SMART GRID PRIMARY CAB PROJECT - Q2017756 (Q2017756)

From EU Knowledge Graph
Revision as of 20:49, 24 January 2022 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in es, and other parts: Adding Spanish translations)
Jump to navigation Jump to search
Project Q2017756 in Italy
Language Label Description Also known as
English
SMART GRID PRIMARY CAB PROJECT - Q2017756
Project Q2017756 in Italy

    Statements

    0 references
    1,446,276.45 Euro
    0 references
    1,957,709.42 Euro
    0 references
    73.88 percent
    0 references
    26 March 2018
    0 references
    31 December 2020
    0 references
    E-DISTRIBUZIONE SPA
    0 references

    36°42'54.76"N, 15°5'29.33"E
    0 references
    IL PROGETTO COMPRENDE INTERVENTI SIA DI STRUTTURA CHE DI IMPLEMENTAZIONE DELLE FUNZIONALITà SMART GRID. GLI INTERVENTI STRUTTURALI MIRANO A MODIFICARE LA CONFIGURAZIONE DELL'IMPIANTO AL FINE DI MIGLIORARNE LE CONDIZIONI DI ESERCIZIO E LE PRESTAZIONI.IL PROGETTO PREVEDE L'UTILIZZO DI DISPOSITIVI DI ULTIMA GENERAZIONE CHE PERMETTANO LA COMPLETA SMARTIZZAZIONE DELLA CABINA PRIMARIA E DELLE CABINE SECONDARIE SOTTESE. INOLTRE VERRANNO SOSTITUITE LE LINEE MT TRAMITE NUOVI CAVI IN ALLUMINIO E IN ALLUMINIO ELICORD.IL PROGETTO SI QUALIFICA COME SMART GRID IN QUANTO PREVEDE L'INSTALLAZIONE DI DISPOSITIVI TECNOLOGICI E DI APPARECCHIATURE INTELLIGENTI FINALIZZATE AD UNA GESTIONE EVOLUTA DELLA RETE ELETTRICA, CON L'OBIETTIVO DI AGEVOLARE L'INCREMENTO DELLA QUOTA DI FABBISOGNO ENERGETICO COPERTO DA GENERAZIONE DISTRIBUITA DA FONTI RINNOVABILI. IN TAL SENSO SI IMPLEMENTANO LE SEGUENTI FUNZIONALITà SMART:-SELETTIVITà LOGICA DEL TRONCO GUASTO-OSSERVABILITà DELLA RETE MT-CONTROLLO EVOLUTO DI TENSION (Italian)
    0 references
    THE PROJECT COMPRISES BOTH STRUCTURAL AND OPERATIONAL MEASURES FOR SMART GRIDS. THE PURPOSE OF THE STRUCTURAL MEASURES IS TO CHANGE THE DESIGN OF THE PLANT IN ORDER TO IMPROVE THE CONDITIONS FOR OPERATION AND TO IMPROVE THE DESIGN OF THE INSTALLATION. THE DESIGN OF THE INSTALLATION SHALL CONSIST OF THE USE OF STATE-OF-THE-ART DEVICES ENABLING THE COMPLETE SMARTISATION OF THE PRIMARY CABIN AND THE UNDERLYING CABS. IN ADDITION, THE MT LINES WILL BE REPLACED BY NEW ALUMINIUM AND ALUMINIUM WIRE CABLES. THIS PROJECT QUALIFIES AS SMART GRIDS FOR THE INSTALLATION OF SMART TECHNOLOGY DEVICES AND APPLIANCES FOR THE IMPROVED MANAGEMENT OF THE ELECTRICITY GRID, WITH THE AIM OF FACILITATING THE INCREASE IN THE SHARE OF ENERGY DEMAND COVERED BY GENERATION FROM RENEWABLE SOURCES. IN THIS RESPECT, THE FOLLOWING FEATURES ARE USED AS A TOOL FOR SMART: — ATTRIBUTE TO THE UASTO-ROBSERVABILITY TRUNK OF THE MT-SURVEILLANCE NETWORK OF TENSION (English)
    0 references
    LE PROJET COMPREND À LA FOIS LA STRUCTURE ET LA MISE EN ŒUVRE DE FONCTIONNALITÉS DE RÉSEAU INTELLIGENT. LES INTERVENTIONS STRUCTURELLES VISENT À MODIFIER LA CONFIGURATION DU SYSTÈME AFIN D’AMÉLIORER LES CONDITIONS DE FONCTIONNEMENT ET LES PRESTATIONS.LE PROJET PRÉVOIT L’UTILISATION D’APPAREILS DE DERNIÈRE GÉNÉRATION QUI PERMETTENT L’INTELLIGENCE COMPLÈTE DE LA CABINE PRIMAIRE ET DES CABINES SECONDAIRES CI-DESSOUS. EN OUTRE, LES LIGNES MT SERONT REMPLACÉES PAR DE NOUVELLES LIGNES ELICORD ALUMINIUM ET ALUMINIUM CABLES.LE PROJET EST QUALIFIÉ DE RÉSEAU INTELLIGENT CAR IL PRÉVOIT L’INSTALLATION D’APPAREILS TECHNOLOGIQUES ET D’ÉQUIPEMENTS INTELLIGENTS DESTINÉS À UNE GESTION AVANCÉE DU RÉSEAU ÉLECTRIQUE, DANS LE BUT DE FACILITER L’AUGMENTATION DE LA PART DES BESOINS ÉNERGÉTIQUES COUVERTS PAR LA PRODUCTION DISTRIBUÉE À PARTIR DE SOURCES RENOUVELABLES. EN CE SENS, LES FONCTIONS INTELLIGENTES SUIVANTES SONT MISES EN ŒUVRE:-SELETTIVITY LOGIQUE DE L’OBSERVABILITÉ DU TRONC DÉFECTUEUX DU RÉSEAU DE TENSION MT-CONTROL AVANCÉ (French)
    14 December 2021
    0 references
    HET PROJECT OMVAT ZOWEL DE STRUCTUUR ALS DE IMPLEMENTATIE VAN SLIMME NETWERKFUNCTIES. DE STRUCTURELE INTERVENTIES ZIJN BEDOELD OM DE CONFIGURATIE VAN HET SYSTEEM TE WIJZIGEN OM DE BEDRIJFSOMSTANDIGHEDEN TE VERBETEREN EN HET PROJECT PRESTATIONS.THE VOORZIET IN HET GEBRUIK VAN DE NIEUWSTE GENERATIE APPARATEN DIE DE VOLLEDIGE SLIMMER MAKEN VAN DE PRIMAIRE CABINE EN DE SECUNDAIRE CABINES HIERONDER. BOVENDIEN ZULLEN DE MT-LIJNEN WORDEN VERVANGEN DOOR NIEUW ELICORD-ALUMINIUM EN ALUMINIUM CABLES.THE-PROJECT KWALIFICEERT ALS SLIM NET OMDAT HET VOORZIET IN DE INSTALLATIE VAN TECHNOLOGISCHE APPARATUUR EN INTELLIGENTE APPARATUUR VOOR EEN GEAVANCEERD BEHEER VAN HET ELEKTRICITEITSNET, MET ALS DOEL DE TOENAME VAN HET AANDEEL VAN ENERGIEBEHOEFTEN DIE WORDEN GEDEKT DOOR OPWEKKING UIT HERNIEUWBARE BRONNEN TE VERGEMAKKELIJKEN. IN DEZE ZIN WORDEN DE VOLGENDE SLIMME FUNCTIES GEÏMPLEMENTEERD:-SELETTIVITY LOGICA VAN DE DEFECTE ROMP-WAARNEMING VAN HET GEAVANCEERDE MT-CONTROL NETWERK VAN SPANNING (Dutch)
    22 December 2021
    0 references
    DAS PROJEKT UMFASST SOWOHL DIE STRUKTUR ALS AUCH DIE UMSETZUNG VON SMART GRID-FUNKTIONEN. DIE STRUKTURINTERVENTIONEN ZIELEN DARAUF AB, DIE KONFIGURATION DES SYSTEMS ZU ÄNDERN, UM DIE BETRIEBSBEDINGUNGEN ZU VERBESSERN, UND DAS PROJEKT PRESTATIONS.THE SIEHT DIE VERWENDUNG VON GERÄTEN DER NEUESTEN GENERATION VOR, DIE EINE VOLLSTÄNDIGE INTELLIGENTE GESTALTUNG DER HAUPTKABINE UND DER NACHFOLGENDEN NEBENKABINEN ERMÖGLICHEN. DARÜBER HINAUS WERDEN DIE MT-LINIEN DURCH NEUE ELICORD-ALUMINIUM- UND ALUMINIUM-CABLES ERSETZT.DAS PROJEKT GILT ALS INTELLIGENTES NETZ, DA ES DIE INSTALLATION VON TECHNOLOGISCHEN GERÄTEN UND INTELLIGENTEN GERÄTEN FÜR EINE FORTSCHRITTLICHE VERWALTUNG DES STROMNETZES VORSIEHT, UM DEN ANSTIEG DES ANTEILS DES ENERGIEBEDARFS ZU ERLEICHTERN, DER DURCH DIE ERZEUGUNG GEDECKT WIRD, DIE AUS ERNEUERBAREN QUELLEN VERTEILT WIRD. IN DIESEM SINNE WERDEN DIE FOLGENDEN INTELLIGENTEN FUNKTIONEN IMPLEMENTIERT:-SELETTIVITY LOGIK DER FEHLERHAFTEN TRUNK-BEOBACHTBARKEIT DES FORTGESCHRITTENEN MT-CONTROL-NETZES DER SPANNUNG (German)
    24 December 2021
    0 references
    EL PROYECTO INCLUYE TANTO LA ESTRUCTURA COMO LA IMPLEMENTACIÓN DE CARACTERÍSTICAS DE RED INTELIGENTE. LAS INTERVENCIONES ESTRUCTURALES TIENEN COMO OBJETIVO MODIFICAR LA CONFIGURACIÓN DEL SISTEMA CON EL FIN DE MEJORAR LAS CONDICIONES DE FUNCIONAMIENTO Y LAS PRESTACIONES. EL PROYECTO PREVÉ EL USO DE DISPOSITIVOS DE ÚLTIMA GENERACIÓN QUE PERMITAN LA COMPLETA INTELIGENTEIZACIÓN DE LA CABINA PRIMARIA Y LAS CABINAS SECUNDARIAS A CONTINUACIÓN. ADEMÁS, LAS LÍNEAS MT SERÁN SUSTITUIDAS POR EL NUEVO ELICORD ALUMINIO Y ALUMINIO CABLES. EL PROYECTO SE CALIFICA COMO RED INTELIGENTE, YA QUE PREVÉ LA INSTALACIÓN DE DISPOSITIVOS TECNOLÓGICOS Y EQUIPOS INTELIGENTES DESTINADOS A UNA GESTIÓN AVANZADA DE LA RED ELÉCTRICA, CON EL OBJETIVO DE FACILITAR EL AUMENTO DE LA CUOTA DE LAS NECESIDADES ENERGÉTICAS CUBIERTAS POR LA GENERACIÓN DISTRIBUIDA A PARTIR DE FUENTES RENOVABLES. EN ESTE SENTIDO, SE IMPLEMENTAN LAS SIGUIENTES FUNCIONES INTELIGENTES:-SELETIVIDAD LÓGICA DE LA OBSERVABILIDAD TRONCAL DEFECTUOSA DE LA AVANZADA MT-CONTROL DE LA RED DE TENSIÓN (Spanish)
    24 January 2022
    0 references

    Identifiers

    F91F18000010006
    0 references