Replacement of the Coverages of the School EB 2/3 de Maceda (Q3357367)
Jump to navigation
Jump to search
Project Q3357367 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Replacement of the Coverages of the School EB 2/3 de Maceda |
Project Q3357367 in Portugal |
Statements
129,877.0 Euro
0 references
129,877.0 Euro
0 references
100.0 percent
0 references
12 July 2021
0 references
30 October 2021
0 references
MUNICÃPIO DE OVAR
0 references
A operação "Substituição das Coberturas da Escola EB 2/3 de Maceda" vem dar cumprimento à Resolução da Assembleia da República n.º 24/2003, de 2 de abril, e à Lei n.º 2/2011, de 9 de fevereiro, para a remoção de fibrocimento e conferir ao edifÃcio maior conforto térmico e condições de estanquidade. (Portuguese)
0 references
The operation “Replacement of the Coverages of the School EB 2/3 de Maceda” comes in compliance with the Resolution of the Assembly of the Republic No. 24/2003, of 2 April, and to Law No. 2/2011, of 9 February, for the removal of fibrocement and to give the building greater theoretical comfort and conditions of tightness. (English)
29 November 2021
0 references
L’opération «Remplacement des couvertures de l’école EB 2/3 de Maceda» est conforme à la résolution de l’Assemblée de la République no 24/2003, du 2 avril, et à la loi no 2/2011, du 9 février, pour l’élimination du fibrocement et pour donner au bâtiment un plus grand confort théorique et des conditions d’étanchéité. (French)
7 December 2021
0 references
Die Operation „Replacement of the Coverages of the School EB 2/3 de Maceda“ erfolgt im Einklang mit der Resolution der Versammlung der Republik Nr. 24/2003, vom 2. April und dem Gesetz Nr. 2/2011, vom 9. Februar, für die Beseitigung der Befruchtung und um dem Gebäude mehr theoretischen Komfort und Bedingungen der Dichtheit zu geben. (German)
16 December 2021
0 references
De operatie „Vervanging van de dekkingen van de school EB 2/3 de Maceda” is in overeenstemming met de resolutie van de Assemblee van de Republiek nr. 24/2003 van 2 april en Wet nr. 2/2011 van 9 februari, voor de verwijdering van fibrocement en om het gebouw meer theoretisch comfort en strakheid te geven. (Dutch)
20 December 2021
0 references
L'operazione "Sostituzione delle Coperture della Scuola EB 2/3 de Maceda" è conforme alla delibera dell'Assemblea della Repubblica n. 24/2003, del 2 aprile, e alla legge n. 2/2011, del 9 febbraio, per la rimozione del fibrocemento e per conferire all'edificio un maggiore comfort teorico e condizioni di tenuta. (Italian)
18 January 2022
0 references
La operación «Reemplazo de las Coberturas de la Escuela EB 2/3 de Maceda» se ajusta a la Resolución de la Asamblea de la República No 24/2003, de 2 de abril, y a la Ley No 2/2011, de 9 de febrero, para la eliminación del fibrocemento y para dar al edificio mayor confort teórico y condiciones de estanqueidad. (Spanish)
22 January 2022
0 references
Ovar, Região de Aveiro, Centro
0 references
Identifiers
CENTRO-03-5673-FEDER-000277
0 references