MUNICIPALITY OF ISCHIA (NA) — URBAN REGENERATION INTEGRATION AND REHABILITATION OF COLLECTING SYSTEMS IN DIFFERENT AREAS OF THE MUNICIPALITY (Q2023105)
Jump to navigation
Jump to search
Project in Italy financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | MUNICIPALITY OF ISCHIA (NA) — URBAN REGENERATION INTEGRATION AND REHABILITATION OF COLLECTING SYSTEMS IN DIFFERENT AREAS OF THE MUNICIPALITY |
Project in Italy financed by DG Regio |
Statements
2,271,089.44 Euro
0 references
3,028,119.25 Euro
0 references
75.0 percent
0 references
1 October 2013
0 references
28 September 2018
0 references
COMUNE DI ISCHIA
0 references
IL PROGETTO CONCERNE DIVERSI LOTTI DEL PROGETTO GENERALE ELABORATO DALL'AMMINISTRAZIONE COMUNALE PER LA REALIZZAZIONE DELLA RETE FOGNARIA INTERNA ED IL RELATIVO COLLETTAMENTO DELLA STESSA ALLA RETE DI COLLETTORI COMPRENSORIALI. LA COPERTURA DEL SERVIZIO OGGI Ê PARI A CIRCA IL 30% DELL'INTERA POPOLAZIONE DEL TERRITORIO COMUNALE. LO SCHEMA FOGNARIO DELLA RETE NERA ESISTENTE RISULTA ESTREMAMENTE FRAMMENTATA CON RECAPITI NELL'IMPIANTO DEPURATIVO DI SAN PIETRO, N CONDOTTE SOTTOMARINE, IN POZZI ASSORBENTI OPPURE DIRETTAMENTE IN ALVEI NATURALI O TOMBATI. LA RETE BIANCA RISULTA, INVECE, QUASI DEL TUTTO ASSENTE SUL TERRITORIO SICCHé LE ACQUE PIOVANE DEFLUISCONO PER RUSCELLAMENTO SULLE STRADE COMUNALI. IL PROGETTO HA COME FINALITà LA REALIZZAZIONE DI OPERE FOGNARIE DI TIPO SEPARATO IN DIVERSI AMBITI DEL TERRITORIO COMUNALE E CONVOGLIAMENTO DI QUESTE ULTIME AL DEPURATORE COMUNALE ESISTENTE IN LOCALITà SAN PIETRO (IN CORSO DI ADEGUAMENTO E POTENZIAMENTO). NEL COMPLESSO SARANNO REALIZZATI 7,7 K (Italian)
0 references
THE PROJECT CONCERNS SEVERAL LOTS OF THE GENERAL PROJECT DRAWN UP BY THE MUNICIPAL ADMINISTRATION FOR THE CONSTRUCTION OF THE INTERNAL SEWAGE NETWORK AND THE COLLECTION OF THE INTERNAL SEWER NETWORK TO THE NETWORK OF DISTRICT COLLECTORS. THE COVERAGE OF THE SERVICE NOW APPLIES TO SOME 30 % OF THE ENTIRE POPULATION OF THE MUNICIPALITY. THE EXISTING SEWER NETWORK OF THE EXISTING BLACK NETWORK IS HIGHLY FRAGMENTED WITH CONTACT DETAILS IN SAN PIETRO’S WASTE WATER TREATMENT PLANT, SEAMOUNT, ABSORPTIVE WELLS, OR NATURAL OR GRAVE BEDS. ON THE OTHER HAND, THE WHITE NET IS ALMOST COMPLETELY ABSENT ON THE TERRITORY OF THE MUNICIPALITY, WITH RAIN FLOWING THROUGH RUNOFF ONTO MUNICIPAL ROADS. THE PROJECT AIMS TO CARRY OUT SEPARATE COLLECTING SYSTEMS IN DIFFERENT AREAS OF THE MUNICIPALITY AND TO SEND THEM TO THE EXISTING MUNICIPAL SEWAGE PLANT IN LOCALITATION AND UPGRADING. OVERALL, 7,7 K WILL BE IMPLEMENTED. (English)
0 references
Identifiers
I36J14000020006
0 references