(10360.14072017.115000071) 05.18_3053_ILBORO (Q2056991)

From EU Knowledge Graph
Revision as of 12:29, 24 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
Jump to navigation Jump to search
Project Q2056991 in Italy
Language Label Description Also known as
English
(10360.14072017.115000071) 05.18_3053_ILBORO
Project Q2056991 in Italy

    Statements

    0 references
    107,143.82 Euro
    0 references
    310,561.79 Euro
    0 references
    34.5 percent
    0 references
    1 January 2018
    0 references
    23 March 2020
    0 references
    31 March 2020
    0 references
    COMUNE DI PRATO
    0 references
    0 references
    0 references

    43°46'11.53"N, 11°15'20.09"E
    0 references
    ALLO SCOPO DI PERSEGUIRE GLI OBIETTIVI DI EFFICIENTAMENTO ENERGETICO DELL?EDIFICIO IN ESAME, SI ? PREDISPOSTO UNO SPECIFICO PROGETTO CHE SI ARTICOLA SECONDO I SEGUENTI CONTENUTI.- INFISSI: ? PREVISTA LA RIMOZIONE DI TUTTI QUEGLI INFISSI ESISTENTI CHE NON RISPONDONO AI REQUISITI PRESTAZIONALI DI CUI AL DECRETO REQUISITI MINIMI 26/06/2015; PARALLELAMENTE, SI PROCEDER? ALLA POSA IN OPERA DI NUOVI SERRAMENTI IN ALLUMINIO, A TAGLIO TERMICO, CON VETRO-CAMERA BASSO-EMISSIVO (BE), RISPONDENTI AI REQUISITI PRESTAZIONALI DEL D.M. 16.02.2016 (CONTO TERMICO 2.0) CON UW ELT; 1,67 W7MQ.K. L'INSTALLAZIONE AVVERR? CON PARTICOLARE ATTENZIONE ALLA CORREZIONE DEI C.D. ?PONTI TERMICI? PREVEDENDO QUINDI ANCHE LA SOSTITUZIONE DELLE ATTUALI SOGLIE CON NUOVE SOGLIE A TAGLIO TERMICO. LE VETRATE CON ORIENTAMENTO SUD-EST-SUD-SUD-OVEST SARANNO DOTATE DI RIVESTIMENTO SELETTIVO (VETRO A CONTROLLO SOLARE) CON FATTORE SOLARE DEL VETRO G, GL,N ELT; 0,35.- ISOLAMENTO TERMICO STRUTTURE ORIZZONTALI E VERTICALI: LUNGO GLI (Italian)
    0 references
    IN ORDER TO PURSUE THE OBJECTIVES OF IMPROVING THE ENERGY EFFICIENCY OF THE BUILDING IN QUESTION? SET UP A SPECIFIC PROJECT BASED ON THE FOLLOWING CONTENT OF THE FIXTURES: ? PROVISION IS MADE FOR THE REMOVAL OF ANY EXISTING WINDOW FRAMES WHICH DO NOT MEET THE PERFORMANCE REQUIREMENTS LAID DOWN IN MINIMUM REQUIREMENTS 26/06/2015; IN PARALLEL, DO YOU PROCEED? THE INSTALLATION OF NEW ALUMINIUM, THERMAL CUT WINDOWS, WITH VETRO-CAMERA BASO-LOW-EMISSION (BE), MEETING THE PERFORMANCE REQUIREMENTS OF MINISTERIAL DECREE NO 16.02.2016 (THERMAL ACCOUNT 2.0) WITH HEW ELT; 1,67 W7M.K. THE AVTRR INSTALLATION? WITH PARTICULAR ATTENTION TO THE CORRECTION OF C.D.? FOR THERMAL BRIDGES? IT THEREFORE ALSO PROVIDES FOR THE REPLACEMENT OF EXISTING THRESHOLDS WITH NEW HEAT CUT THRESHOLDS. SUD-EXD-SUD-OVEST GLAZING WILL BE EQUIPPED WITH A SELECTIVE COATING (SOLAR CONTROLLED GLASS) OF GLASS G, GL, N ELT; 0,35-THERMAL INSULATION OF HORIZONTAL AND VERTICAL STRUCTURES: LONG (English)
    0 references
    AFIN D’ATTEINDRE LES OBJECTIFS D’EFFICACITÉ ÉNERGÉTIQUE DU BÂTIMENT CONSIDÉRÉ, OUI? A PRÉPARÉ UN PROJET SPÉCIFIQUE STRUCTURÉ SELON LES CONTENUTIES SUIVANTES: PRÉVOIT LA SUPPRESSION DE TOUS LES APPAREILS EXISTANTS QUI NE RÉPONDENT PAS AUX EXIGENCES DE PERFORMANCE ÉNONCÉES DANS LE DÉCRET 26/06/2015 RELATIF AUX PRESCRIPTIONS MINIMALES; EN PARALLÈLE, ALLONS-NOUS PROCÉDER? L’INSTALLATION DE NOUVEAUX CADRES EN ALUMINIUM, COUPE THERMIQUE, À FAIBLE ÉMISSION DE VERRE-CHAMBRE (BE), RÉPONDANT AUX EXIGENCES DE PERFORMANCE DU DÉCRET MINISTÉRIEL 16.02.2016 (COMPTE THERMIQUE 2.0) AVEC UW ELT; 1.67 W7MQ.K. L’INSTALLATION VA SE RÉALISER? AVEC UNE ATTENTION PARTICULIÈRE À LA CORRECTION DES PONTS THERMIQUES C.D.? IL PRÉVOIT DONC ÉGALEMENT LE REMPLACEMENT DES SEUILS ACTUELS PAR DE NOUVEAUX SEUILS DE COUPE THERMIQUE. LES FENÊTRES EN VERRE ORIENTÉES SUD-EST-SUD-SUD-SUD-SUD-OUEST SERONT ÉQUIPÉES D’UN REVÊTEMENT SÉLECTIF (VERRE CONTRÔLÉ SOLAIRE) AVEC FACTEUR SOLAIRE G, GL, N ELT; 0.35.- STRUCTURES HORIZONTALES ET VERTICALES D’ISOLATION THERMIQUE: LE LONG DE LA (French)
    16 December 2021
    0 references
    OM DE ENERGIE-EFFICIËNTIEDOELSTELLINGEN VAN HET BETROKKEN GEBOUW TE BEREIKEN, JA? EEN SPECIFIEK PROJECT VOORBEREID DAT GESTRUCTUREERD IS VOLGENS DE VOLGENDE CONTENUTIES.- ARMATUREN: VOORZIEN IN DE VERWIJDERING VAN ALLE BESTAANDE ARMATUREN DIE NIET VOLDOEN AAN DE PRESTATIEVEREISTEN VAN HET MINIMUMEISENDE BESLUIT 26/06/2015; PARALLEL, ZULLEN WE VERDER GAAN? DE INSTALLATIE VAN NIEUWE ALUMINIUM FRAMES, THERMISCH GESLEPEN, MET EMISSIEARME GLASKAMER (BE), DIE VOLDOEN AAN DE PRESTATIEVEREISTEN VAN MINISTERIEEL BESLUIT 16.02.2016 (THERMISCHE REKENING 2.0) MET UW ELT; 1.67 W7MQ.K. DE INSTALLATIE ZAL UITKOMEN? MET BIJZONDERE AANDACHT VOOR DE CORRECTIE VAN C.D.? THERMISCHE BRUGGEN? ZIJ VOORZIET DAAROM OOK IN DE VERVANGING VAN DE HUIDIGE DREMPELS DOOR NIEUWE THERMISCHE REDUCTIEDREMPELS. GLAS RAMEN MET ZUID-OOST-ZUID-ZUID-WEST ORIËNTATIE ZAL WORDEN UITGERUST MET SELECTIEVE COATING (ZONNEGESTUURD GLAS) MET ZONNEFACTOR G, GL, N ELT; 0.35.- THERMISCHE ISOLATIE HORIZONTALE EN VERTICALE CONSTRUCTIES: LANGS DE (Dutch)
    23 December 2021
    0 references
    UM DIE ENERGIEEFFIZIENZZIELE DES BETREFFENDEN GEBÄUDES ZU ERREICHEN, JA? ERSTELLTE EIN SPEZIFISCHES PROJEKT, DAS NACH FOLGENDEN CONTENUTIES.- VORRICHTUNGEN STRUKTURIERT IST: VORGESEHEN IST, DASS ALLE VORHANDENEN EINRICHTUNGEN ENTFERNT WERDEN, DIE DIE LEISTUNGSANFORDERUNGEN DES DEKRETS 26/06/2015 NICHT ERFÜLLEN; WERDEN WIR PARALLEL WEITERMACHEN? DIE INSTALLATION NEUER ALUMINIUMRAHMEN, THERMISCHER SCHNITT, MIT EMISSIONSARMEM GLAS-KAMMER (BE), DIE DEN LEISTUNGSANFORDERUNGEN DES MINISTERIALDEKRETS 16.02.2016 (THERMAL ACCOUNT 2.0) MIT UW ELT ENTSPRECHEN; 1.67 W7MQ.K. DIE INSTALLATION WIRD WAHR WERDEN? MIT BESONDEREM AUGENMERK AUF DIE KORREKTUR VON C.D.? WÄRMEBRÜCKEN? SIE SIEHT DAHER AUCH DIE ERSETZUNG DER DERZEITIGEN SCHWELLENWERTE DURCH NEUE THERMISCHE KÜRZUNGSSCHWELLEN VOR. GLASFENSTER MIT SÜD-SÜD-SÜD-WEST-AUSRICHTUNG WERDEN MIT SELEKTIVER BESCHICHTUNG (SOLARGESTEUERTES GLAS) MIT SOLARFAKTOR G, GL,N ELT AUSGESTATTET; 0,35.- WÄRMEDÄMMUNG HORIZONTALE UND VERTIKALE STRUKTUREN: ENTLANG DER (German)
    24 December 2021
    0 references