Reconstruction of the rockfall S4 of the Siede in Siedenburg. (Q3309271)
Jump to navigation
Jump to search
Project Q3309271 in Germany
Language | Label | Description | Also known as |
---|---|---|---|
English | Reconstruction of the rockfall S4 of the Siede in Siedenburg. |
Project Q3309271 in Germany |
Statements
64,597.5 Euro
0 references
129,195.01 Euro
0 references
50.0 percent
0 references
1 July 2018
0 references
31 December 2019
0 references
ULV Große Aue
0 references
Zur Herstellung der faunistischen Durchgängigkeit in der Siede soll der Sohlabsturz S4 zu einem Raugerinne mit Beckenstruktur umgebaut werden. (German)
0 references
In order to produce the faunistic continuity in the boiling point, the S4 rockfall is to be converted into a roughing gutter with a pelvic structure. (English)
24 October 2021
0 references
Pour réaliser la continuité fauniste dans l’ébullition, le crash de la semelle S4 doit être transformé en une gouttière à structure pelvienne. (French)
6 December 2021
0 references
Om de faunistische continuïteit in het kookpunt te produceren, moet de S4 rotsval worden omgezet in een voorbeengoot met een bekkenstructuur. (Dutch)
19 December 2021
0 references
Al fine di produrre la continuità faunistica nel punto di ebollizione, la cascata S4 deve essere convertita in una grondaia sgrossata con una struttura pelvica. (Italian)
18 January 2022
0 references
Con el fin de producir la continuidad faunista en el punto de ebullición, la caída de roca S4 se convertirá en una canaleta de desbaste con una estructura pélvica. (Spanish)
22 January 2022
0 references
Diepholz
0 references
Identifiers
DE_TEMPORARY_12056
0 references