Torrão Mobility Plan – Phase 2 (Q2863353)

From EU Knowledge Graph
Revision as of 11:19, 20 January 2022 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in es, and other parts: Adding Spanish translations)
Jump to navigation Jump to search
Project Q2863353 in Portugal
Language Label Description Also known as
English
Torrão Mobility Plan – Phase 2
Project Q2863353 in Portugal

    Statements

    0 references
    65,680.0 Euro
    0 references
    77,271.0 Euro
    0 references
    85.0 percent
    0 references
    11 September 2020
    0 references
    26 February 2021
    0 references
    MUNICÍPIO DE ALCÁCER DO SAL
    0 references

    38°17'41.21"N, 8°13'19.74"W
    0 references
    Esta fase do plano de mobilidade do Torrão vem dar continuidade à melhoria das condições de circulação pedonal em algumas Ruas do Centro Histórico do Torrão que, pelas características irregulares do seu pavimento e, em alguns casos, pela topografia do terreno, não oferecem o conforto e a segurança que aquela população necessita. (Portuguese)
    0 references
    This phase of the mobility plan of Torrão continues to improve the conditions of pedestrian circulation in some Streets of the Historical Center of Torrão that, due to the irregular characteristics of its pavement and, in some cases, by the topography of the terrain, do not offer the comfort and safety that this population needs. (English)
    6 July 2021
    0 references
    Cette phase du plan de mobilité de Torrão poursuit l’amélioration des conditions de circulation des piétons dans certaines rues du Centre historique de Torrão qui, en raison des caractéristiques irrégulières de son plancher et, dans certains cas, de la topographie du terrain, n’offrent pas le confort et la sécurité dont la population a besoin. (French)
    4 December 2021
    0 references
    Diese Phase des Mobilitätsplans von Torrão setzt die Verbesserung der Fußgängerzirkulationsbedingungen in einigen Straßen des historischen Zentrums von Torrão fort, die aufgrund der unregelmäßigen Eigenschaften seines Bodens und in einigen Fällen die Topographie des Geländes nicht den Komfort und die Sicherheit bieten, die die Bevölkerung braucht. (German)
    13 December 2021
    0 references
    Deze fase van het mobiliteitsplan van Torrão zet de verbetering van de voetgangerscirculatie in sommige straten van het historische centrum van Torrão voort die, als gevolg van de onregelmatige kenmerken van de vloer en, in sommige gevallen, de topografie van het terrein, niet het comfort en de veiligheid bieden die de bevolking nodig heeft. (Dutch)
    18 December 2021
    0 references
    Questa fase del piano di mobilità di Torrão continua il miglioramento delle condizioni di circolazione dei pedoni in alcune strade del Centro Storico di Torrão che, a causa delle caratteristiche irregolari del suo pavimento e, in alcuni casi, della topografia del terreno, non offrono il comfort e la sicurezza di cui la popolazione ha bisogno. (Italian)
    17 January 2022
    0 references
    Esta fase del plan de movilidad de Torrão continúa la mejora de las condiciones de circulación peatonal en algunas calles del Centro Histórico de Torrão que, debido a las características irregulares de su suelo y, en algunos casos, a la topografía del terreno, no ofrecen la comodidad y seguridad que la población necesita. (Spanish)
    20 January 2022
    0 references
    Alcácer do Sal, Torrão
    0 references

    Identifiers

    ALT20-04-1406-FEDER-000097
    0 references