk | contribs) (‎Changed an Item: Adding French translations)
Jump to navigation Jump to search
Project Q3778369 in Lithuania
Language Label Description Also known as
English
Design and reconstruction of heat supply networks Gytariu g. — Kvie g. and V. Grinkevičiaus g. — Lieporių g. — Gvazdikų tako g., Šiauliai
Project Q3778369 in Lithuania

    Statements

    0 references
    638,500.0 Euro
    0 references
    1,277,000.0 Euro
    0 references
    50.0 percent
    0 references
    2 June 2014
    0 references
    25 May 2018
    0 references
    Akcinė bendrovė "Šiaulių energija"
    0 references
    0 references

    55°54'38.30"N, 23°18'47.23"E
    0 references
    78502
    0 references
    AB „Šiaulių energija”, atsižvelgdama į aukštas kuro ir kitų resursų, naudojamų šilumos energijos gamybai, kainas, didelius šilumos perdavimo nuostolius AB „Šiaulių energija” valdomuose centralizuoto šilumos tiekimo tinkluose ir nepakankamą energijos perdavimo ir paskirstymo efektyvumą, nusprendė inicijuoti AB „Šiaulių energija“ valdomo Šiaulių miesto Pietinės katilinės šilumos tiekimo tinklo rekonstrukcijos projektą. Projekte, kurio vykdymas numatytas 2016–2018 m., numatoma vietoj 4 665 m DN50–DN500 mm skersmens senų, nepraeinamuose kanaluose paklotų šilumos tiekimo tinklų sumontuoti naujus iš viso 4 478 m ilgio bekanalinius šilumos tiekimo tinklus su gedimų monitoringo sistema. Projekto vykdymo metu optimizuojamas klojamų vamzdynų diametras ir vamzdynų paklojimo trajektorija (tinklo konfigūracija), dėl ko sumažėja bendras modernizuojamo tinklo ilgis. Modernizuojamose trasose šilumos perdavimo nuostoliai sumažės 2 427,04 MWh: nuo 4 199,02 MWh iki 1 771,98 MWh per metus, t. y. 57,80 proc. Dėl mažesnio kuro suvartojimo sumažės išmetamas šiltnamio efektą sukeliančių dujų kiekis (planuojamas metinis išmetamų šiltnamio efektą sukeliančių dujų kiekio sumažėjimas 66,59 tCO2ek). Rekonstruotomis trasomis šiluma bus tiekiama patikimiau ir šilumos tiekimo kokybė pagerės 6 576 prijungtiems vartotojams. (Lithuanian)
    0 references
    Taking into account the high prices of fuel and other resources used for the production of thermal energy, significant heat transfer losses in district heating networks operated by AB Å iauliø energija and the lack of energy transmission and distribution efficiency, AB Å iauliø Energija decided to initiate a project for the reconstruction of the heating supply network of the Southern boiler house operated by Siauliai Energija. The project, which is scheduled for 2016-2018, provides for the installation of new end-to-end heating networks with a total length of 4 478 m with a total length of 4 478 m, with a failure monitoring system, instead of the 4 665 m DN50-DN500 mm old heat supply network. During the implementation of the project, the diameter of the pipelines and the path of pipeline laying (network configuration) are optimised, which reduces the overall length of the upgraded network. On the modernised tracks, heat transfer losses will decrease by 2 427.04 MWh: from 4 199.02 MWh to 1 771.98 MWh/year, i.e. 57.80 %. Reduced fuel consumption will reduce greenhouse gas emissions (an estimated annual reduction in greenhouse gas emissions of 66.59 tCO2ek). The reconstructed routes will provide more reliable heat supply and the quality of heat supply will improve 6 576 connected customers. (English)
    1 February 2022
    0 references
    Compte tenu des prix élevés des combustibles et autres ressources utilisés pour la production d’énergie thermique, des pertes importantes de transfert de chaleur dans les réseaux de chauffage urbain exploités par AB Å iauliø energija et du manque d’efficacité du transport et de la distribution d’énergie, AB Šiauliø Energija a décidé de lancer un projet de reconstruction du réseau d’approvisionnement en chauffage de la chaudière sud exploitée par Siauliai Energija. Le projet, prévu pour 2016-2018, prévoit l’installation de nouveaux réseaux de chauffage de bout en bout d’une longueur totale de 4 478 m et d’une longueur totale de 4 478 m, avec un système de surveillance des défaillances, au lieu de l’ancien réseau d’alimentation en chaleur de 4 665 m DN50-DN500 mm. Lors de la mise en œuvre du projet, le diamètre des pipelines et le chemin de pose des pipelines (configuration du réseau) sont optimisés, ce qui réduit la longueur totale du réseau mis à niveau. Sur les voies modernisées, les pertes de transfert de chaleur diminueront de 2 427,04 MWh: de 4 199,02 MWh à 1 771,98 MWh/an, soit 57,80 %. La réduction de la consommation de carburant réduira les émissions de gaz à effet de serre (une réduction annuelle estimative des émissions de gaz à effet de serre de 66,59 tCO2ek). Les routes reconstruites fourniront un approvisionnement en chaleur plus fiable et la qualité de l’approvisionnement en chaleur améliorera 6 576 clients connectés. (French)
    1 February 2022
    0 references
    Pramonės g. 10, Šiauliai
    0 references

    Identifiers

    04.3.2-LVPA-K-102-01-0003
    0 references