Recycling of construction waste (Q2873535)

From EU Knowledge Graph
Revision as of 12:36, 20 January 2022 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in es, and other parts: Adding Spanish translations)
Jump to navigation Jump to search
Project Q2873535 in Portugal
Language Label Description Also known as
English
Recycling of construction waste
Project Q2873535 in Portugal

    Statements

    0 references
    140,540.0 Euro
    0 references
    234,233.0 Euro
    0 references
    60.0 percent
    0 references
    8 October 2018
    0 references
    7 April 2021
    0 references
    MIGUEL PADEZ CAETANO, UNIPESSOAL LDA
    0 references
    0 references

    40°8'26.92"N, 7°30'6.30"W
    0 references
    Pretende-se promover a criação de um centro de recolha e reciclagem de RCD com sede em Fundão. Servirá toda a região da cova da Beira e face à proximidade de Espanha, tendo em conta a mobilidade do equipamento esta região também será um mercado alvo.Serão criados 5 postos de trabalho objeto de candidatura ao FSE. (Portuguese)
    0 references
    The aim is to promote the creation of a CDR collection and recycling centre based in Fundão. It will serve the entire region of the cave of Beira and in view of the proximity of Spain, taking into account the mobility of equipment this region will also be a target market. (English)
    7 July 2021
    0 references
    L’objectif est de promouvoir la création d’un centre de collecte et de recyclage pour le CDW basé à Fundão. Elle servira toute la région de la tombe de Beira et, compte tenu de la proximité de l’Espagne, compte tenu de la mobilité des équipements, cette région sera également un marché cible. 5 emplois seront créés pour lesquels le FSE est appliqué. (French)
    4 December 2021
    0 references
    Ziel ist die Schaffung eines Sammel- und Recyclingzentrums für CDW mit Sitz in Fundão. Sie wird die gesamte Region des Grabes von Beira bedienen, und angesichts der Nähe Spaniens wird diese Region angesichts der Mobilität der Ausrüstung auch ein Zielmarkt sein. 5 Arbeitsplätze werden geschaffen, für die der ESF eingesetzt wird. (German)
    13 December 2021
    0 references
    Het doel is de oprichting van een inzamelings- en recyclingcentrum voor CDW in Fundão te bevorderen. Het zal de hele regio van het Beira graf dienen en gezien de nabijheid van Spanje zal deze regio, gezien de mobiliteit van uitrusting, ook een doelmarkt zijn. 5 banen zullen worden gecreëerd waarvoor het ESF wordt toegepast. (Dutch)
    18 December 2021
    0 references
    L'obiettivo è promuovere la creazione di un centro di raccolta e riciclaggio per la raccolta e il riciclaggio con sede a Fundão. Essa servirà l'intera regione della tomba di Beira e, vista la vicinanza della Spagna, dato che la mobilità delle attrezzature sarà anche un mercato di riferimento, verranno creati 5 posti di lavoro per i quali si applica il FSE. (Italian)
    17 January 2022
    0 references
    El objetivo es promover la creación de un centro de recogida y reciclado para CDW con sede en Fundão. Servirá a toda la región de la tumba de Beira y en vista de la proximidad de España, dada la movilidad de equipamiento esta región también será un mercado objetivo. Se crearán 5 puestos de trabajo para los que se aplica el FSE. (Spanish)
    20 January 2022
    0 references
    Fundão, União das freguesias de Fundão, Valverde, Donas, Aldeia de Joanes e Aldeia Nova do Cabo
    0 references

    Identifiers

    CENTRO-04-3827-FEDER-000419
    0 references